Repair of NSN 5998-01-176-5358QX RF Switch Mod

Closed Solicitation Posted

Solicitation number
FA825023Q0744
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The contractor is required to provide all necessary facilities, parts, materials, equipment, and services to inspect and potentially restore a specific end item to serviceable condition. This work includes either testing, teardown, and evaluation (TT&E) only, or TT&E and repair. The contractor will also be responsible for reporting the condition of the end item and any necessary repairs to the Procurement Contracting Officer and the Defense Contract Management Agency Administrative Contracting Officer.

  1. Provision of facilities, parts, materials, and equipment.
  2. Inspection of the end item.
  3. Testing, teardown, and evaluation of the end item.
  4. Repair or replacement of failed parts and components.
  5. Reporting on the condition of the end item and any necessary repairs.

Notice text

  1. SCOPE OF WORK:  (Two Step)For the end item, the contractor shall furnish all facilities, parts, materials, equipment and services, required to inspect and, if necessary, restore to serviceable condition.  Services to be performed will not be essential in a crisis situation. Work consists of one of two efforts:  Test, teardown, and evaluation (TT&E) only or TT&E and repair.
      1. TEST, TEARDOWN, AND EVALUATION:  The contractor shall perform visual, mechanical and electrical testing of the end item, reusable or replacement component parts, and materials according to the schedule in the contract to determine the condition of the end item.  Upon completion of this task, all of the components of the end item requiring repair or replacement will be identified by part number, NSN (if applicable), nomenclature, and location in the assembly.  This information will be reported in writing to the Procurement Contracting Officer (PCO)/ Defense Contract Management Agency (DCMA) Administrative Contracting Officer (ACO) and, if necessary, approval to repair will be negotiated.  If no further repair is required, the asset must be returned in serviceable like new condition.
      1. REPAIR: (NTE) The contractor shall perform the repair or replacement of all failed parts and components.  Each end item must be cleaned, configured, refinished, and tested to meet the original specifications of the end item.  The end item shall be returned in serviceable like new condition.

Files

File Type Posted
FA825023Q0744.pdf PDF
3723456_RDL_REPORT.pdf PDF
SOW.pdf PDF
PWS_2Step_NTE.docx DOCX document
3732986_TRNSPDATA_REPORT.pdf PDF
3723529_WAGEDET.xlsx XLSX spreadsheet
CDRLS.pdf PDF
3723505_SQSR.pdf PDF
CAV_AF_Requirements.pdf PDF
3723525_UIIEC_REPORT.pdf PDF
3722925_ITMDESC_REPORT.pdf PDF
3732985_PKGRQMT_REPORT.pdf PDF
SPIRES.pdf PDF
Show all 13

Similar open opportunities

Opportunity Agency Set-aside Responses due
FMS_repair_N0038325PR0R299 Philadelphia, Pennsylvania, United States · NAICS 336413 Naval Supply Systems Command No set-aside
Receiver-transmitte, in repair/modification of NAICS 334220 Naval Supply Systems Command No set-aside
Repair of the B-52 CONECT NAICS 811210 Air Force Sustainment Center No set-aside
N0038326PR0R880_FMS NAICS 334511 Naval Supply Systems Command No set-aside
Electronic componen NAICS 334412 Naval Supply Systems Command No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors