Repair & Maintain Airfield Stormwater System Phase II

Closed Pre-Solicitation Posted

Not the latest version. See the latest pre-solicitation from .

Solicitation number
FGWB21000AB_1
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Marietta, Georgia 30069, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Reserve Command is soliciting proposals for the Repair & Maintain Airfield Stormwater System Phase II project at Dobbins Air Reserve Base in Georgia. The procurement encompasses comprehensive stormwater drainage system repairs and maintenance east of Taxiway 'J', including regrading failed slopes, applying sod for stabilization, cleaning existing flumes, pipes, and swales, and installing new concrete flumes to reestablish positive drainage and prevent erosion and standing water. All contractors must be registered in the System for Award Management (SAM) with active, non-expired registrations, and no foreign participation is permitted. The contract will be awarded on a firm-fixed-price basis with bid, payment, and performance bonds required. The Request for Proposal will be available on or about May 18, 2026, on the Federal Business Opportunities website (sam.gov), with proposals due July 7, 2026, at 2:00 p.m. Eastern Standard Time. Primary contact is Kevin Song, Contract Specialist, at (678) 655-3695 or kevin.song@us.af.mil.

This is a 100% small business set-aside with a small business size standard of $47 million, classified under NAICS code 237110 (Water and Sewer Line and Related Structures Construction) and PSC code Z2NZ (Repair or Alteration of Other Utilities). The contract value is estimated between $10,000,000 and $25,000,000, with a period of performance of 420 calendar days from contract award. No incumbent contractor information is provided in the pre-solicitation notice. Interested contractors should prepare proposals addressing the project requirements and ensure compliance with all registration and documentation requirements prior to the July 7, 2026, submission deadline.

Notice text

While not all inclusive, this project encompasses the work necessary to repair the stormwater drainage systems east of Taxiway 'J' on Dobbins ARB. Areas where the slopes have failed or where they have been disturbed from previous repairs will be regraded and have sod applied to obtain stabilization and positive drainage. Work shall include all maintenance items identified in basin III, IV, and V on the airfield. In addition to the work associated with correcting the grades around the airfield, the cleaning of existing flumes, pipes, and swales is required to reestablish proper drainage patterns. New concrete flumes will be installed at various locations throughout the airfield to reestablish positive drainage and prevent future erosion and standing water.

Files

File Type Posted
Pre Solicitation Notice_Drainage 2026_updated_3.pdf PDF

Notice history

Notice Type Posted
Repair & Maintain Airfield Stormwater System Phase II Latest pre-solicitation Pre-Solicitation
Repair & Maintain Airfield Stormwater System Phase II Pre-Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Repair Taxiway Alpha & Bravo - North Auxiliary Airfield North, South Carolina 29112, United States · NAICS 237310 Air Mobility Command Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors