Repair East Street from Blunt to Rodman
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest special notice from .
- Solicitation number
- W52P1J20R5013
- Agency
-
Joint Munitions Command
Army Materiel Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Rock Island IL 61299 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks a contractor to provide construction services for a project to grade, pave, and update the storm sewer system along East Street from Rodman Avenue to Blunt Road and the parking lot of Building 90 in accordance with the Iowa State Urban Design and Specifications Program. The Department of the Army Materiel Command Joint Munitions Command will evaluate proposals using best value determinations. Questions regarding this opportunity must be submitted by June 30, 2020.
This requirement has been set aside for total small business concerns under NAICS 238220, Construction of Highway, Street, Bridge, and Tunnel. Performance and payment bonds will be required for any resultant award valued between $1,000,000 and $5,000,000. The solicitation is anticipated to be released on or around July 10, 2020 and will include a full statement of work detailing requirements for the road and parking lot construction project.
Notice text
2 versions
Update #2 · Latest ·
This pre-solicitation notice is regarding futue solicitation W52P1J20R5013 is to grade and pave and update the storm sewer system along the East Street corridor from Rodman Avenue to Blunt Road and the parking lot of Building 90. The Contractor shall provide construction services for the project. The premise for this project is to remove, re-grade and replace the existing pavement and sidewalk along East Street from Rodman Avenue to Blunt Road including the intersections with North Avenue, East Circle Drive, Ramsey Road, King Drive, Terrace Drive and Blunt Road. East Street along with all side street and entrance connections shall be Portland Cement Concrete (PCC) with reinforcement at the joints with a 6" curb and gutter at 2.5’ width, placed on modified subbase. Subdrain tile shall be installed along the gutter line and tied into new storm intakes. Sidewalk shall be PCC, placed on modified subbase with welded wire fabric. Typical sidewalk width on the west side of East Street shall 10' and the east side shall be 6'. A portion of the sidewalk will be exposed aggregate. Existing storm drainage shall be removed and replaced. The project will also remove, re-grade and replace the existing pavement for the parking lot of Building 90. The parking lot shall be PCC, placed on modified subbase. Storm drainage is designed to flow to the middle of the parking lot where new storm intakes will be installed. The parking lot will be graded to accommodate 6" curb and gutter at a 2.5' width. A PCC sidewalk is being added to portions of the parking lot. The sidewalk shall have an exposed aggregate finish, placed on modified subbase with welded wire fabric. The project shall be constructed using the Iowa State Urban Design and Specifications Program (SUDAS).
This project will be solicited as a small business set-aside competition under NAICS 237310.
Please note, this is a notice that a solicitation is anticipated to be forth coming and will be posted on or around 10 July 2020 with all necessary documents to include the scope of work (SOW).
In accordance with FAR 36.204, the total estimated magnitude of this project is between $1,000,000.00 and $5,000,000.00.
In accordance with FAR 28.102-1, Performance and Payment Bonds will be required for this project.
Please take note that any necessary documents for this buy will be released at time of solicitation. Please contact the POC in this notice if there are any immediate questions.
Update #1 ·
This pre-solicitation notice is regarding futue solicitation W52P1J20R5013 is to grade and pave and update the storm sewer system along the East Street corridor from Rodman Avenue to Blunt Road and the parking lot of Building 90. The Contractor shall provide construction services for the project. The premise for this project is to remove, re-grade and replace the existing pavement and sidewalk along East Street from Rodman Avenue to Blunt Road including the intersections with North Avenue, East Circle Drive, Ramsey Road, King Drive, Terrace Drive and Blunt Road. East Street along with all side street and entrance connections shall be Portland Cement Concrete (PCC) with reinforcement at the joints with a 6" curb and gutter at 2.5’ width, placed on modified subbase. Subdrain tile shall be installed along the gutter line and tied into new storm intakes. Sidewalk shall be PCC, placed on modified subbase with welded wire fabric. Typical sidewalk width on the west side of East Street shall 10' and the east side shall be 6'. A portion of the sidewalk will be exposed aggregate. Existing storm drainage shall be removed and replaced. The project will also remove, re-grade and replace the existing pavement for the parking lot of Building 90. The parking lot shall be PCC, placed on modified subbase. Storm drainage is designed to flow to the middle of the parking lot where new storm intakes will be installed. The parking lot will be graded to accommodate 6" curb and gutter at a 2.5' width. A PCC sidewalk is being added to portions of the parking lot. The sidewalk shall have an exposed aggregate finish, placed on modified subbase with welded wire fabric. The project shall be constructed using the Iowa State Urban Design and Specifications Program (SUDAS).
This project will be solicited as a small business set-aside competition under NAICS 238220.
Please note, this is a notice that a solicitation is anticipated to be forth coming and will be posted on or around 10 July 2020 with all necessary documents to include the scope of work (SOW).
In accordance with FAR 36.204, the total estimated magnitude of this project is between $1,000,000.00 and $5,000,000.00.
In accordance with FAR 28.102-1, Performance and Payment Bonds will be required for this project.
Please take note that any necessary documents for this buy will be released at time of solicitation. Please contact the POC in this notice if there are any immediate questions.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Repair East Street from Blunt to Rodman | Award Notice | |
| Repair East Street from Blunt to Rodman | Special Notice | |
| Repair East Street from Blunt to Rodman | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation | ENDIST Rock Island | Competitive 8(a) | |
| Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1) | Federal Highway Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity