Repair by replacement of existing elevator and dumbwaiter systems
Award Notice Posted
- Solicitation number
- W5J9JE-17-R-0002
- Agency
-
ENDIST Far East
US Army Corps of Engineers, Department of Defense
- Awarded
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W5J9JE17C0007 Federal contract award
- NAICS code
- 238290 Other Building Equipment Contractors
- PSC
- Not on record
- Place of performance
- Kabul National Military Hospital Kabul, Afghanistan
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Notice posted under incorrect location, will be re-posted under correct location.
Update #1 ·
Remove thirteen (13) existing elevators and three (3) existing dumbwaiters. All elevators and dumbwaiters systems shall be removed in their entirety, to include all associative system in hoist ways and machine rooms.
Provide and install thirteen (13) new elevators and three (3) new dumbwaiters. New conveying system shall be full and complete, and all associative components and must be completed before starting work on the succeeding phase. First phase must be completed before construction/proceeding onto the second phase.
Contractor shall provide and install all aspects of new conveying system to include but not limited to:
- Elevator cab, motor, control panels, guiderails, trim finishes
- Pit ladder
- Door support angles
- Lighting, switches, outlets and conduit
- Phone circuits, branch circuits
- Venting, heating and cooling as required per code
Contractor/elevator and dumbwaiter manufacturer shall design new elevator/dumbwaiter systems, and adapt those systems to existing site conditions as required for fully functioning, code compliant installations.
New elevators and dumbwaiters shall be quantities, locations, dimensions, and capacities as required in the specifications.
All new elevators shall be of one manufacturer, all new dumbwaiters shall be of one manufacturer. Multiple manufacturers will not be accepted.
New elevators controllers shall include all Life Safety capabilities as required and meet all aspects of either U.S. or European elevator codes.
The project shall include but not be limited to all verifications of existing conditions, material, labor, and equipment as necessary to complete installation of new elevators and dumbwaiters.
Contractor shall have experience providing and installing Geared Electric Traction elevators of general criteria as follows:
2 to 10 floors
Overhead Machine Rooms
Hospital elevators with all features for accessibility and non-ambulatory occupants.
•- Project shall/will meet all aspects of either U.S. or European elevator codes.
Files
| File | Type | Posted |
|---|---|---|
| W5J9JE-17-R-0002_Synopsis.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Repair By Replacement Of Existing Elevator & Dumbwaiter Systems | Award Notice | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity