Repair B440 Blaze Hangar, T7 Electrical Upgrades
Closed Pre-Solicitation Posted
- Solicitation number
- EEPZ243754
- Agency
-
Air Education and Training Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- Place of performance
- Columbus, Mississippi 39710, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Air Education and Training Command is seeking a contractor to retrofit Building 440, the Blaze Hangar, at Columbus Air Force Base in preparation for the new T-7 aircraft. The key objectives include upgrading the 480V electrical distribution system, the 400 Hz electrical distribution system, and restriping the hangar floor to accommodate the larger T-7. The work must be performed according to the Statement of Work, Air Force requirements, and other applicable codes and references. Key deliverables include design documents, construction drawings, schedules, and analysis at various design completion stages, with the final 100% design documents requiring Professional Engineer stamps.
This procurement is set aside for small businesses. The estimated range of magnitude for this project is between $1,000,000 and $5,000,000. Respondents should provide business details, socioeconomic status, past experience, bonding capacity, and plans for subcontracting. The deadline for submitting responses to the Sources Sought Announcement is June 24, 2024.
Notice text
See Statement of Work for further description.
SUMMARY
The Contractor must provide all plant, labor, equipment, transportation, and tools required to retrofit building 440, The Blaze Hangar, in preparation for the T-7. The work shall include but is not limited to: the retrofit of the 480V electrical distribution system, the 400 Hz electrical distribution system, the restriping of the floor to align with the size and parking spaces for the T-7. Perform all work according to this Statement of Work (SOW), all related AF requirements, and other codes and references.
BACKGROUND
With the roll out of a new airframe the existing facilities will need to be retrofitted to accommodate it. The size of the T-7 is different from the T-38 and the floor stripping will need to be adjusted to account for this. The electrical foot print of the T-7 is higher than the T-38 and the existing power stations and 400 Hz system in the hangar will need to be upgraded.
Files
| File | Type | Posted |
|---|---|---|
| B440 Sources Sought.pdf | ||
| SOW EEPZ243754 Repair Blaze Hangar T7 Electrical Upgrades B440.docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WWYK250063 - install react VII facility, B9001, post V19 | Air Force Sustainment Center | Woman-Owned Small Business | |
| Repair Aeronautics Laboratory - USAFA | ENDIST Omaha | No set-aside | |
| Adal building 78, BCE and fire facility | Pennsylvania National Guard | No set-aside | |
| Sources Sought - Construction Repair Building 6413 Secure Space (511669 & 519580) Barksdale AFB | ENDIST Fort Worth | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity