Repair Assault Landing Zone (ALZ) Runway, Atlus AFB, Oklahoma
Award Notice Posted
- Solicitation number
- w912bv17r0029
- Agency
-
ENDIST Tulsa
US Army Corps of Engineers, Department of Defense
- Awarded
- to Duininck, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912BV17C0017 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Altus AFB, Oklahoma, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
This is a solicitation of an unrestricted procurement to Repair Assault Landing Zone Runway at Altus Air Force Base, Oklahoma under NAICS 237310.
The requirement is to perform the Repair the Assault Landing Zone (ALZ) by replacing the existing Asphaltic Cement Concrete (ACC) with Portland Cement Concrete (PCC). Requirement consists of 34, 282 sm of runway, 16,900 sm of shoulder, and 8,090 sm of overrun area. Remove existing ACC surface (59, 272 sm) and enough base course to accommodate a sufficient thickness of PCC to handle the expected loading from C-17 Assault Landings and install the design thickness of PCC. This project will comply with local, state, or federal laws, rules or regulations regarding demolition and disposal of debris and materials.
• Remove existing asphalt runway surface, asphalt shoulders, and asphalt overruns.
• Remove existing runway lights and lighting infrastructure.
• Install new runway surface composed of a suitable thickness of Portland Cement Concrete. Also provide new asphalt shoulders and runway overruns.
• Provide all necessary runway markings.
• Install new runway lighting system and supporting infrastructure.
The Construction Cost Magnitude of this project is between $10,000,000 and $25,000,000.
Update #1 ·
This is a presolicitation notice of an unrestricted procurement to Repair Assault Landing Zone Runway at Altus Air Force Base, Oklahoma under NAICS 237310.
The requirement is to perform the Repair the Assault Landing Zone (ALZ) by replacing the existing Asphaltic Cement Concrete (ACC) with Portland Cement Concrete (PCC). Requirement consists of 34, 282 sm of runway, 16,900 sm of shoulder, and 8,090 sm of overrun area. Remove existing ACC surface (59, 272 sm) and enough base course to accommodate a sufficient thickness of PCC to handle the expected loading from C-17 Assault Landings and install the design thickness of PCC. This project will comply with local, state, or federal laws, rules or regulations regarding demolition and disposal of debris and materials.
• Remove existing asphalt runway surface, asphalt shoulders, and asphalt overruns.
• Remove existing runway lights and lighting infrastructure.
• Install new runway surface composed of a suitable thickness of Portland Cement Concrete. Also provide new asphalt shoulders and runway overruns.
• Provide all necessary runway markings.
• Install new runway lighting system and supporting infrastructure.
The Construction Cost Magnitude of this project is between $10,000,000 and $25,000,000.
Files
| File | Type | Posted |
|---|---|---|
| W912BV-17-R-0029-0001.pdf | ||
| ALZ_Runway_pre-bid_site_visit_sign-in_sheet_(27-Jun-2017).pdf | ||
| Altus_Drawings.pdf | ||
| W912BV17R0029_Soliciation_for_FBO.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Award Notice | |
| Repair Assault Landing Zone (ALZ) Runway, Atlus AFB, Oklahoma | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity