Repair Aqueous Film Forming Foam (AFFF) Pond

Closed Pre-Solicitation Posted

Solicitation number
FA3099-18-R-0007
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238190 Other Foundation, Structure, and Building Exterior Contractors
PSC
Not on record
Place of performance
Laughlin AFB Laughlin, Texas 78843, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

 

 


Based on new changes to the Federal Acquisition Regulations (FAR) we are canceling this requirement at this time. Laughlin will reassess this project based on new changes per the FAR. 

Update #3 ·

This solicitation will be reposted with standard Form 1442.

Update #2 ·

SCOPE OF WORK
This project includes, but is not limited to, the Construction or Reconstruction of the Aqueous Film Forming Foam (AFFF) Pond. Consisting of excavation, demolition of existing concrete footings, chain link fencing, and removal of all vegetation. The Contractor shall furnish all labor, materials, equipment, tools, transportation and supplies, and perform all work required according to the drawings and specifications of the contract. The North American Industry Classification System (NAICS) code for this acquisition is 238190. All responsible sources may submit a proposal which shall be considered. The Government anticipates award of a firm-fixed price contract as a result of the solicitation. All prospective offerors must be registered in the System for Award Management (SAM) to award. Registration may be accomplished at website, https://www.sam.gov.

PROJECT LOCATION
The project work area is located next to building 508 at Laughlin AFB, Texas.

APPLICABLE SPECIFICATIONS
The project shall conform to all applicable Federal, State and local laws, regulations and base-specific standards and applicable Unified Facilities Criteria (UFC). Where there is a conflict between the referenced standards, the most stringent shall take precedence. All work accomplished by the Contractor shall comply with these criteria unless a waiver is obtained from the Laughlin AFB when conditions warrant such consideration.

ESTIMATED PROJECT COMMENCEMENT DATE
August 6, 2018

ESTIMATED DAYS FOR CONSTRUCTION
Construction period of performance for this work project shall be 60 calendar days.

TECHNICAL POINT OF CONTACT
Lt Karson Artero

SITE INVESTIGATION
Contractor(s) will have access to the site prior to proposal. Designated date is forthcoming.

Update #1 ·

SCOPE OF WORK
This project includes, but is not limited to, the Construction or Reconstruction of the Aqueous Film Forming Foam (AFFF) Pond. Consisting of excavation, demolition of existing concrete footings, chain link fencing, and removal of all vegetation. The Contractor shall furnish all labor, materials, equipment, tools, transportation and supplies, and perform all work required according to the drawings and specifications of the contract. The North American Industry Classification System (NAICS) code for this acquisition is 238190. All responsible sources may submit a proposal which shall be considered. The Government anticipates award of a firm-fixed price contract as a result of the solicitation. All prospective offerors must be registered in the System for Award Management (SAM) to award. Registration may be accomplished at website, https://www.sam.gov.

PROJECT LOCATION
The project work area is located next to building 508 at Laughlin AFB, Texas.

APPLICABLE SPECIFICATIONS
The project shall conform to all applicable Federal, State and local laws, regulations and base-specific standards and applicable Unified Facilities Criteria (UFC). Where there is a conflict between the referenced standards, the most stringent shall take precedence. All work accomplished by the Contractor shall comply with these criteria unless a waiver is obtained from the Laughlin AFB when conditions warrant such consideration.

ESTIMATED PROJECT COMMENCEMENT DATE
August 6, 2018

ESTIMATED DAYS FOR CONSTRUCTION
Construction period of performance for this work project shall be 60 calendar days.

TECHNICAL POINT OF CONTACT
Lt Karson Artero

SITE INVESTIGATION
Contractor(s) will have access to the site prior to proposal. Designated date is forthcoming.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors