This Award Notice is for the repair and renovation of the Storm Water Lift Station, Building 986, at Naval Air Station Lemoore, CA, issued by the Department of the Navy Naval Facilities Engineering Command. The awarded contract includes removing and replacing the existing lift pumps and sump pumps, as well as the electrical system, with new equipment. The base contract is valued at $8,995,000 and includes options for additional work such as removing and replacing two additional lift pumps, providing a new catwalk, and cleaning and repairing the inlet and outlet basins. Key details include the provision of new lift pumps with a capacity of 47,000 gallons per minute and sump pumps with a capacity of 1,400 gallons per minute.

Notice text

1.3.1.1 Base Contract:
a. Remove trash, and drain the inlet basin and the sump pits.
b. Provide temporary bypass pumping service from inlet basin to outlet
basin during the work until successful commissioning of new electrical
system.
c. Remove existing Lift pump D2, associated motor, appurtenances, pipe
supports and piping other than the section embedded in the concrete
wall. Existing Lift pumps D1 and D3 and their associated motor,
appurtenances and piping remain during Base Contract (see appendix B1:
Contract drawings).
d. Remove existing Sump pumps (S1 and S2), associated motors,
appurtenances and suction piping. The discharge piping must remain.
e. Remove the existing fencing around electrical substation and
equipment.
f. Remove all electrical equipment and components, including but not
limited to unit substation enclosure, transformers, disconnect
switches, HV fuses, cables to pump motors, control cables, and
existing aboveground and underground conduits.
g. Demolish existing concrete foundation of electrical equipment.
h. Provide the following items:
1. one new Lift pump package (D2) including, but not limited to
electromotor, pump, coupling and appurtenances . The pump must be
axial flow type with total dynamic head (TDH) of 14 feet and
capacity of 47,000 gallon per minutes (GPM). Consider 200 to 250
horsepower (hp) for the associated electromotor rating. Apply
coating to exposed metal surfaces, if any.
2. Lift pump discharge piping, supports and connections. Connect
the new discharge lines to the existing pipes embedded in the
concrete wall. Repair the embedded pipe as needed. Apply coating.
3. Two new Sump pump packages (S1 and S2) including electromotors,
pumps, couplings and appurtenances. The pumps must be axial flow
type with TDH of 25 feet and capacity of 1400 GPM. Consider 15 hp
for the associated electromotors rating. Connect the new pumps
discharge to the existing discharge piping. Apply coating to
exposed metal surfaces, if any.
4. Build new concrete foundation for electrical equipment.
5. New electrical components for all three Lift pumps and both
Sump pumps, including but not limited to electromotors, unit
substation enclosure, transformers, disconnect switches, HV fuses,
cables to pump motors, control cables, and aboveground and
underground conduits in accordance with Contract drawings and
specifications.
6. New fence around the electrical equipment on the new concrete
foundation.
i. Connect the new electrical system to Lift pumps D2 and D3 as well
as Sump pumps S1 and S2, supply power and make pumps D2, D3, S1 and S2
ready for normal operation.


1.3.1.2 Option 1:
a. Remove trash and drain the inlet basin.
b. Disconnect the existing Lift pump D3 from the electrical system.
Remove existing Lift pumps D1 and D3, associated motors,
appurtenances, pipe supports and piping other than the section
embedded in the concrete wall.
c. Provide the following items:
1. Two new identical Lift pump packages D1 and D3, including, but
not limited to electromotors, pumps, couplings and appurtenances.
The pumps must be axial flow type with total dynamic head (TDH) of
14 feet and capacity of 47,000 gallon per minutes (GPM). Consider
200 to 250 horsepower (hp) for the associated electromotors
rating. Apply coating to exposed metal surfaces, if any.
2. Lift pumps discharge piping, supports and connections. Connect
the new discharge lines to the existing pipes embedded in the
concrete wall. Repair the embedded pipes as needed. Apply coating.
d. Connect the new electrical system to the new Lift pumps D1 and D3,
supply power and make pumps D1 and D3 ready for normal operation.


1.3.1.3 Option 2
a. Provide and install new catwalk.
b. Remove rust, clean and prepare the existing stair, ladder,
railings, trash rack brackets, catwalk and flap gates for coating.
Apply coating.


1.3.1.4 Option 3
a. Remove trash and drain the inlet basin.
b. Inlet Basin: Clean concrete surfaces and remove loose concrete.
Where the rebars are exposed, remove the rust and coat the steel
surfaces with coating. Repair the damaged concrete surfaces and seal
the cracks. Apply Epoxy coating to concrete surfaces from floor to
high level alarm water elevation. Perform the work in accordance with
section 03 01 00 REHABILITATION OF CONCRETE and section 09 96 00
HIGH-PERFORMANCE COATINGS.
c. Outlet Basin: Clean concrete surfaces and remove loose concrete.
Where the rebars are exposed, remove the rust, clean and coat the
metal surfaces with coating. Repair the damaged concrete surfaces and
seal the cracks. Apply Epoxy coating to concrete surfaces from floor
to high level alarm water elevation. Perform the work in accordance
with section 03 01 00 REHABILITATION OF CONCRETE and section 09 96 00
HIGH-PERFORMANCE COATINGS.
d. Transport the existing trash racks from stored location to the job
site. Remove rust, clean and prepare for coating. Apply coating.
Provide the missing wall bracket. Install the trash racks.


1.3.2 Location
The work is located at Naval Air Station Lemoore (NASL) Stormwater Lift
Station (B-986), approximately as indicated on the Contract drawings. The
exact location will be shown by the Construction Manager (CM).

Awarded contract N62473-19-D-1202 to FRAWNER CORPORATION for 8995000.00 on 2024-05-09.

Files

File Type Posted
Drawings_B986 Lift Station.pdf PDF