Rental- 800 LPAC System- Naval Base Point Loma, San Diego, CA (PLOMA) Amendment 0002
Closed Solicitation Posted
- Solicitation number
- N3904027Q0010
- Agency
-
Naval Sea Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- PSC
- 4310 Compressors And Vacuum Pumps
- Place of performance
- San Diego, California 92152, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
Portsmouth Naval Shipyard, operating under Naval Sea Systems Command, seeks to rent one electric 800 CFM low-pressure air compressor (oil-free) for Naval Base Point Loma, San Diego, California, with responses due October 21, 2026 at 12:30 PM EST. This is a Total Small Business Set-Aside under NAICS 532490 with a $40.0 million size standard.
Place of performance is Naval Base Point Loma, San Diego, California. The compressor must deliver 800 SCFM at 125 PSIG maximum system pressure with regulated delivery at 115 PSIG, be UL-listed, weatherproof for outdoor operation across −10°F to 110°F ambient conditions, and feature freeze protection. The contractor must supply and pre-connect a 1000-gallon ASME air receiver tank (150 PSIG minimum), an 800 CFM desiccant dryer achieving −40°F pressure dew point, a distribution manifold with six 1.25-inch outputs, 250 feet of 3-inch air hose, and 200 feet of 460 VAC 3-phase power cable with Camlok connections. Discharge air temperature shall not exceed 100°F operating in ambient up to 110°F. The contractor must route up to 1500 feet of emergency-stop cabling and is responsible for making final electrical connections; the government handles shipboard air routing and connections.
The base period runs November 2, 2026 through December 6, 2026 (5 weeks), with an optional extension December 7–20, 2026 (2 weeks). Personnel accessing the base must be U.S. citizens with valid identification and base access badges. Complete start-up, commissioning, and weekly preventative maintenance by qualified technicians are required, with repair within twelve hours or replacement within twenty-four hours at no extra cost. Award goes to the lowest-price technically acceptable vendor. Vendors must register in SAM and submit quotes via email with complete pricing, technical specifications, equipment brochures, and documentation of any specification exceptions. Amendment 0002 clarifies that two coordinated 400 CFM units do not satisfy the single 800 CFM requirement.
Notice text
3 versions
Update #3 · Latest ·
Amendement 0002 is isuued to extend this solication to provide responses to vendor questions received on October 20, 2026. Please see the responses below, provided in bold:
Question: would the government accept two Aggreko 400 CFM electric, oil-free compressors operating as one coordinated 800 CFM system, provided all applicable performance, safety, and electrical requirements are satisfied.
Answer: No
Question: please clarify the requirement for a maximum discharge-air temperature of 100°F while operating in ambient temperatures up to 110°F
Answer: Discharge of the compressor shall have a maximum temperature of 100 deg F while it operates outside in the sun in an environment that may reach 110 deg F
Question: could you please confirm whether the contractor is also responsible for routing air hoses throughout the ship and connecting them to individual shipboard air inlets, or whether those connections will be handled by government personnel?
Answer: The shipboard routing and connections will be handled by government personnel
Amendement 0001 is isuued to provide responses to vendor questions received om October 19, 2026. Please see the responses below, provided in bold:
Question: Will the compressor operate continuously, 24 hours per day, seven days per week? If not, what are the estimated operating hours per week?
Answer:The project will use this compressor whenever is needed for as long as needed.
Question: Is the required 800 SCFM measured at the compressor discharge or at the point of use after accounting for dryer purge consumption?
Answer: The discharge of the compressor
Question: Please confirm the government will provide suitable electrical sources for both the compressor and dryer. Who is responsible for making the final electrical connections?
The government will provide suitable electrical sources, however, the contractor will be responsible for making the final connection.
Q: Can the government provide an estimated routing distance or layout for the remote emergency-stop cable so we can price the installation accurately?
Answer: The contractor shall be prepared to provide and route up to 1500 ft of e stop cabling.
Q: CLIN 0003 covers training during the five-week base period. Should any training required during the optional extension be included in CLIN 1001?
Answer: No training required for the optional extension CLIN 1001
Rental of one (1) Electric 800 CFM Low Pressure Air Compressor (oil free) Naval Base Point Loma, San Diego, CA PLOMA
Portsmouth Naval Shipyard (PNSV) is seeking to rent one (1) Electric 800 CFM Low Pressure Air Compressor (oil free). The Statement of Work (SOW) outlines the specifications that meet the essential requirements for the procurement of rental equipment necessary to to establish a tool air system. The application for this equipment is located at Naval Base Point Loma, San Diego, CA PLOMA.
Solicitation Number: N3904027Q0010
Response Deadline: October 21, 2026, at 12:30 PM (EST)
POC: Bob Watters, robert.n.watters.civ@us.navy.mil
Required Delivery Date/Period of Performance:
Base period: 11/02/2026 - 12/06/2026 (5 weeks)
Option Period 1: 12/07/2026 - 12/20/2026 (2 - weeks)
Place of Performance: Naval Base Point Loma, San Diego, CA PLOMA
METHOD OF PROPOSAL SUBMISSION
Offers shall be emailed. All responsible sources may submit a quote which shall be considered by the agency.
System for Award Management (SAM): Vendors must be registered in the SAM database to be considered for award.
Registration is free and can be completed on-line at http://www.sam.gov/.
All quotes shall include the embedded Request for Quote (RFQ). All quotes must have the highlighted sections completed.
Please make sure to include all technical data sheets and information relating to the rental equipment.
Update #2 ·
Amendement 0001 is isuued to provide responses to vendor questions received om October 19, 2026. Please see the responses below, provided in bold:
Question: Will the compressor operate continuously, 24 hours per day, seven days per week? If not, what are the estimated operating hours per week?
Answer:The project will use this compressor whenever is needed for as long as needed.
Question: Is the required 800 SCFM measured at the compressor discharge or at the point of use after accounting for dryer purge consumption?
Answer: The discharge of the compressor
Question: Please confirm the government will provide suitable electrical sources for both the compressor and dryer. Who is responsible for making the final electrical connections?
Answer: The government will provide suitable electrical sources, however, the contractor will be responsible for making the final connection.
Q: Can the government provide an estimated routing distance or layout for the remote emergency-stop cable so we can price the installation accurately?
Answer: The contractor shall be prepared to provide and route up to 1500 ft of e stop cabling.
Q: CLIN 0003 covers training during the five-week base period. Should any training required during the optional extension be included in CLIN 1001?
Answer: No training required for the optional extension CLIN 1001
Rental of one (1) Electric 800 CFM Low Pressure Air Compressor (oil free) Naval Base Point Loma, San Diego, CA PLOMA
Portsmouth Naval Shipyard (PNSV) is seeking to rent one (1) Electric 800 CFM Low Pressure Air Compressor (oil free). The Statement of Work (SOW) outlines the specifications that meet the essential requirements for the procurement of rental equipment necessary to to establish a tool air system. The application for this equipment is located at Naval Base Point Loma, San Diego, CA PLOMA.
Solicitation Number: N3904027Q0010
Response Deadline: October 21, 2026, at 12:30 PM (EST)
POC: Bob Watters, robert.n.watters.civ@us.navy.mil
Required Delivery Date/Period of Performance:
Base period: 11/02/2026 - 12/06/2026 (5 weeks)
Option Period 1: 12/07/2026 - 12/20/2026 (2 - weeks)
Place of Performance: Naval Base Point Loma, San Diego, CA PLOMA
METHOD OF PROPOSAL SUBMISSION
Offers shall be emailed. All responsible sources may submit a quote which shall be considered by the agency.
System for Award Management (SAM): Vendors must be registered in the SAM database to be considered for award.
Registration is free and can be completed on-line at http://www.sam.gov/.
All quotes shall include the embedded Request for Quote (RFQ). All quotes must have the highlighted sections completed.
Please make sure to include all technical data sheets and information relating to the rental equipment.
Update #1 ·
Rental of one (1) Electric 800 CFM Low Pressure Air Compressor (oil free) Naval Base Point Loma, San Diego, CA PLOMA
Portsmouth Naval Shipyard (PNSV) is seeking to rent one (1) Electric 800 CFM Low Pressure Air Compressor (oil free). The Statement of Work (SOW) outlines the specifications that meet the essential requirements for the procurement of rental equipment necessary to to establish a tool air system. The application for this equipment is located at Naval Base Point Loma, San Diego, CA PLOMA.
Solicitation Number: N3904027Q0010
Response Deadline: October 21, 2026, at 12:30 PM (EST)
POC: Bob Watters, robert.n.watters.civ@us.navy.mil
Required Delivery Date/Period of Performance:
Base period: 11/02/2026 - 12/06/2026 (5 weeks)
Option Period 1: 12/07/2026 - 12/20/2026 (2 - weeks)
Place of Performance: Naval Base Point Loma, San Diego, CA PLOMA
METHOD OF PROPOSAL SUBMISSION
Offers shall be emailed. All responsible sources may submit a quote which shall be considered by the agency.
System for Award Management (SAM): Vendors must be registered in the SAM database to be considered for award.
Registration is free and can be completed on-line at http://www.sam.gov/.
All quotes shall include the embedded Request for Quote (RFQ). All quotes must have the highlighted sections completed.
Please make sure to include all technical data sheets and information relating to the rental equipment.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Rental (1) 400 LPAC System- NLON- Groton, CT | Naval Sea Systems Command | Total Small Business | |
| Full & Open Brand Name OEM "Curtiss-Wright Electro-Mechanical Corp" - Low Pressure Air Compressor (LPAC) Maintenance Services | Naval Supply Systems Command | No set-aside | |
| Rental of Propane Water Heater (600, 000 BTU/hr) and associated components | Naval Sea Systems Command | Total Small Business | |
| Diesel 20K Ultra High Pressure (UHP) Trailer | Naval Sea Systems Command | No set-aside | |
| Compressor, rotary | Naval Supply Systems Command | No set-aside |