N3904027Q1010 Attachment 3 - Unit Specification Checklist.pdf
PDF 193 KB Posted
- Solicitation number
- N3904027Q0010
About this file
This is a Statement of Work (SOW) compliance checklist for a compressed air system procurement. The document requires contractors to indicate whether their proposed equipment and services comply with all SOW specifications and to identify any exceptions with explanations.
The equipment requirements include a 200HP oil-free rotary screw air compressor (LPAC) capable of 115PSIG pressure output with remote emergency stop, air-cooled design, 3-inch compressor connection, maximum 400A operating amperage, single 460VAC circuit operation, outdoor suitability, freeze protection, and UL listing. Supporting equipment must include a 200-foot electrical power cable with Camlok connections rated for the required amperage, a 1000-gallon ASME-rated air receiving tank with 3-inch connection and 150PSIG minimum working pressure, a desiccant air dryer with 800SCFM flow rate, -40°F pressure dew point, 120VAC single-phase 20A power, 150PSIG rated working pressure, outdoor suitability, ≤18% LPA consumption, and UL listing. The system also requires a 3-inch inlet/outlet manifold with minimum six 1.25-inch output connections and isolation valves on each output, plus 250 feet of 3-inch air hose in 50-foot sections with SPUD connections, 150PSI minimum working pressure, and safety restraint devices. Services required include equipment start-up and commissioning, preventative maintenance, training, and deliverables documentation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMPLIANCE WITH SOW. EXCEPTIONS TO SOW.
(See Instructions Below) (See Instructions Below)
Equipment
3.2-3.4 200HP LPAC
100% Oil free air
Air pressure set point: 115PSIG
Remote E-Stop provided and connected
Air cooled
Compressor connection:3-IN
Max. operating amps: 400A
Operate from one 460VAC circuit
Suitable for outdoor operation
Freeze protection
UL listed
3.3 Electrical Power Cable
200ft in length
Camlok connections
Capable of supporting amperage
3.4 Operating and Safety Controls
3.5 1000 Gallon Air Receiving Tank
ASME rated
Pressure relief valve
Air receiver connection:3-IN
Min. working pressure rating: 150 PSIG
3.6 Desiccant Air Dryer
Flow rate: 800SCFM
Air dryer connection:3-IN
-40°F pressure dew point
120 VAC, single phase, 20A
Rated working pressure: 150PSIG
Suitable for outdoor use
≤18% LPA consumption
UL listed
SOW REQUIREMENT
3.8 3-IN Air Hose
250-FT total length
50-FT sections
SPUD Connections
Min. Working pressure:150PSI
Safety restraint devices
3.8 Required Fittings and Adapters
3.7 Manifold
3-IN inlet
3-IN outlet
Min. (6) 1.25-IN Connections
Isolation valves on each output
Services
3.9 Equipment Start-up and Commissioning Services
6.3 Preventative Maintenance
6.4 Training
6.5 Deliverables
(ii) Explain reason for exception.
INSTRUCTIONS
1. COMPLIANCE WITH SOW.
(i) Use YES or NO to identify if equipment and services comply with all SOW requirements.
(ii) Ensure answers are consistent with any brochures, specification sheets or other descriptive literature provided in your quote.
2. EXCEPTIONS TO SOW.
(i) Identify any exceptions to the SOW. Note: answers are required for any NO in prior column.
File details come from the government source that posted it. Updated .