N3904027Q1010 Attachment 3 - Unit Specification Checklist.pdf

PDF 193 KB Posted

Attached to
Rental- 800 LPAC System- Naval Base Point Loma, San Diego, CA (PLOMA) Amendment 0002
Solicitation number
N3904027Q0010
Issued by

About this file

This is a Statement of Work (SOW) compliance checklist for a compressed air system procurement. The document requires contractors to indicate whether their proposed equipment and services comply with all SOW specifications and to identify any exceptions with explanations.

The equipment requirements include a 200HP oil-free rotary screw air compressor (LPAC) capable of 115PSIG pressure output with remote emergency stop, air-cooled design, 3-inch compressor connection, maximum 400A operating amperage, single 460VAC circuit operation, outdoor suitability, freeze protection, and UL listing. Supporting equipment must include a 200-foot electrical power cable with Camlok connections rated for the required amperage, a 1000-gallon ASME-rated air receiving tank with 3-inch connection and 150PSIG minimum working pressure, a desiccant air dryer with 800SCFM flow rate, -40°F pressure dew point, 120VAC single-phase 20A power, 150PSIG rated working pressure, outdoor suitability, ≤18% LPA consumption, and UL listing. The system also requires a 3-inch inlet/outlet manifold with minimum six 1.25-inch output connections and isolation valves on each output, plus 250 feet of 3-inch air hose in 50-foot sections with SPUD connections, 150PSI minimum working pressure, and safety restraint devices. Services required include equipment start-up and commissioning, preventative maintenance, training, and deliverables documentation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMPLIANCE WITH SOW. EXCEPTIONS TO SOW.

(See Instructions Below) (See Instructions Below)

Equipment

3.2-3.4 200HP LPAC

100% Oil free air

Air pressure set point: 115PSIG

Remote E-Stop provided and connected

Air cooled

Compressor connection:3-IN

Max. operating amps: 400A

Operate from one 460VAC circuit

Suitable for outdoor operation

Freeze protection

UL listed

3.3 Electrical Power Cable

200ft in length

Camlok connections

Capable of supporting amperage

3.4 Operating and Safety Controls

3.5 1000 Gallon Air Receiving Tank

ASME rated

Pressure relief valve

Air receiver connection:3-IN

Min. working pressure rating: 150 PSIG

3.6 Desiccant Air Dryer

Flow rate: 800SCFM

Air dryer connection:3-IN

-40°F pressure dew point

120 VAC, single phase, 20A

Rated working pressure: 150PSIG

Suitable for outdoor use

≤18% LPA consumption

UL listed

SOW REQUIREMENT

3.8 3-IN Air Hose

250-FT total length

50-FT sections

SPUD Connections

Min. Working pressure:150PSI

Safety restraint devices

3.8 Required Fittings and Adapters

3.7 Manifold

3-IN inlet

3-IN outlet

Min. (6) 1.25-IN Connections

Isolation valves on each output

Services

3.9 Equipment Start-up and Commissioning Services

6.3 Preventative Maintenance

6.4 Training

6.5 Deliverables

(ii) Explain reason for exception.

INSTRUCTIONS

1. COMPLIANCE WITH SOW.

(i) Use YES or NO to identify if equipment and services comply with all SOW requirements.

(ii) Ensure answers are consistent with any brochures, specification sheets or other descriptive literature provided in your quote.

2. EXCEPTIONS TO SOW.

(i) Identify any exceptions to the SOW. Note: answers are required for any NO in prior column.

File details come from the government source that posted it. Updated .