Remove and replace asphalt parking lot/alley, Bldg. 104 NAVSTA Great Lakes
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- N4008520R2111
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Great Lakes, Illinois 60088, United States
Notice details come from SAM.gov. Updated .
Notice text
This is a pre-solicitation notice. This notice does NOT constitute a request for proposal, request for quote, or invitation for bid. Request for Proposal, with scope, shall be posted on or after 9 March 2020. The set-aside for this acquisition is Service Deisabled, Veteran Owned Small Business. The activity small business office concurs with the decision.
Contractor shall supply all labor, materials, equipment, transportation and supervision necessary to prove a full-depth repair of the parking lot and alley adjacent to Building 104 located onboard Naval Station Great Lakes, IL. Remove asphalt pavement to the aggregate base. Haul away and sweep area clean of debris. Regrade base and provide additional crushed aggregate as necessary to provide positive drainage to existing storm inlets and away from adjacent buildings. Compact aggregate base and provide 3.5” compacted asphalt pavement section. Upon completion, re-stripe as to current and existing specifications. All materials, equipment, and procedures must be in accordance with UFC 3-270-01, O&M Manual: Asphalt and Concrete Pavement Maintenance and Repair, UFC 3-201-01, Civil Engineering, and all other applicable codes/standards. Any contracted work performed on Naval Station Great Lakes is required to follow/meet Illinois Department of Transportation (IDOT) regulations/certifications.
Approximate Quantities:
Pavement removal and replacement: 12,500 SF
Mill and overlay: 6,000SF
Concrete removal and pavement replacement: 2,000 SF
The building will be occupied during construction. The period of performance for this work is 180 calendar days from date of award. Construction work will not be performed between 1 November and 1 April.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Remove and replace asphalt parking lot/alley, Bldg. 104 NAVSTA Great Lakes | Award Notice | |
| Remove and replace asphalt parking lot/alley, Bldg. 104 NAVSTA Great Lakes | Solicitation | |
| This notice | Pre-Solicitation | |
| Remove and replace asphalt parking lot/alley, Bldg. 104 NAVSTA Great Lakes | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity