Remediation and restoration activities
Cancelled Solicitation Posted
- Solicitation number
- 6913G626Q300029
- Agency
-
Immediate Office of the Secretary of Transportation
Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238910 Site Preparation Contractors
- PSC
- F999 Other Environmental Services
- Place of performance
- Chantilly, Virginia 20151, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Transportation's Volpe National Transportation Systems Center, supporting the Federal Aviation Administration's Facilities Environmental Cleanup Program, seeks remediation and restoration of contaminated soil at three facilities in the FAA Eastern Service Area, with proposals due June 10, 2026 at 2:00 PM ET and questions due June 2, 2026 at 1:00 PM ET. This is a Total Small Business set-aside.
Place of performance spans three sites: BHM ASR in Birmingham, Alabama; CXY LOM in New Cumberland, Pennsylvania; and IADN NASEB in Chantilly, Virginia. The work is firm fixed price with three contract line items, one per site.
At BHM ASR, the contractor must remove approximately 15 cubic yards of soil at 18–24 inches depth exceeding total petroleum hydrocarbon–diesel range organics (TPH-DRO) and oil range organics (TPH-ORO) thresholds. At CXY LOM, approximately 15 cubic yards at 18 inches depth must be excavated for lead contamination, with x-ray fluorescence field screening guiding final extent. At IADN NASEB, approximately 3 cubic yards at depths up to 5 feet require removal for TPH-DRO exceedance; confirmation sampling is not required at this site. The contractor shall submit a draft Remediation and Restoration Work Plan within ten business days of kick-off, addressing technical approach, site safety, and risk management. The government performs all confirmatory sampling; the contractor is responsible for waste characterization sampling and disposal paperwork. Work shall be performed Monday through Friday, 8:00 a.m. to 4:30 p.m., excluding federal holidays, with performance through September 15, 2026.
The NAICS code is 238910, Site Preparation Contractors, with a size standard of $1.9 million. Service Contract Act wage determinations apply in each jurisdiction. Award is based on descending order of importance: firm fixed price (cost buildup detail required), schedule, technical narrative (2 pages per CLIN), and past performance. Proposals shall include firm fixed pricing for labor and equipment plus detailed pricing for laboratory analysis, survey, equipment rentals, trucking, disposal, and permits. The Contracting Officer is Roland Regan; the Technical Point of Contact is Haley Talbot-Wendlandt; the Contracting Officer's Representative is Michelle Heimgartner.
Notice text
Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at three facilities in the FAA Eastern Service Area (ESA) to remove identified soil contamination.
I) SITE FOR CONTAMINATED SOIL REMEDIATION: The sites requiring remediation for lead- and total petroleum hydrocarbon (TPH) -contaminated soils are listed: BHM ASR – Birmingham, AL (33.57378°, -86.75671°); CXY LOM – New Cumberland, PA (40.178196°, -77.005692°); and IADN NASEB – Chantilly, VA (38.958736°, -77.43499°)
SITE ACTIVITIES:
The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facilities above based on prior research, known historic operations and practices, and required cleanup actions or previously identified sites.
II) TASKS TO BE PERFORMED
The Contractor shall conduct all work in accordance with Federal, State and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement.
a) Remediation and Restoration Work Plan
The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below.
This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment and/or Site Investigation and Site Survey reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2.
The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for all sites including the identification of all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. The government will perform ALL confirmatory sampling required at the sites. Additionally, the work plan shall also identify any required permits needed to perform the work.
Additional components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks.
b) Technical Approach
- Method and procedures for soil remediation, removal, disposal (all as required above in section 1.1), and restoration, - Identification of required work permits
- Site Safety Health Plan (SSHP)
- Risk Management Plan
- Identification of major risks
- Risk mitigation plan
The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments.
c) Contaminated Soil Remediation
Preliminary Assessment/Site Investigation (PA/SI), Site Investigation (SI) and Site Survey activities completed in 2024 found the below sites showing contamination above either FAA action levels or EPA/State regulatory limits. Examples include lead-in-soil concentrations above the FAA’s cleanup standard of 200 mg/kg (ppm) or the applicable state standard, or TPHs in soil above EPA or State regulatory limits.
See SOW for additional details.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Remediation and Restoration Activities | Immediate Office of the Secretary of Transportation | Total Small Business | |
| Cleaning, Inspection, and Hazardous Waste Removal for Two 10,000-Gallon Oil/Water Separators | Secretary of the Air Force | Total Small Business | |
| Nelson Drive Fuel Tank Removal | Forest Service | Total Small Business | |
| Fiscal Year (FY) 2027 Florida Panhandle Optimized Remediation Contract (ORC) and Military Munitions Response Program (MMRP) | ENDIST Mobile | Total Small Business | |
| Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades | Franchise Acquisition Servies | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity