About this opportunity
The Department of the Air Force Sustainment Center at Tinker Air Force Base is procuring the remanufacture of F-16 Sieve Bed Sets through a two-year firm fixed-price requirements contract. The contractor will be required to completely disassemble, clean, inspect, maintain, reassemble, test, and finish the sieve bed sets to restore them to like-new condition, including 100% replacement of all soft goods and molecular sieve material. Qualification requirements apply, and interested vendors that have not been previously qualified must submit a Source Approval Request package to the Tinker AFB Small Business Office. A Pre-Award Survey and Initial Production Evaluation are required as part of the evaluation process. The solicitation was issued on September 9, 2025, with proposals due by 1:00 PM on October 9, 2025.
This procurement does not utilize any set-aside designations and the government anticipates making a sole source award to Cobham Mission Systems Davenport (CAGE: 99251). The contract covers 225 Sieve Bed Sets with National Stock Number 1660-01-643-5164 and manufacturer part number 1601470-1, requiring delivery of 4 units per delivery during each ordering period. Government Furnished Property valued at $2,600 per unit will be provided for the remanufacturing process. The contract spans two ordering periods from November 2025 to November 2027, with performance taking place in Oklahoma. The contractor must comply with extensive reporting requirements including monthly production reports, government property inventory reports, and commercial asset visibility reporting, while adhering to ISO 9001-2015 standards and Buy American Act requirements.
Notice text
REMANUFACTURE
A 2-YEAR FIRM FIXED PRICE REQUIREMENTS TYPE CONTRACT IS CONTEMPLATED.
NOTE: THE GOVERNMENT ANTICIPATES A SOLE SOURCE AWARD TO Cobham Mission Systems Davenport (CAGE: 99251).
52.232-18 Availability of Funds. As prescribed in 32.706-1(a), insert the following clause: Availability of Funds (Apr 1984)
Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer. (End of clause)
(a) A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required. Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively.
(b) The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanufacture required to restore the end item to a like-new condition. The contractor shall also accomplish ALL necessary packing and preservation and packaging. ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price. The government shall only pay the contractor for missing components after review and approval of O&A request. No additional cost will be allowed (i.e. material handling, profit, direct or indirect costs).
(c) Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Tinker AFB Small Business Office. For questions regarding the Tinker SAR Process or related issues, these inquiries should be submitted to the TAFB Small Business Office at: AFSC/SB, 3001 Staff Drive, Suite 1AG 85A, Tinker AFB, OK 73145-3009. Email: afsc.sb.workflow@us.af.mil Website: https://www.afsc.af.mil/units/sbo/index.asp. The actual SAR package submission itself shall be submitted electronically through DoD SAFE at https://safe.apps.mil/. DoD SAFE is a safe and secure option for large file submissions. If you have a PKI Certificate, the SAR can be sent directly to the email address below via DoD SAFE. If you do not have a PKI Certificate, then you must send a standard email message to the email address below and ask that they “Request a Drop-Off” to your email via DoD SAFE, which will enable you to be able to upload the SAR Submission Package documents to DoD SAFE.
429SCMS.SASPO.Workflow@us.af.mil
For more information on the Strategic Alternate Sourcing Program, please visit: https://www.tinker.af.mil/Home/429SCMS-SASPO/
As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification.
(d) In order to receive any technical data related to this acquisition, offerors must send an email request to dessie.breslin@us.af.mil AND amy.gil@us.af.mil. Release of any data is subject to applicable data rights. The request shall include the applicable solicitation number, the specific data needed (including TO(s)), and a copy of the current, approved DD Form 2345. The form, including instructions for completing the form, is available at: http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html. The Government is not responsible for incomplete, misdirected, or untimely requests.**
In order to receive drawings contractors will need to request all needed drawings through the JEDMICS website: https://af-jedmics.navair.navy.mil/webjedmics/index.jsp. Contractors who need an account will need to complete the instructions at the above link.
(e) GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c))
Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.
(f) END ITEMS BEYOND REMANUFACTURE
"Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable requirements. Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the overhaul limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).
(g) If the contractor estimates that any item is not reparable (i.e. beyond overhaul), the Contractor shall promptly notify the administrative contracting officer in writing and shall not perform further overhaul on any such items except
at the direction of the administrative contracting officer (ACO). Upon written confirmation from the ACO that a particular item is not reparable, the contractor shall dispose of the unit in the manner directed by the ACO.
Contractors are cautioned that until a contract is executed, any effort performed in support of the anticipated effort is performed strictly at their own risk and expense. There is no authorization to begin performance until the contractor has received a duly authorized contract signed by the Contracting Officer. Also, this request for proposal is not to be construed to mean that the award of a contract is assured, as the availability of funds, timely submission of all requested documents, and acceptance by both parties are prerequisite to any contract award.
(h) Condemned units shall not be counted as production.
(i) In the event there are component part(s) with long lead times, the awardee is responsible for securing necessary parts to meet the Government’s required delivery schedule.
(j) In the event that DFARS clause 252.217-7001, Surge Option, is invoked, quantities and prices will be negotiated at that time. The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are necessary.
(k) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003. Contractor determined location and method of marking is acceptable.
(l) Dates listed in clauses 52.216-19 and 52.216‐21 are based on the estimated award date. These dates will be revised prior to award based on the actual award date.
(m) Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the remanufacture limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).
(n) In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the contractor must include a DD1348-1when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1 but will ensure DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned asset, DCMA will not sign the DD250.
(o) In accordance with DAFFARS 5309.105-1 the Supplier Performance Risk System (SPRS) is checked for supplier risk assessments when determining responsibility. DFARS 252.204.7303(b) states that the contracting officer shall verify that the summary level score of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old, unless a lesser time is specified in the solicitation) for each covered contractor information system that is relevant to an offer, contract, task order, or delivery order are posted in Supplier Performance Risk System (SPRS). Offerors are required to represent they will implement National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 SP 800-171 (reference the provision DFARS 252.204-7008). A score of 110 must be in SPRS, if assessment score is less than 110, contractors must submit a copy of their plan with their proposal.
Files
| File | Type | Posted |
|---|---|---|
| SOW.pdf | ||
| CAV_AF_Reporting_Requirements.pdf | ||
| Production_Surge_Plan.pdf | ||
| Packaging Requirements.pdf | ||
| FA811825R0100.pdf | ||
| CDM_Monthly_Production_Report.pdf | ||
| Transportation Data.pdf | ||
| Government_Property_Inventory_Report.pdf | ||
| CAVAF.pdf | ||
| Report_of_Shipping_and_Packaging_Discrepancy.pdf | ||
| Special Packaging Instructions.pdf | ||
| GFP.pdf | ||
| CDRL.pdf |
Show all 13
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| F-16 Air Bearing Turbing Scroll Housing | Air Force Sustainment Center | No set-aside | |
| F110 Motional Transducer Remanufacture | Air Force Sustainment Center | No set-aside | |
| NSN 4810007616225RK/47680 | Air Force Sustainment Center | Total Small Business | |
| SOLICITATION FA811826R0055- Repair of the F-16 Oxygen Monitor NSN 1660-01-473-3548 | Air Force Sustainment Center | No set-aside | |
| FA811826R0055- Repair of the F-16 Oxygen Monitor NSN 1660-01-473-3548 | Air Force Sustainment Center | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity