Production_Surge_Plan.pdf
PDF 157 KB Posted
- Attached to
- Remanufacture of the F-16 Sieve Bed Set
- Solicitation number
- FA8118-25-R-0100
About this file
This document is a Data Item Description (DID) for a Production Surge Plan, identified by the number DI-MGMT-80969. The document outlines a framework for contractors to demonstrate their capability to rapidly accelerate and sustain production utilizing existing facilities and equipment during a peace-time acquisition environment, without a declaration of war or mobilization.
The Production Surge Plan requires contractors to detail several key components: the maximum sustainable production rate, building schedules to achieve that rate, comprehensive lists of subcontracted and non-subcontracted items/components, lists of government contracts being performed at the contractor's facility, potential impact on production of surging this contract, additional labor requirements, strategic or critical materials needed, and production equipment details. The plan must identify contract numbers, items, Defense Materials System priorities, and provide specifics on how the contractor can increase production rate, reduce leadtime by at least 10 percent, and improve surge protection capability. The document is marked for public release with unlimited distribution and supersedes a previous version (DI-P-1634A).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Special Packaging Instructions.pdf | ||
| GFP.pdf | ||
| CDRL.pdf | ||
| FA811825R0100.pdf | ||
| CDM_Monthly_Production_Report.pdf | ||
| Transportation Data.pdf | ||
| Government_Property_Inventory_Report.pdf | ||
| CAVAF.pdf | ||
| Report_of_Shipping_and_Packaging_Discrepancy.pdf | ||
| SOW.pdf | ||
| CAV_AF_Reporting_Requirements.pdf | ||
| Packaging Requirements.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .