Relocation services at the Los Angeles Air Route Traffic Control Center (ARTCC) - Palmdale, CA.

Closed Pre-Solicitation Posted

Solicitation number
24569
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
484210 Used Household and Office Goods Moving
PSC
Not on record
More information

Notice details come from SAM.gov. Updated .

Notice text

NOTE: If viewing this announcement from a source other than the FAA Contract Opportunities website, please visit http://faaco.faa.gov for the original announcement. Updates and or amendments will only be issued through the FAA Contracting Opportunities Website.



The acquisition strategy for this procurement has not been determined at this time; however, either an unrestricted competition or set-aside will be chosen depending on the responses to this market survey.



Anticipated Dollar Range: Between $50,000 and $100,000



Introduction/Description:



The responses to this market survey will be used for information purposes only. This is not a screening information request for proposals of any kind. The FAA is not seeking or accepting unsolicited proposals. The FAA will not pay for any information received or costs incurred associated in preparation or in response to this market survey.



An abbreviated scope of work is provided below. The work includes, but is not limited to the following:





ARTCC Buildings -. These specifications, together with the referenced specifications, standards, design data, and drawings specified in the contract documents, cover the requirements for all work associated with the transition work required to prepare the areas of the M-1 Rooms for major renovation under a separate contract. All areas of the M-1 spaces must be vacated for actual construction work to occur. This project moves all of the people in the M-1 area along with furniture, accessories, etc. to other areas of the ARTCC and puts all items that cannot be moved into the two (2) storage trailers for this project which are the FAST and IT Trailers. Infrastructure is included in the areas where personnel will be relocated under this contract.



This project will, specifically, move all personnel, furniture, accessories, etc. occupying the current M-1 Areas into several different rooms and spaces as shown by the project drawings. All items not moved into the identified spaces shall be moved for storage into the FAST and IT Trailers. Contractor shall provide necessary infrastructure in the relocated spaces such that personnel will have sufficient power, LAN, and telco. Contractor shall disassemble and reassemble various furniture components such that all new layouts are met. Work includes:



1. Relocating all personnel in the M-1 areas to new locations as identified by the project drawings and specs. Contractor shall not move any furniture or accessories to its new location by rolling over the stairway threads. All items shall be carried or transported by the facility elevators.



2. Disassemble and reassemble various furniture components as required such that the drawing layouts are satisfied as far as functions which includes adequate power, LAN, and telco



3. Contractor shall install new power circuits to make up for power for the AW2 Columbia Room – 243A. Contractor shall ensure that all NEC codes are met and establish power connection for each of the cubicles in Room 243A. Contractor shall connect each cubicle to each existing LAN lines and use the LAN switch which the FAA will install to make up for the 3 LAN line shortage. Contractor can wire the power and LAN to each cubicle connection which has a receptacle for power and LAN. Contractor shall provide to the FAA a detailed plan for running the power and LAN from its power source to its final location.



4. Contractor shall move all items in the existing FAST and IT trailer such that all areas can accommodate new furniture and accessories from the M-1 and other associated Room areas.



5. Contractor shall provide the FAA with 2 new 15 foot long by 6 ft. high accordion partitions on rollers that are self-standing and can be moved out of the way quickly for necessary FAA meetings and briefing.



6. Contractor shall ensure that each employee that is relocation has all of their functional requirements met. Any deviation from an employee’s function requirement shall be corrected immediately.



All work must be coordinated in order to maintain an operational facility. The total contract duration for completion of all work shall be 45 calendar days, excluding the following FAA Holiday Moratorium.



In order to make this determination and be considered responsive, interested offerors must complete and submit the attached Business Declaration Form to elsa.gonzalez@faa.gov by 4:30 PM local time on Friday, June 17, 2016.



“This notice is for informational purposes for Minority, Women Owned and Disadvantaged Business Enterprises: The Department of Transportation (DOT), Office of Small and Disadvantaged Business Utilization, has a program to assist small businesses, small businesses owned and controlled by a socially and economically disadvantaged individuals and women owned concerns to acquire short-term working capital assistance for transportation-related contracts. Loans are available under the DOT Short Term Lending Program (STLP) at the prime interest rate to provide accounts receivable financing. The maximum line of credit is $750,000.00. For further information and applicable forms concerning the STLP, call the OSDBU at (800) 532-1169â€



If you're viewing this announcement from a source other than Federal Aviation Administration Contract Opportunities (FAACO), visit https://faaco.faa.gov/index.cfm/announcement/view/24569 to view the original announcement.

Files

File Type Posted
Business Declaration.doc DOC document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors