Amendment 0002 - Region 4, GSA PBS, Design-Build Concrete and Crack Water Fountain Repairs, Fort Lauderdale, FL

Closed Solicitation Posted

Solicitation number
47PE0720R0069
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Fort Lauderdale FL 33301 USA

Notice details come from SAM.gov. Updated .

About this opportunity

The General Services Administration's Southeast Sunbelt Region 4 is soliciting proposals under solicitation number 47PE0720R0069 to provide design-build construction services for the repair of cracks, spalls and deteriorated concrete at structural columns, beams, curbs and a water fountain at the Fort Lauderdale Federal Building and U.S. Courthouse in Fort Lauderdale, Florida. The work includes all design, construction, project management and related services to complete structural concrete repairs. Proposals will be evaluated using lowest price technically acceptable criteria, with experience on similar projects and past performance as non-price factors. The deadline for questions is September 1st and proposals are due by September 16, 2020.

This procurement is set aside solely for total small businesses. The estimated value is between $500,000 to $1,000,000. Repairs are required at concrete columns, beams and slabs in the basement garage and first floor terrace, as well as concrete curbs and steps. The place of performance is the Fort Lauderdale Federal Building and U.S. Courthouse located at Fort Lauderdale, Florida. The period of performance for design services is from award until June 27, 2021, with construction to be completed within 270 calendar days of notice to proceed.

Notice text

3 versions

Update #3 · Latest ·

The purpose of Amendment 0002 to solicitation 47PE0720R0069 is to:

  1. Provide responses to Request for Information (RFI). See attachment titled “Ft. Lauderdale Fountain Repair RFI Responses”.
  2. Access to drawings will be based upon request. Please request access to drawings on beta.SAM. After request is reviewed/verified, access will be granted to the drawings for each requestor. See attached drawings titled “Combined File Structural FB-CT Ft. Lauderdale FL”.
  3. The closing date for proposals remains unchanged.
  4. All other terms and conditions remain unchanged.

////////////////////////////////////////////LAST ITEM////////////////////////////////////////////////////////

The purpose of Amendment 0001 to solicitation 47PE0720R0069 is to:

1.  Provide a Request for Information (RFI) due date: Due Date 9/1/2020 by 3:00 pm (E.S.T.)

Please send (RFIs) via email to reginald.pratt@gsa.gov

2.  Revises Factor 3 management Approach in the sections below:

II.D. Technical Proposal

 (3) Management Approach

The Government will evaluate the offeror’s understanding of the work required on the proposed contract. This factor is concerned with the Offeror’s understanding of the project requirements and the management approach.

Offerors shall provide a written Management Plan and Schedule for the Project. The Management Plan shall explain how the various team members will work together and the methodology and processes for managing this entire Project. Offerors shall describe their approach to managing and delivering a project of the magnitude and complexity of THIS project under budgetary and time constraints. The description shall include a discussion of offeror’s approach to managing the project to meet or exceed performance criteria, on schedule, and within budget. Offerors should include discussions of how the schedule for the project will be met while, at the same time, managing any changes that may occur. Offerors shall also submit a proposed project schedule in Microsoft Project Tracking Gantt chart format.

The page limit for the Management Plan is three (3) pages using twelve (12) point font. Theproject schedule does not count against the page limit.

Acceptable: The offeror’s Management Approach will be evaluated as an indicator of the Offeror's understanding of the project requirements. Management Approach will be evaluated on the basis of the information submitted by the Offeror indicating understanding of the schedule and performance criteria. The Offeror must have a logical, fully coordinated, and concise Management Plan and Schedule.

VI.B. Lowest Price Technically Acceptable Evaluation Process

(c) Factor 3 - Management Approach

Evaluation Criteria: The Government will evaluate the offeror’s understanding of the work required on the proposed contract. This factor is concerned with the Offeror’s understanding of the project requirements and the management approach.

Acceptability Standard: Offerors shall provide a written Management Plan and Schedule for the Project. The Management Plan shall explains how the various team members will work together and the methodology and processes for managing this entire Project. Offerors shall describe their approach to managing and delivering a project of the magnitude and complexity of THIS project under budgetary and time constraints. The description shall include a discussion of offeror’s approach to managing the project to meet or exceed performance criteria, on schedule, and within budget. Offerors should include discussions of how the schedule for the project will be met while, at the same time, managing any changes that may occur. Offerors shall also submit a proposed project schedule in Microsoft Project Tracking Gantt chart format.

The page limit for the Management Plan is three (3) pages using twelve (12) point font. The project schedule does not count against the page limit.

Acceptable: The offeror’s Management Approach will be evaluated as an indicator of the Offeror's understanding of the project requirements. Management Approach will be evaluated on the basis of the information submitted by the Offeror indicating understanding of the schedule and performance criteria. The Offeror must have a logical, fully coordinated, and concise Management Plan and Schedule.

3.  The closing date for proposals remains unchanged. 

4.  All other terms and conditions remain unchanged. 

////////////////////////////////////////////////////////LAST ITEM//////////////////////////////////////////////////////////

The General Sevices Administration (GSA) Sountheast Sunbelt Region 4 announces the opportunity for a Request for Proposal to provide design and build construction services for the Fort Lauderdale Building and U.S. Courthouse, Fort Lauderdale, FL.  The work involves the design-build services for the repair of selected cracks, spalls and deteriorated concrete at several of the existing concrete structual columns, beans, and curbs at theFort Lauderdale Federal Building and U.S. Courthouse, Fort Lauderdale, Florida with all incidental and related work for a complete structural concrete repair ready for the use intended.  

***This procurement is set-aside for Total Small Business*** 

Update #2 ·

The purpose of Amendment 0001 to solicitation 47PE0720R0069 is to:

1.  Provide a Request for Information (RFI) due date: Due Date 9/1/2020 by 3:00 pm (E.S.T.)

Please send (RFIs) via email to reginald.pratt@gsa.gov

2.  Revises Factor 3 management Approach in the sections below:

II.D. Technical Proposal

 (3) Management Approach

The Government will evaluate the offeror’s understanding of the work required on the proposed contract. This factor is concerned with the Offeror’s understanding of the project requirements and the management approach.

Offerors shall provide a written Management Plan and Schedule for the Project. The Management Plan shall explain how the various team members will work together and the methodology and processes for managing this entire Project. Offerors shall describe their approach to managing and delivering a project of the magnitude and complexity of THIS project under budgetary and time constraints. The description shall include a discussion of offeror’s approach to managing the project to meet or exceed performance criteria, on schedule, and within budget. Offerors should include discussions of how the schedule for the project will be met while, at the same time, managing any changes that may occur. Offerors shall also submit a proposed project schedule in Microsoft Project Tracking Gantt chart format.

The page limit for the Management Plan is three (3) pages using twelve (12) point font. Theproject schedule does not count against the page limit.

Acceptable: The offeror’s Management Approach will be evaluated as an indicator of the Offeror's understanding of the project requirements. Management Approach will be evaluated on the basis of the information submitted by the Offeror indicating understanding of the schedule and performance criteria. The Offeror must have a logical, fully coordinated, and concise Management Plan and Schedule.

VI.B. Lowest Price Technically Acceptable Evaluation Process

(c) Factor 3 - Management Approach

Evaluation Criteria: The Government will evaluate the offeror’s understanding of the work required on the proposed contract. This factor is concerned with the Offeror’s understanding of the project requirements and the management approach.

Acceptability Standard: Offerors shall provide a written Management Plan and Schedule for the Project. The Management Plan shall explains how the various team members will work together and the methodology and processes for managing this entire Project. Offerors shall describe their approach to managing and delivering a project of the magnitude and complexity of THIS project under budgetary and time constraints. The description shall include a discussion of offeror’s approach to managing the project to meet or exceed performance criteria, on schedule, and within budget. Offerors should include discussions of how the schedule for the project will be met while, at the same time, managing any changes that may occur. Offerors shall also submit a proposed project schedule in Microsoft Project Tracking Gantt chart format.

The page limit for the Management Plan is three (3) pages using twelve (12) point font. The project schedule does not count against the page limit.

Acceptable: The offeror’s Management Approach will be evaluated as an indicator of the Offeror's understanding of the project requirements. Management Approach will be evaluated on the basis of the information submitted by the Offeror indicating understanding of the schedule and performance criteria. The Offeror must have a logical, fully coordinated, and concise Management Plan and Schedule.

3.  The closing date for proposals remains unchanged. 

4.  All other terms and conditions remain unchanged. 

////////////////////////////////////////////////////////LAST ITEM//////////////////////////////////////////////////////////

The General Sevices Administration (GSA) Sountheast Sunbelt Region 4 announces the opportunity for a Request for Proposal to provide design and build construction services for the Fort Lauderdale Building and U.S. Courthouse, Fort Lauderdale, FL.  The work involves the design-build services for the repair of selected cracks, spalls and deteriorated concrete at several of the existing concrete structual columns, beans, and curbs at theFort Lauderdale Federal Building and U.S. Courthouse, Fort Lauderdale, Florida with all incidental and related work for a complete structural concrete repair ready for the use intended.  

***This procurement is set-aside for Total Small Business*** 

Update #1 ·

The General Sevices Administration (GSA) Sountheast Sunbelt Region 4 announces the opportunity for a Request for Proposal to provide design and build construction services for the Fort Lauderdale Building and U.S. Courthouse, Fort Lauderdale, FL.  The work involves the design-build services for the repair of selected cracks, spalls and deteriorated concrete at several of the existing concrete structual columns, beans, and curbs at theFort Lauderdale Federal Building and U.S. Courthouse, Fort Lauderdale, Florida with all incidental and related work for a complete structural concrete repair ready for the use intended.  

***This procurement is set-aside for Total Small Business*** 

Files

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Update - Region 4, GSA PBS, Design-Build Concrete and Crack Water Fountain Repairs, Fort Lauderdale, FL Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors