Redwood City Dredging Project

Awarded Award Notice Posted

Solicitation number
W912P7-08-B-0005
Agency
ENDIST San Francisco US Army Corps of Engineers, Department of Defense
Awarded
to D D-M Leasing Company, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
W912P708C0012 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Port Of Redwood City Harbor Channel San Francisco, California 94103, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: Jul 18, 2008 11:41 pm Modified: Sep 03, 2008 12:22 pmTrack Changes

The RFP will be available on or about the first of August: PORT OF REDWOOD CITY HARBOR CHANNEL OPEATION AND MAINTEANCE DREDGING PROJECT DESCRIPTION: The work consists of operation and maintenance dredging of Port of Redwood City Harbor Channel, transportation and placement of the dredged material at Inner Bair Island and management and discharge of the process water on to the Middle Bair Island. All dredging, material transportation and placement including the return flow discharges shall be in accordance with project plans, specifications, permit, regulatory guidance and applicable contract clauses. The contract award will be either Alternate (1), (2), or (3) shown on the Bid Schedule based on the availability of the project funds, the best interest of the Government, and to bid with conforming to the invitation and is the lowest total amount. Estimated Cost Range of Project: $1,000,000 - $5,000,000 Contract Performance period: 125 Calendar Days.

Update #1 ·

Added: Jul 18, 2008 11:41 pm The RFP will be available on or about the first of August:



PORT OF REDWOOD CITY HARBOR CHANNEL OPEATION AND MAINTEANCE DREDGING



PROJECT DESCRIPTION:



The work consists of operation and maintenance dredging of Port of Redwood City Harbor Channel, transportation and placement of the dredged material at Inner Bair Island and management and discharge of the process water on to the Middle Bair Island. All dredging, material transportation and placement including the return flow discharges shall be in accordance with project plans, specifications, permit, regulatory guidance and applicable contract clauses. The contract award will be either Alternate (1), (2), or (3) shown on the Bid Schedule based on the availability of the project funds, the best interest of the Government, and to bid with conforming to the invitation and is the lowest total amount.





Estimated Cost Range of Project: $1,000,000 - $5,000,000



Contract Performance period: 125 Calendar Days.

Attachments

Files attached to this notice, newest first
File Type Posted
Bid Abstract for RWC Dredge.xls XLS spreadsheet
Questions Responses 9-3-2008.doc DOC document
Redwood_2of6.cal —
Readme_Redwood.txt TXT text file
Redwood_4of6.cal —
Redwood_1of6.cal —
Redwood_6of6.cal —
Redwood_3of6.cal —
Redwood_5of6.cal —
Redwood_City_FY08_05Aug08.pdf PDF