Questions Responses 9-3-2008.doc
DOC document 179 KB Posted
- Attached to
- Redwood City Dredging Project Federal contract opportunity
- Solicitation number
- W912P7-08-B-0005
About this file
Questions and answers as of 3 September 2008
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract for RWC Dredge.xls | XLS spreadsheet | |
| Redwood_2of6.cal | — | |
| Readme_Redwood.txt | TXT text file | |
| Redwood_4of6.cal | — | |
| Redwood_3of6.cal | — | |
| Redwood_5of6.cal | — | |
| Redwood_City_FY08_05Aug08.pdf | ||
| Redwood_1of6.cal | — | |
| Redwood_6of6.cal | — |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Redwood City Harbor, CA (O&M)
CALIFORNIA
AS OF: 2 September 2008 Page 1 of 5
QUESTIONS & RESPONSES
SOLICITATION NUMBER W912P7-08-B-0005
The intent of this section is to provide questions & comments received from interested parties on the above solicitation, and our responses to those questions and comments. It is possible that the information below does not reflect 100% of the questions and responses. The questions and comments do not necessarily represent questions received from any particular contractor.
Questions and responses are provided for information only and are not made part of the solicitation. Only a formal amendment (SF30) to the solicitation changes the solicitation.
Changes to any previous responses in this document will be struck-through and new, updated responses will be provided as appropriate.
No.
RFP Section
Question
Response
| 1 |
| Section 35 20 23, Paragraph 5.8 |
| Regarding Section 35 20 23, Paragraph 5.8 Overflow, Spillage, and Leakage. If the contractor elects to use a Hopper Dredge, will they be allowed to overflow for an amount of time specified by the contracting officer in order to optimize production? |
5.8 Overflow, Spillage and Leakage
5.8.1 Misplaced Material. Any dredged material that escapes, sloughs, or is lost at any time while dredging, loading, transporting, or which is deposited in an area other than that designated on the Plans shall be redredged or retrieved, and material shall be deposited where directed by the Contracting Officer, at the Contractor's expense.
5.8.2 The Contractor’s Spill Response Plan shall include monitoring of overflow, spillage and leakage.
5.8.3 The Contractor shall remove all material spilled outside the project limits at no cost to the Government.
Both the Consistency Determination (CD) and the Waste Discharge Requirements (WDR) allow 15 minutes of overflow for hopper dredge operations. The allowance is action specific and not project specific, meaning that it would apply on any project where a hopper dredge is used. The documents do not specify which projects may or may not use a hopper dredge. Both documents are worded such that the overflow is per excavation cut. We have clarified this with the agencies and their intention and interpretation is that after 15 minutes of overflow the dredge will transit to the disposal/placement site and unload.