Recreation Site Water Deferred Maintenance, San Juan National Forest
Award Notice Posted
- Solicitation number
- AG-82B1-S-10-0236
- Agency
-
Operations Center Intermountain
Economic Recovery Operations, Department of Agriculture
- Awarded
- to Valley Coast Construction, Inc.
- Set-aside
- HUBZone
Opportunity facts
- Contract number
- AG-82B1-C-10-0348 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- San Juan National Forest Columbine Dolores, Pagosa Ranger District 15 Burnett Court Durango, Colorado 81301, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
THE BID RESPONSE DATE IS HEREBY AMENDED IN ACCORDANCE WITH AMENDMENT 00001 DATED 4/29/2010. PLEASE RETURN SIGNED TO CONFIRM RECEIPT WITH BID PORPOSAL PACKAGE.
Update #2 ·
Description
THIS IS AN AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) PROCUREMENT. The resulting contract will utilize funds provided by the AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) OF 2009. Interested parties are notified that the inclusion of unique provisions required in implementing the Act, including those for significant reporting and transparency, will be required of the successful bid.
The purpose of this announcement is to make notice that the Forest Service contemplates releasing a Invitation for Bid numbered AG-82B1-S-10-0236 on or about March 30, 2010, for the RECOVERY Recreation Site Water Deferred Maintenance, San Juan National Forest. If the Invitation For Bid is released, it will be released through this FedBizOpps website, and prospective vendors should visit this FedBizOpps website from time to time on or after March 30, 2010 to obtain a copy of the Invitation for Bid. This requirement is being solicited as an Invitation for Bid (IFB) under FAR Part 14. Bids are due at May 31, 2010; 10:00 A.M. Mountain Time. A single firm-fixed price type contract will be awarded to the responsible Bidder (IAW FAR Part 9, Contractor Qualifications) whose bid is of the lowest price.
PROJECT DESCRIPTION. Repair and maintenance of recreation facility water and wastewater systems located across the San Juan National Forest. Repair and maintenance work shall include drinking water systems (water supply, treatment, distribution systems and associated buildings) and sanitary wastewater systems (wastewater collection and disposal, disposal and storage systems , system structures, and toilet buildings). Work items may include plumbing, electrical, carpentry, roofing, masonry, locksmith, painting, sign installation, concrete, mechanical, excavation, aggregate supply and placement, fencing, water well maintenance, water well abandonment.
The magnitude of this project IAW FAR 36.204 (c) is between $250,000 and $500,000. There will not be a pre-bid meeting for this requirement. The recommended contract length is 720 days. Projected start date is May 15, 2010. Performance and Payments will be required per the miller Act and Davis-Bacon wage rates will apply.
PROJECT LOCATION. This project shall incorporate developed recreation sites within the San Juan National Forest. The project area is located in southwestern Colorado on San Juan National Forest developed recreation sites located in the vicinity of the following towns: Bayfield, Dolores, Mancos, Cortez, Pagosa Springs, Rico, Mancos, Dove Creek, Silverton and Durango.
All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. Vendors are required to be registered in the Central Contractor Registration (CCR) http:www.ccr.gov or call 888-227-2423 or 269-961-5757 and shall complete the On-Line Registration and Certifications Application (ORCA) http://orca.bpn.gov. All responsible sources may submit a response to this announcement which will be considered by this agency.
ALL BIDS SHOULD BE ADDRESSED AND SENT TO:
USDA
ATTN: PHYLLIS R. COBURN-HARRIEL
740 SIMMS ST
GOLDEN, CO 80401
FAXED BIDS WILL NOT BE ACCEPTED
Update #1 ·
Description
THIS IS AN AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) PROCUREMENT. The resulting contract will utilize funds provided by the AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) OF 2009. Interested parties are notified that the inclusion of unique provisions required in implementing the Act, including those for significant reporting and transparency, will be required of the successful bid.
The purpose of this announcement is to make notice that the Forest Service contemplates releasing a Invitation for Bid numbered AG-82B1-S-10-0236 on or about March 30, 2010, for the RECOVERY Recreation Site Water Deferred Maintenance, San Juan National Forest. If the Invitation For Bid is released, it will be released through this FedBizOpps website, and prospective vendors should visit this FedBizOpps website from time to time on or after March 30, 2010 to obtain a copy of the Invitation for Bid. This requirement is being solicited as an Invitation for Bid (IFB) under FAR Part 14. Bids are due at April 29, 2010; 1:00 p.m. Mountain Time. A single firm-fixed price type contract will be awarded to the responsible Bidder (IAW FAR Part 9, Contractor Qualifications) whose bid is of the lowest price.
PROJECT DESCRIPTION. Repair and maintenance of recreation facility water and wastewater systems located across the San Juan National Forest. Repair and maintenance work shall include drinking water systems (water supply, treatment, distribution systems and associated buildings) and sanitary wastewater systems (wastewater collection and disposal, disposal and storage systems , system structures, and toilet buildings). Work items may include plumbing, electrical, carpentry, roofing, masonry, locksmith, painting, sign installation, concrete, mechanical, excavation, aggregate supply and placement, fencing, water well maintenance, water well abandonment.
The magnitude of this project IAW FAR 36.204 (c) is between $250,000 and $500,000. There will not be a pre-bid meeting for this requirement. The recommended contract length is 720 days. Projected start date is May 15, 2010. Performance and Payments will be required per the miller Act and Davis-Bacon wage rates will apply.
PROJECT LOCATION. This project shall incorporate developed recreation sites within the San Juan National Forest. The project area is located in southwestern Colorado on San Juan National Forest developed recreation sites located in the vicinity of the following towns: Bayfield, Dolores, Mancos, Cortez, Pagosa Springs, Rico, Mancos, Dove Creek, Silverton and Durango.
All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. Vendors are required to be registered in the Central Contractor Registration (CCR) http:www.ccr.gov or call 888-227-2423 or 269-961-5757 and shall complete the On-Line Registration and Certifications Application (ORCA) http://orca.bpn.gov. All responsible sources may submit a response to this announcement which will be considered by this agency.
Files
| File | Type | Posted |
|---|---|---|
| Amendment 000001 A.pdf | ||
| SF 30AG82B1S100236000001.pdf | ||
| CO13_Wage Determination_03122010.pdf | ||
| SF 1442AG82B1S10236.pdf | ||
| Exp. Qstnr.doc.docm | DOCM document | |
| Drawings Plans.pdf | ||
| AG-82B1-S-10-0236.pdf | ||
| Rec_specs.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity