San Juan National Forest Recreation Site Water and Wastewater Deferred Maintenance 2010 1 CSI Specifications

CSI Specifications

Recreation Site Water and Wastewater Deferred Maintenance

No. of Pages

DIVISION 1 – GENERAL REQUIREMENTS

Section 01110 - Summary of Work Section 01141 - Use of Site and Public Closures Section 01180 - Project Utility Sources Section 01291 - Measurement and Payment Section 01330 - Submittal Procedures Section 01450 - Quality Control Section 01641 - Government Furnished Products Section 01660 - Product Storage and Handling Requirements Section 01721 - Construction Surveying and Staking Section 01732 - Mobilization Section 01740 - Cleaning Section 01780 - Closeout Submittals

DIVISION 2 – SITE CONSTRUCTION

Section 02081 - Galvanized Steel Piping Section 02082 - Valves and Boxes Section 02083 - Water Hydrants Section 02084 - High Density Polyethylene Piping Section 02086 - Brass Piping / Nipples Section 02220 - Site Demolition Section 02230 - Site Clearing Section 02300 - Earthwork Section 02315 Excavation and Fill Section 02316 - Trenching, Backfilling, and Compacting Section 02317 - Excavating and Backfilling for Structures Section 02510 - Water Distribution Section 02512 - Water Tower Section 02520 - Well Abandonment Section 02522 - Water Well Pump Installation Section 02523 - Handpumps Section 02730 - Aggregate Surfacing Section 02731 - Septic Tanks Section 02921 - Seeding

DIVISION 3 – CONCRETE

Section 03301 - Concrete, Formwork and Reinforcement Section 03302 - Concrete from Packaged Dry Mix

2010 2 CSI Specifications

No. of Pages

DIVISION 6 – WOOD AND PLASTICS

Section 06091 - Treatment Building

DIVISION 7 – THERMAL AND MOISTURE PROTECTION

Section 07920 - Joint Sealants

DIVISION 11 – EQUIPMENT

Section 11260 - Disinfectant Feed Equipment

DIVISION 13 – SPECIAL CONSTRUCTION

Section 13121 - Prefabricated Concrete Treatment Building Section 13200 - Storage Tanks Section 13441 - Liquid Level Sensors

DIVISION 15 – MECHANICAL

Section 15141 - Building Plumbing

DIVISION 16 – ELECTRICAL

Section 16050 - Basic Electrical Materials and Methods Section 16201 - Wiring Systems Section 16800 - Photovoltaic Power System

2010 01110 - 1 Summary of Work

SECTION 01110

SUMMARY OF WORK

PART 1 GENERAL

1.01 INTENT OF CONTRACT

A. The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, furnish all labor, materials, equipment, tools, transportation, and supplies, and perform all work required to complete the project in reasonably close conformity with drawings and specifications, and in accordance with provisions of the contract.

B. Sections of Division 1 – General Requirements govern the execution of the work of all sections of the specifications.

1.02 DRAWINGS

A. Contract drawings accompany these specifications and form a part of this contract.

1.03 LOCATION OF WORK

A. This project shall incorporate developed recreation sites within the SJNF. The project area is located in southwestern Colorado on SJNF developed recreation sites located in the vicinity of the following towns: Bayfield, Dolores, Mancos, Cortez, Pagosa Springs, Rico, Mancos, Dove Creek, Silverton and Durango.

1.04 DESCRIPTION OF THE WORK

A. Repair and maintenance of recreation facility water and wastewater systems located across the San Juan National Forest. Repair and maintenance work shall include drinking water systems (water supply, treatment, distribution systems and associated buildings) and sanitary wastewater systems (wastewater collection and disposal, disposal and storage systems, system structures, and toilet buildings). Work items may include plumbing, electrical, carpentry, roofing, masonry, locksmith, painting, sign installation, concrete, mechanical, excavation, aggregate supply and placement, fencing, water well maintenance, water well abandonment.

Work items will include, but are not limited to the following:

1. Abandon water wells in accordance with State of Colorado regulations.

2. Replacement of the potable water systems at Teal Campground and Ute Campground and replacement of the potable water distribution system at Florida Campground.

2010 01110 - 2 Summary of Work

3. Repair existing handpumps including gasket replacement, installing a watertight seal between the casing and concrete pad, painting, replacement of worn or broken parts, replacing worn leathers, securing to well casing and closing rodent holes.

4. Installation of point of use hydrants including concrete pad, hydrant post, valves, drains, and finish grading (AS SHOWN IN THE DRAWINGS).

5. Supply and installation of “No Washing or Bathing” signing on hydrant posts.

6. Replace unprotected (non-atmospheric vacuum breaker) hose bibs with hose bibs that have integrated vacuum breakers.

7. Demolition of existing water hydrants.

8. Demolition in-place of abandoned septic tanks and concrete vaults.

9. Earthwork and site grading to address drainage and accessibility issues.

10. Replace an existing RV dump station water tower.

11. Installation of a Government supplied precast concrete treatment building at Teal Campground. Installation shall include site pad preparation, installation of sweeps through the building floor, building placement, construction of a concrete apron, and final grading of treatment building site. Provide building wiring and plumbing

12. Installation of all treatment building plumbing and controls for Teal Campground.

13. Retrofit and protect one well head at Teal Campground for exterior operations meeting sanitary standards and to include installation of all necessary appurtenances and piping from well to treatment building.

14. Design and installation of photovoltaic powered pumping system at Teal Campground including but not limited to: stainless steel well pump, solar panels to be mounted on the roof of the prefabricated concrete treatment building, wiring and controls.

15. Trench and Install 1” high density polyethylene pipe for distribution and supply lines, and daylight drains (AS SHOWN IN THE DRAWINGS).

Upgrade and repair daylight drains by providing proper screening, air-gap and erosion protection.

16. Replace damaged or leaking water system valves.

17. Sanitary waste pumping of holding tanks and disposal.

18. Seeding of all areas disturbed by construction with seed mixture specified by the Ranger District.

19. Replacement of an existing below-ground vault water treatment system at Ute Campground with a treatment system located in a wood-constructed shed mounted on a concrete slab.

20. Provide building wiring, water storage tank, pressure tanks, supply pump and chlorination system and two points of distribution at Ute Campground.

21. Supply of aggregate.

2010 01110 - 3 Summary of Work

22. Repair of a water storage tank manway that is secured and is lockable.

1.05 GENERAL SITE CONDITIONS

A. Rock outcrops, surface cobbles, and boulders are evident at many sites.

B. Thick oak brush, Aspen trees, clay soils are evident at many sites.

PART 2 PRODUCTS

2.01 GOVERNMENT FURNISHED MATERIALS

A. Section 01641 – Government Furnished Products

PART 3 EXECUTION

Not Used

END OF SECTION

2010 01141 - 1 Use of Site and Public Closures

SECTION 01141

USE OF SITE AND PUBLIC CLOSURES

1.01 USE OF SITE BY PUBLIC

A. Construction shall be conducted to allow public at all times. When necessary, segments of recreation sites may be closed, with the approval of the CO, for limited period.

B. There shall not be access to potable water.

1.02 USE OF SITE BY CONTRACTOR

A. Storage Area: An area within the site shall be made available for use as a storage area. The CO shall approve the location of the area prior to its use.

Toilet buildings shall not be used for storage.

B. Work Camp: An area at the site shall be approved by the CO as a work camp for the Contractor’s personnel at no cost to the contractor. The contractor and all personnel shall comply with Forest Service regulations relative to such use.

C. Sanitary Facilities:

1. The contractor shall have use of public toilet facilities as located the site.

The toilet building shall be cleaned periodically, and when work is stopped or delayed for an extended period of time as directed by the CO. Prior to final acceptance of the project, the toilet building shall be cleaned and the vault(s) pumped as directed by the CO. Toilet buildings shall not be used for storage, OR

2. The contractor shall provide portable toilet. Forest Service Toilet buildings shall not be used for storage.

PART 2 PRODUCTS

Not Used

2010 01180 - 1 Project Utility Sources

SECTION 01180

PROJECT UTILITY SOURCES

1.01 ELECTRIC

A. Electricity is not available on-site. Contractor shall be responsible for supplying electricity required for contract work.

1.02 POTABLE WATER

A. Contractor shall be responsible for supplying potable water as needed.

1.03 NON-POTABLE WATER

A. Non-potable water is not available on-site.

1.04 SANITARY FACILITIES

A. Section 01141 – Use of Site and Public Closures.

1.05 WASTE DISPOSAL

A. Contractor shall be responsible for disposal of all wastes. See Section 02220 –

Site Demolition, and Section 01740 – Cleaning.

2010 01291 - 1 Measurement and Payment

SECTION 01291

MEASUREMENT AND PAYMENT

1.01 MEASUREMENT AND PAYMENT

A. Compensation provided for in the contract is full payment for performing all contract work in a complete and acceptable manner. All risk, loss, damage, or expense arising out of the nature or prosecution of the work is included in the compensation provided by the contract.

B. Work required by the contract will not be paid for directly unless a pay item for the work is designated in the SCHEDULE OF ITEMS.

C. Work referenced for measurement under another section will not be paid for directly unless a pay item for the work is designated in the SCHEDULE OF ITEMS for the referenced section.

D. Work not paid for directly is considered to be included under the other contract pay items.

E. Unless otherwise shown, work measured and paid for under one pay item will not be paid for under any other pay item.

F. The quantity to be paid for is the quantity designated in the SCHEDULE OF

ITEMS. No payment will be made for work performed in excess of that staked, ordered, or otherwise authorized.

G. When more than one class, size, or thickness is specified in the SCHEDULE OF

ITEMS for any pay item, suffixes will be added to the item number to differentiate between the items.

1.02 DETERMINATION OF QUANTITIES

The following measurements and calculations are used to determine contract quantities:

A. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for seeding, mulching, geotextiles, netting, erosion control blankets, and sodding shall be along slope lines.

2010 01291 - 2 Measurement and Payment

B. The average end area method shall be used to compute volumes of excavation or embankment. However, if in the judgment of the CO the average end area method is impractical, measurement shall be made by volume in hauling vehicles, or by other three-dimensional methods.

C. Structures shall be measured according to neat lines SHOWN ON THE

DRAWINGS, or as altered by the CO in writing to fit field conditions.

D. For items that have linear measurements, such as pipes, pipe culverts, fencing, guardrails, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed. Pipe and pipe arch culverts shall be measured along center of invert, and arches shall be measured at spring line.

E. For aggregates weighed for payment, the tonnage weight shall not be adjusted for moisture content, unless otherwise provided for elsewhere in these specifications.

F. For standard manufactured items – such as fence, wire, plates, rolled shapes, and pipe conduits – identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions.

Unless controlled by tolerances in cited specifications, manufacturer’s tolerances shall be accepted.

1.03 UNITS OF MEASUREMENT

Payment will be by units defined and determined according to measure. Unless otherwise specified, the meanings of the following terms are as follows:

A. Cubic Yard in Place (yd3): Measure solid volumes by the average end area method as follows:

1. Measure cross sections of the original ground and use with design or staked templates, or take other comparable measurements to determine the end areas. Do not measure work outside of the established lines or slopes.

2. If any portion of the work is acceptable, but is not completed to the established lines and slopes, remeasure cross sections or comparable measurements of the portion of the work. Deduct any quantity outside the designated or staked limits. Use these measurements to calculate new end areas.

3. Compute the quantity using the average end areas multiplied by the horizontal distance along a centerline or reference line between the end areas. Deduct any quantity outside the designed or staked limits.

Where it is impractical to measure material by the average end area method, other methods involving three-dimensional measurements may be used.

2010 01291 - 3 Measurement and Payment

Measure liquid volumes in accordance with Subsection 01291-1.03-H.

B. Cubic Yard in the Hauling Vehicle: Measure the cubic yard volume in the hauling vehicle using three-dimensional measurements at the point of delivery.

Use vehicles bearing a legible identification mark with the body shaped so the actual contents may be readily and accurately determined. Before use, mutually agree in writing upon the volume of material to be hauled by each vehicle.

Vehicles carrying less than the agreed volume may be rejected or accepted at the reduced volume.

Level selected loads. If leveling reveals that the vehicle was hauling less than the approved volume, reduce the quantity of all material received since the last leveled load by the same ratio as the ratio of the current leveled load volume to the agreed volume. Payment will not be made for material in excess of the agreed volume.

Material measured in the hauling vehicle may be weighed and converted to cubic yards for payment purposes if the conversion factors are mutually agreed to in writing.

Compute measurement using measurements of material in the hauling vehicles at the point of delivery. Load vehicles to at least their water- level capacity.

Leveling of the loads may be required when vehicles arrive at the delivery point.

C. Each: One entire unit, which may consist of one or more parts. The quantity is the actual number of units comple ted and accepted.

D. Acre (ac): 43,560 ft2. Make longitudinal and transverse measurements for area computations horizontally. Do not make deductions from the area computation for individual exclusions having an area of 218 ft2 or less.

E. Hour (h): Measurement will be for the actual number of hours ordered and performed by the Contractor.

F. Pound (lb): If sacked or packaged material is furnished, the net weight as packed by the manufacturer may be used.

G. Station (Sta): 100 feet. Measure horizontal along the centerline of each roadway, approach road, or ramp.

H. Gallon (gal): The quantity may be measured by any of the following methods.

1. Measured volume container.

2. Metered volume. Use an approved metering system.

3. Commercially packaged volumes.

2010 01291 - 4 Measurement and Payment

I. Lump Sum (LS): Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item.

J. Feet (ft): Measure from end to end, parallel to the base or foundation being measured, or horizontal.

K. Square yard (yd2): Measure on a plane parallel to the surface being measured or horizontal.

Where measurement is horizontal, make no deductions from the area computation for individual exclusions having an area of 1 yd2 or less.

L. Ton (t): 2,000 pounds

No adjustment in contract unit price will be made for variations in quantity due to differences in the specific gravity or moisture content.

Use net certified scale weights, or weights based on certified volumes.

1.04 METHODS OF MEASUREMENT

One of the following methods of measurement for determining final payment is designated in the SCHEDULE OF ITEMS for each pay item:

A. Designed Quantities (DQ): These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units designated in the SCHEDULE OF ITEMS may be authorized under any of the following conditions:

1. Changes in the work authorized by the CO.

2. A determination by the CO that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.

3. A written request submitted to the CO showing evidence of errors in the original design that cause the quantity of a pay item to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is in error.

B. Staked Quantities (SQ): These quantities are determined from staked measurements prior to construction.

C. Actual Quantities (AQ): These quantities are determined from measurements of completed work.

2010 01291 - 5 Measurement and Payment

D. Vehicle Quantities (VQ): These quantities are measured or weighed in hauling vehicles.

E. Lump Sum Quantities (LSQ): These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.

1.05 EARTHWORK TOLERANCES

A. Where tolerances are shown in the contract, they are intended to define

“reasonably close conformity.” Make adjustment s of horizontal or vertical alignment within the tolerances specified in this contract, or shift of balance points up to 100 feet, as necessary to produce the designed roadway section and to balance earthwork. Such adjustments will not be considered “changes.”

2010 01330 - 1 Submittal Procedures

SECTION 01330

SUBMITTAL PROCEDURES

1.01 REQUIREMENTS

A. The Contractor shall submit all information necessary to insure compliance.

The contractor shall submit information at least ten business days prior to beginning the associated work.

B. Submittals and approval by the CO shall be required for all products where the contractor wishes to use an approved equal. Submittals are not required where the contractor proposes to use the exact product specified (i.e. exact model and manufacturer specified).

C. Products installed by the contractor and not approved by the CO are subject to removal and reinstallation with an approved product at the contractor’s expense.

1.02 MANUFACTURER’S LITERATURE AND SHOP DRAWINGS

A. Submit (2) two copies to the CO for approval on the items required herein.

B. Information must be adequate to determine compliance with specifications.

1.03 SAMPLES

A. Submit two samples of each color, style, and etc. of the items required herein.

2010 01450 - 1 Quality Control

SECTION 01450

QUALITY CONTROL

1.01 SUMMARY

A. Provide certification that the quality and quantity of construction conforms to the drawings, specifications, and requirements of the contract.

3.01 CERTIFICATION & MEASUREMENTS

A. Offsite-Produced Materials: Furnish certificates executed by the manufacturer supplier, or vendor, stipulating that all materials produced off site that are incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications. Make each certificate apply to a single commodity or invoice. Certify all incidental purchases needed to remedy minor shortages of material.

B. Quantity Measurements: Make all measurements for computation of quantities for all work items, except those specified for payment by design quantity or lump sum. Compute the quantities for periodic progress payments; the CO will compute the quantities for the final payment based on measurements taken. All Contractor measurements are subject to verification. Submit all field notes, calculation sheets, and other data used to determine quantities, and certify in writing as to the accuracy of the measurements and computations submitted.

3.02 MATERIAL COMPACTION TESTING

A. The government may order compaction tests from a certified testing laboratory.

The contractor shall pay for compaction tests that fail to meet the minimum requirements out lined in these specifications. The government will pay for compaction tests meeting the requirements outlined in these specifications.

02-25-10 01641 - 1 Government Furnished Products

SECTION 01641

GOVERNMENT FURNISHED PRODUCTS

1.01 SCOPE

A. Applies to products that shall be furnished by the government and installed by the contractor. The prefabricated concrete treatment building shall be furnished and placed by the government on a surface constructed by the contractor.

1.02 INSPECTION

A. The contractor shall notify the CO at least 5 calendar days prior to picking up or returning government furnished products.

B. The contractor and the CO shall jointly inspect all products during the loading operation (picking up products) and the unloading operation (returning products) from the storage area.

1.03 LIABILITY

A. The contractor’s liability for government furnished products shall start at the time the products are accepted at the storage area, and shall terminate upon completion and final acceptance of the work.

B. The contractor shall provide all labor, equipment, and incidentals necessary to transport the government furnished products between the project and storage area.

1.04 REPLACEMENT AND/OR SUPPLEMENTAL PRODUCTS

A. Any defective products discovered prior to the contractor’s acceptance of the products will be replaced by the Government.

B. If the quantity of government furnished products accepted by the contractor is insufficient to complete the specified work, supplemental products complying with these specifications will be provided by the government at no expense to the Contractor.

C. The government shall not replace any products that, in the opinion of the CO, are damaged or lost due to the contractor’s negligence after the contractor accepts the products. Such products shall be replaced at the contractor’s expense.

02-25-10 01641 - 2 Government Furnished Products

1.05 SURPLUS PRODUCTS

A. After completion and final acceptance of the work, surplus government furnished products shall be returned to the storage area in the same mechanical and physical condition as originally accepted.

B. Damaged surplus products shall be replaced at the contractor’s expense.

C. The contractor’s liability for surplus products shall terminate upon unloading at the storage area.

1.01 PREFABRICATED CONCRETE TREATMENT BUILDING – GOVERNMENT

FURNISHED AND PLACED.

A. The government shall furnish a prefabricated 12’ by 10’ concrete treatment building at no cost to the contractor. The contractor shall construct the surface for placement of the treatment building prior to delivery and place the building upon arrival.

B. The government shall furnish lock cylinders for replacement of lock treatment building lock cylinders.

1.01 GENERAL

A. Installation and testing of government furnished products shall comply with the applicable contract specifications covering work requiring the use of such products.

B. The prefabricated concrete treatment building and concrete toilet building delivery date will be agreed upon between the government, the manufacturer, and the contractor upon award of this contract.

2010 01660 - 1 Product Storage and Handling Requirements

SECTION 01660

PRODUCT STORAGE AND HANDLING REQUIREMENTS

A. The Contractor shall be responsible for protecting all equipment and supplies intended for use in the project. The Contractor shall pay all costs related to such protection.

B. Equipment and supplies, approved by the CO and in storage, shall be installed in the same physical and mechanical condition as when approved by the CO.

2010 01721 - 1 Construction Surveying & Staking

SECTION 01721

CONSTRUCTION SURVEYING & STAKING

A. Construction staking of waterlines, storage tank, and treatment building shall be in accordance with Section 02510 – Water Distribution, Subsection 3.03 – General Installation Procedures, Subpart A.

B. Construction staking shall not be required to be under the direction of a licensed professional engineer or land surveyor.

2.01 STAKES

A. Furnish stakes of the type and quality normally used in highway survey work, and suitable for the intended use. Furnish stakes and hubs of sufficient length to provide a solid set in the ground with sufficient surface area above ground for necessary legible markings.

3.01 GENERAL

A. Furnish all labor, equipment, instruments, materials, transportation, and other incidentals necessary to complete the construction surveying and staking in accordance with these specifications and acceptable engineering practice.

2010 01732 - 1 Mobilization

SECTION 01732

MOBILIZATION

A. Move personnel, equipment, material, and incidentals to the project, and perform all activities necessary to accomplish work at the project site. Obtain permits, insurance, and bonds.

1.02 PAYMENT

A. Mobilization is incidental to the pay items designated in the SCHEDULE OF

ITEMS. Unit pricing shall be considered to include mobilization.

2010 01740 - 1 Cleaning

SECTION 01740

CLEANING

1.01 CLEAN UP

A. The work site shall be maintained in a neat condition during construction. The work site shall be kept free from accumulation of waste materials and rubbish resulting from the work.

B. If work is stopped or delayed for an extended period of time, the Contractor shall clean up the site as determined by the C.O.

C. Before final acceptance of the project, the Contractor shall remove all waste materials and rubbish resulting from the work.

2010 01780 - 1 Closeout Submittals

SECTION 01780

CLOSEOUT SUBMITTALS

3.01 AS-BUILT DRAWINGS

A. Maintain a set of the contract drawings depicting as-built conditions. Maintain these drawings in current condition, and make them available for review.

Indicate all variations from contract drawings in red on the drawings. Upon completion of the contract work, submit as-built drawings to the CO.

3.02 KEYS

A. Return any keys issued to the contractor by the government, prior to final acceptance and payment.

San Juan National Forest Reccreation Site Water and Wastewater Deferred Maintenance 2010 02081 - 1 Galvanized Steel Piping

SECTION 02081

GALVANIZED STEEL PIPING

1.01 SCOPE

A. Installation of galvanized steel pipe used for potable water distribution and material related to its installation.

PART 2 PRODUCTS

2.01 GALVANIZED STEEL PIPE AND FITTINGS

A. Pipe: ASTM A-120 or AWWA C-202, Schedule 40, threaded and coupled.

B. Fittings: ANSI B-16.12, threaded, galvanized.

2.02 SUCTION SCREEN/STRAINER

A. Pipe-mounted suction screens U.S Mesh size 20, part numbers F-8-20 (1”), F- 16-20 (2”) and F-24-20 (3”), as manufactured by flow Ezy Filters, Inc., Ann Arbor, MI (800) 237-1165, or approved equal.

2.03 WATER STORAGE TANK VENT

A. Fabricate using a galvanized steel tee and two Galvanized Steel elbows. Vent shall extend down and shall have suction screen/strainer as specified in subsection 2.02.

3.01 INSTALLATION

A. Exposed threaded pipe joints shall be painted with mastic per manufacturer's application procedures.

B. Field-cut ends shall be squared off by grinding or filing; ends shall be reamed with all chips and flakes removed.

C. Field cut threads or machined joints shall be made with sharp tools to sharp finished ends.

2010 02082 - 1 Valves and Boxes

SECTION 02082

VALVES AND BOXES

A. Description of valves, boxes, pits and material related to their installation.

1.02 MEASUREMENT

A. Measurement sha ll be as designated in the SCHEDULE OF ITEMS. Valves will be measured per each valve replaced and functional.

B. Valves replaced in conjunction with water hydrants are incidental to the construction of the water hydrants and no separate payment for these valves shall be made.

C. Valves replaced in conjunction with water distribution line installation are incidental to the construction of the waterline and no separate payment for these valves shall be made.

1.03 PAYMENT

A. Payment will be at the contract unit price for each item accepted. Payment will be made under:

Pay Item Pay Unit

02082 (01) Valve Replacement ........................................................ Each

2.01 BALL CURB VALVES

A. Ball curb valves shall be standard arch pattern.

B. Female Iron Pipe inlet by Female Iron Pipe outlet

C. Hole for attaching curb box rod or handle is provided in Tee Head.

D. Valve is water-tight with flow through in both directions.

E. Brass construction conforming to AWWA standard C800-89.

F. Quarter turn check

2010 02082 - 2 Valves and Boxes

G. 300 psi working pressure

H. Ball curb valves shall be Mueller 300 series (Model B-20283) as manufactured by Mueller Co., Decatur, IL, phone (217) 423-4471; or approved equal.

2.02 CURB BOXES

A. Curb boxes shall have an arch base and foot piece compatible the Mueller 300 series ball curb valves. Both boxes shall be a cast iron extension type.

B. Box length when installed, shall permit adjustment between 3 inches above and below the final ground surface. Boxes located at water hydrants shall have a fully retracted length of 12-inches, and an extended length of 24- inches.

C. Lids shall be cast iron with brass pentagon plugs

D. Arch size shall be of proper size to match ball curb valve.

E. Box shall be equipped with stationary rod, and have a 1 ¼-inch inside diameter upper section. The top of the stationary rod shall terminate within the 1 ¼-inch inside diameter upper section of the box, and not interfere with screwing in the pentagon plug to its full depth.

F. Curb boxes shall be Mueller Improved Extension type with Arch Pattern Base

(Model H-10385) and Optional Foot Piece (H-10397), as manufactured by Mueller Co., Decatur, IL, phone (217) 423-4471; or approved equal.

2.03 TOOLS FOR OPERATING VALVES, CURB STOPS, AND OPENING BOXES

A. The Contractor shall supply two curb box keys and two pentagon keys to operate valves, curb stops, and open box lids. Tools shall be as supplied by the valve, curb stop, or box manufacturer for each water system where curb valves are installed.

B. Curb box key shall be model H-10321, 4-feet in length as manufactured by

Mueller Co., Decatur, IL, phone (217) 423-4471; or approved equal.

C. Pentagon key shall be model H-10323 as manufactured by Mueller Co., Decatur, IL, phone (217) 423-4471; or approved equal.

2010 02083 - 1 Water Hydrants

SECTION 02083

WATER HYDRANTS

A. Provides for furnishing and installing water hydrants at locations SHOWN ON

THE DRAWINGS.

1.02 MEASUREMENT

A. Measurement sha ll be as designated in the SCHEDULE OF ITEMS. Water hydrants will be measured per each water hydrant installed complete, and functional, including all concrete, if required, and related material and labor.

B. Trail construction between hydrant and edge of existing road, spur, or turnout will not be paid for separately but will be considered subsidiary to water hydrant construction.

1.03 PAYMENT

A. Payment will be at the contract unit price for each item accepted. Payment will be made under:

02083 (01) Water Hydrant ............................................................... Each 02083 (02) Water Hydrant Signing ................................................... Each 02083 (03) Hose Bib ........................................................................ Each

2.01 HYDRANT POST

A. 8" x 8" x 6'-6” long, rough sawn No. 2 or better Douglas Fir, Southern Yellow

Pine, or Hem Fir; pressure-treated, installed as SHOWN ON THE DRAWINGS.

B. Wood Preservative: Pressure treatment with CCA (Type A, B, or C) in accordance with AWPA–C1, C2, and C4, with a net retention of 0.60 pcf. All CCA shall conform to ASTM–1625.

2010 02083 - 2 Water Hydrants

2.02 DRAIN ROCK

A. Material shall be clean, rounded granular material, graded from 1" - 2" in greatest dimension.

2.03 PIPE AND FITTINGS

A. Section 02081, Galvanized Steel Pipe, Schedule 40, sizes as SHOWN ON THE

DRAWINGS.

2.04 BALL VALVE CURB STOPS AND CURB BOXES

A. Section 02082 – Valves and Boxes, size and length as SHOWN ON THE

2.05 CONCRETE PAD

A. Size as SHOWN ON THE DRAWINGS, placed in conformance with Section 03301 – Concrete, Formwork and Reinforcement.

2.06 PADDLE FAUCET

A. Self-closing bib faucet with plain end. Plain end means no threads, so a garden hose cannot be attached to the end.

B. Extended "paddle" type handle for accessibility. Operation of handle shall require less than 3.5 lbs.

C. Equipped with integral 2.5 gpm flow control

D. Finish shall be non-chromed brass. Brass shall be lead free and suitable for dispensing potable water.

E. Model No. 6252EHLF, as manufactured by Haws Co., Sparks, NV, phone:

(888) 640-4297; or approved equal.

2.07 HOSE BIB WITH INTEGRATED VACUUM BREAKER

A. Finish shall be brass.

B. Inlet connection shall be ¾-inch female hose thread, and outlet connection shall be ¾-inch male hose thread.

C. Shall meet ASSE 1011 and ANSI A112.1.3.

D. Model No. 363LF as manufactured by Arrowhead Brass Products, (323) 221-

2010 02083 - 3 Water Hydrants

9137, or approved equal

3.01 GENERAL

A. Wood posts shall be cut and drilled to the lengths and chamfered, as SHOWN

ON THE DRAWINGS. All posts shall be pressure treated with wood preservative. All field cuts, abrasions, and holes made in the timbers after treatment shall be given three (3) brush coats of 9% copper napthenate preservative (equivalent to 1% metallic copper).

B. The post and riser pipe shall be placed in the trench, plumb and to the elevations

SHOWN ON THE DRAWINGS, and backfilled with material meeting the requirements of Section 02316 – Trenching, Backfilling, and Compacting, Part

2.02 Subsequent Backfill. Backfill shall be deposited and carefully compacted in layers not to exceed 12” in thickness (thickness measured before compaction).

Each layer shall be compacted by not less than three passes over the entire surface with a mechanical vibrating tamper.

C. Prior to construction, the CO shall approve exact location and orientation of hydrants.

D. Elevation of edge of concrete pad shall be the same as adjacent finished surface of edge of road, spur, or trail. Concrete pads not meeting this requirement shall be removed by the contractor and replaced at no cost to government. Backfill and fine grade around the outside of the concrete pad.

E. Drain rock shall be loosely placed to the dimensions SHOWN ON THE

F. Mount “NO WASHING OR BATHING” signs to hydrant posts using slotted oval-head stainless steel 18-8 wood screws at each corner.

G. Inspect existing hydrant hose bibs and replace those without anti-siphon protection with hose bibs specified in Section 2.07.

2010 02084 - 1 High Density Polyethylene Piping

SECTION 02084

HIGH DENSITY POLYETHYLENE PIPING

A. Provides for furnishing and installing High Density Polyethylene (HDPE) pipe used for potable water distribution and material related to its installation.

2.01 HIGH DENSITY POLYETHYLENE (HDPE) PIPE, TEES, & REDUCERS

A. All waterlines (pipe and fittings) shall be new and unused, of the type, pressure rating or class, and size (nominal diameter) specified and as SHOWN ON THE

B. All material must meet applicable National Sanitation Foundation (NSF) standards for public drinking water. Pipe shall bear the NSF seal. The pipe manufacturer shall provide certification that the pipe meets this specification.

C. High Density Polyethylene (HDPE) plastic pipe shall be PE-3408 as defined in

ASTM D-1248, with a minimum cell classification of 345464C in accordance with ASTM D 3350. The pipe shall be SDR7 (200 PSI) pipe and comply dimensionally with ASTM D 2737. Pipe shall comply with AWWA C901 standard for Polyethylene Pressure Pipe. The pipe shall be listed for potable water to ANSI/NSF standard 61.

D. Rolled Pipe

1. HDPE pipe equal to 1” diameter shall be provide in rolls of 100 ft or 300 ft length.

3. HDPE pipe equal to 2" diameter shall be provided in rolls of 100 ft or 200 ft length.

2. HDPE pipe larger than 2" diameter shall be provided in 40' lengths rather than in rolls.

E. HDPE pipe shall be as manufactured by JM Eagle, 4501 W. 49th Street, Tulsa

OK, 74107, 1-800-962-1514, and supplied by Grand Junction Pipe & Supply Co., Durango, CO, phone (970) 385-6733; or approved equal.

F. HDPE tees and reducers shall be as manufactured by Mueller Company, 500 W.

Eldorado ST., Decatur IL, 62522, and supplied by Grand Junction Pipe &

2010 02084 - 2 High Density Polyethylene Piping

Supply Co., Durango, CO, phone (970) 385-6733; or approved equal.

2.02 TRANSITION FITTINGS - COMPRESSION

A. Fittings shall be as manufactured by Mueller Company, 500 W. Eldorado ST., Decatur IL, 62522, and supplied by Grand Junction Pipe & Supply Co., Durango, CO, phone (970) 385-6733; or approved equal.

B. Fittings shall be compression x female iron pipe thread.

3.01 LAYING PIPE

A. HDPE pipe shall be weaved in the trench to provide horizontal slack in the line for expansion and contraction.

B. Pipe shall be allowed to cool to within 20o F of the shaded trench bottom temperature before backfilling.

3.03 PIPE JOINING

A. The joining method for pipe, tees, and reducers shall be installed in accordance with the manufacturer's recommendations.

3.04 PIPE TRANSITIONS

A. Transitions for making connections from HDPE pipe to other threaded pipe or connections shall be per:

1. Subsection 2.02 – Transition Fittings – Compression

2010 02086 - 1 Brass Piping / Nipples

SECTION 02086

BRASS PIPING / NIPPLES

A. Installation of red brass pipe / nipples used in Building Plumbing.

2.01 BRASS PIPE / NIPPLES

A. ASTM B 687 and ASTM B 43.

B. Temper shall be annealed temper (061).

2.02 RELATED SECTIONS

A. Section 15141 – Building Plumbing.

3.01 INSTALLATION

A. Exposed threaded pipe joints shall be painted with mastic per manufacturer's application procedures.

B. Field-cut ends shall be squared off by grinding or filing; ends shall be reamed with all chips and flakes removed.

C. Field cut threads or machined joints shall be made with sharp tools to sharp finished ends.

2010 02220 - 1 Site Demolition

SECTION 02220

SITE DEMOLITION

A. Applies to the removal and backfilling of existing underground utilities within trenching limits of new construction.

B. Removal and disposal of existing hydrants, treatment building, and storage tanks.

C. In-place demolition and backfilling of exiting concrete storage tanks.

D. Removal and capping of existing water lines.

1.02 DISPOSAL

A. Remove from project all debris and non-salvageable materials designated for removal in accordance with federal and local regulations. Make necessary arrangements with property owners, and haul debris and non-salvageable materials off of Forest Service lands to suitable disposal locations as approved by the CO. Furnish a signed copy of the disposal agreement.

2.01 BACKFILL

A. Backfill material shall be pit run comprised of 6-inch minus material with a relatively uniform gradation from coarse to fine and a minimum of 50% passing the No. 4 sieve.

3.01 GENERAL REMOVAL

A. Demolition and removal of treatment building, concrete storage tanks, and hydrants shall be done so as to minimize damage to the surrounding vegetation and contamination to the well and ground water. Damage to other structures and utilities not designated for removal, shall be repaired by the contractor at no expense to the government.

2010 02220 - 2 Site Demolition

B. Concrete storage tanks demolished in-place shall have the tops collapsed and tank bottom sufficiently broken to prevent water retention. Backfill material as specified in Section 2.01 – Backfill shall be completed in 12- inch compacted layers and mounded to approximately 6 inches above the natural grade to promote drainage.

C. Cap existing water lines and abandon old water system in place. Remove existing abandoned water lines to be abandoned where new water lines cross.

D. Cap existing water lines at spring box and tanks. Drain spring box to natural drainage.

E. Holes created from removals shall be backfilled and compacted in layers not to exceed 12” in thickness. Each layer shall be compacted at optimum moisture content by not less than three passes over the entire surface with a mechanical vibrating tamper. The top 6” of backfill shall be topsoil, and remain loose enough to allow plant growth.

F. Restore grade in area of removals, to approximate natural contours.

3.02 PAYMENT

A. Costs for vault pumping and waste disposal shall be incidental to the Vault Toilet Removal and Disposal Pay Items 02120(01) through 02120(06) described below.

Pay Item Description Pay Unit 02220 (01) Site Demolition (Water Hydrant) ................. Each 02220 (02) Site Demolition (Septic Tank)....................... Each

2010 02230 - 1 Site Clearing

SECTION 02230

SITE CLEARING

A. This Section includes clearing, grubbing, and disposal of trees, brush, stumps, and rubbish within the clearing limits of construction.

3.01 CLEARING

A. Clearing Limits: Clearing limits shall not exceed 12 feet for utility lines and shall be performed in such a manner so as not to leave straight & uniform vegetation lines. Clearing limits shall be 5 feet from exterior walls of buildings, concrete slabs, and excavation limits; or as SHOWN ON THE DRAWINGS.

B. Clear small trees, brush, snags, underbrush, and rubbish within the clearing limits.

C. Individual marked trees, within the clearing limits, shall be left standing and uninjured.

E. All designated timber cut during clearing operations having a minimum diameter of 6 inches inside bark shall be cut into the longest lengths possible with any of the following combinations of lengths: 8’6”, 10’6”, 12’6”, 16’6”, 18’6”, 20’6”, 23’, 25’, 27’, 29’, 31’, or 33’. Butt logs should be cut to the longest length possible. Conifer logs will be bucked to a minimum top diameter of 6” inside bark. Aspen logs will be bucked to a minimum top diameter of 4” inside bark.

Timber will be neatly stacked at a location designated by the CO on the construction site. Conifer and aspen will be decked separately. Deck depth shall not exceed three layers of logs. They shall be constructed with shorter log lengths on the top layers. Title to all such timber shall remain with the Government.

2010 02230 - 2 Site Clearing

F. All conifer timber removed during clearing operations having a diameter between 3” and 6”, or not meeting the minimum length specified in 3.01.E, shall be trimmed of limbs and top and neatly decked at a location designated by the CO on the construction site. Title to all such timber shall remain with the Government.

G. Limbs with a diameter of less than 3 in. and brush shall be considered vegetative debris and treated in accordance with subsection 3.03.

3.02 GRUBBING

A. Utility lines: Inside the clearing limits, cut stumps and projecting roots flush with the natural ground.

B. Structures, Buildings, and Areas to be Graded: Inside the clearing limits, Grub and remove all stumps. Grub and remove all roots to a depth of at least 18 in.

below the natural ground when fill is required for site grading. When excavation is required for site grading, grub and remove all roots to a depth of at least 18 in. below finished grade.

3.03 DISPOSAL

A. Disposal of vegetative debris shall be accomplished by scattering the debris within the project site as directed by the CO.

B. Stumps shall be buried in the unsuitable and excess excavation area. See

Section 02315 – Excavation and Fill, Part 3.02, Subpart A.

C. Rubbish (non-vegetative) shall be disposed of by removal from project in accordance with federal and local regulations.

2010 02300-1 Earthwork

SECTION 02300

EARTHWORK

PART 1 - GENERAL

1.01 SUMMARY

A. This Section includes the following:

1. Excavating and backfilling for buildings and structures.

2. Excavating and backfilling trenches.

3. Excavating, backfilling, embankment and site grading for roads, spurs, and related site work.

1.02 DEFINITIONS

A. Backfill: Soil materials used to fill an excavation.

1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.

2. Subsequent Backfill: Backfill placed over initial backfill to fill a trench.

B. Aggregate Base Course: Layer placed between the subgrade and concrete slab.

C. Bedding: Layer placed over the excavated subgrade in a trench before laying pipe.

D. Borrow: Satisfactory soil imported from off-site for fill or backfill.

E. Drainage Course: Layer supporting slab-on-grade used to minimize capillary flow of pore water.

F. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated.

1. Additional Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions as directed by Contracting Officer (CO).

Additional excavation and replacement material will be paid for according to Contract provisions for changes in the Work.

2. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions without direction of the CO. Unauthorized excavation, as well as remedial work directed by CO, shall be without additional compensation.

3. Unclassified Excavation: Excavation to subgrade elevation and to lines and dimensions indicated regardless of the character of surface and subsurface conditions encountered, including rock, soil materials, and obstructions.

2010 02300-2 Earthwork

4. Rock Excavation: Rock material in beds, ledges, unstratified masses, and conglomerate deposits and boulders of rock material exceeding 2.5 cu. yd. that cannot be removed by rock excavating equipment equivalent to the following in size and performance ratings, without systematic drilling, ram hammering, ripping, or blasting when permitted:

a. Excavation of Footings, Trenches, and Pits: Late-model, track-mounted hydraulic excavator; equipped with a 30- inch-wide, short-tip-radius rock bucket; rated at not less than 120-hp (89-kW) flywheel power with bucket-curling force of not less than 25,000 lbf (111 kN) and stick-crowd force of not less than 18,700 lbf (83 kN); measured according to SAE J-1179.

b. Bulk Excavation: Late-model, track-mounted loader; rated at not less than 210-hp (157-kW) flywheel power and developing a minimum of 45,000-lbf (200-kN) breakout force; measured according to SAE J-732.

G. Fill: Soil materials used to raise existing grades.

H. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface.

I. Subbase Course: Layer placed between the subgrade and base course for concrete or asphalt pavement or walk.

J. Subgrade: Surface or elevation remaining after completing excavation, or top surface of a fill or backfill immediately below subbase, aggregate base, drainage fill, initial or subsequent backfill, or topsoil materials.

K. Utilities include on-site underground pipes, conduits, ducts, and cables, as well as underground services within building.

1.03 SUBMITTALS

A. Contractor shall submit to the CO for approval source of aggregate base and backfill materials and certified sieve analysis.

1.04 PROJECT CONDITIONS

A. Existing Utilities: Do not interrupt utilities serving facilities occupied by Government or others unless permitted in writing by Contracting Officer (CO) and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify CO not less than two days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without CO’s written permission.

3. Contact utility- locator service for area where Project is located before excavating.

2010 02300-3 Earthwork

B. Demolish and completely remove from site existing underground utilities indicated to be removed. Coordinate with utility companies to shut off services if lines are active.

1.05 MEASUREMENT

A. Method of measurement shall be designated in the SCHEDULE OF ITEMS.

B. Mobilization shall be included in the hourly rate.

C. Measurement will be made for the hours of equipment use, which may include but is not limited to backhoes, trackhoes, skidsters and compactors. Equipment must be operated by a seated operator. All other equipment is considered incidental to earthwork, excavation, backfill, and trenching.

1.06 PAYMENT

A. This work will be paid for at the contract unit price as designated in the SCHEDULE

OF ITEMS. Payment will be made under:

02300 (01) Earthwork ....................................................................... Hour

PART 2 - PRODUCTS

2.01 GENERAL BACKFILL MATERIALS

A. Excavated material may be processed and used for backfill if the Contractor can show compliance with the material specified herein to the satisfaction of the CO. If excavated material is not sufficient to meet requirements, Contractor shall import needed material.

B. Satisfactory Soils: ASTM D 2487 soil classification groups GW, GP, GM, SW, SP, and SM, or a combination of these group symbols; free of rock or gravel larger than 3 inches (75 mm) in any dimension, debris, waste frozen materials, vegetation, and other deleterious matter.

C. Unsatisfactory Soils: ASTM D 2487 soil classification groups GC, SC, ML, MH, CL, CH, OL, OH, and PT, or a combination of these group symbols.

1. Unsatisfactory soils also include satisfactory soils not maintained within 2 percent of optimum moisture content at time of compaction.

2.02 BEDDING

A. Section 2316 – Trenching, Backfilling and Compacting

2010 02300-4 Earthwork

2.03 INITIAL BACKFILL

A. Section 2316 – Trenching, Backfilling and Compacting

2.04 SUBSEQUENT BACKFILL

A. Section 2316 – Trenching, Backfilling and Compacting

2.05 AGGREGATE BASE

A. Section 2730 – Aggregate Surfacing

PART 3 - EXECUTION

3.01 LOCATION, ALIGNMENT AND GRADE

B. The location of all pipelines and structures shall be staked out and grades established by the Contractor. Locations shall be approved by the CO before excava tion is started.

3.02 PREPARATION

A. Protect structures, utilities, sidewalks,…