RECOVERY--Z--PROJECT NUMBER RM09-1455, Facility Energy Improvements (PHASE 4), Naval Base Ventura County, CA
Award Notice Posted
- Solicitation number
- N6247307D2042X0001
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Awarded
- to RMA Land Construction, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- N62473-08-D-8658-0003 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
RECOVERY-PROJECT NUMBER RM09-1455, Facility Energy Improvements (PHASE 4), Naval Base Ventura County, CA PER 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: NORTHERN CALIFORNIA 8(A) IV MACC GROUP 0047, N62473-07-D-2042; INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR NEW CONSTRUCTION, RENOVATION, REVITALIZATION, ALTERATION, AND REPAIR OF VARIOUS FACILITIES AT VARIOUS LOCATIONS WITHIN THE NAVFAC SOUTHWEST AREA OF RESPONSIBILITY INCLUDING BUT NOT LIMITED TO NORTHERN CALIFORNIA, NEVADA, UTAH, AND COLORADO.
PATRICIA I ROMERO, INC. DBA PACIFIC WEST BUILDERS, N62473-08-D-8655ALLEN ENGINEERING CONTRACTOR, INC., N62473-08-D-8657RMA LAND CONSTRUCTION, INC., N62473-08-D-8658HAL HAYS CONSTRUCTION, INC., N62473-08-D-8659 SOUZA CONSTRUCTION, INC., N62473-08-D-8660I E PACIFIC,INC. N62473-08-D-8661
The work includes, but is not limited to, Exterior Lighting and 0.125 GPF Urinal Replacement. Install one-pint(0.125 gpf)urinals in replace of old, outdated, and more recent, high-water usage (one-gallon or more) urinals and flush valves with new,one-pint flush urinals with sensor-controlled flush valves.These urinals use 1/8th the volume of a standard one-gallon flush fixture. The overall goal of this project is waterconservation.
This project will also replace existing, deteriorated, outdated lighting fixtures with new, utilizing fixturesequipped with the latest lighting technologies (pulse-start metal halide, induction and LED systems). Installation of these new light fixtures will not only save considerable energy (more energy efficient), but will result in lessmaintenance costs, due to their longer lamp life and newer electrical components, better color rendition (white light),and in most cases, instant start (with induction and LEDfixtures).
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity