RECOVERY--Z--PROJECT NUMBER BB40032-8J, Repair Exterior Fitness Facility
Award Notice Posted
- Solicitation number
- BB40032-8J
- Agency
-
MICC Fort Campbell
Mission and Installation Contracting Command, Department of Defense
- Awarded
- to Rogers Group, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W9124808D0001-0083 Federal contract award
- NAICS code
- Not on record
- PSC
- Not on record
- Place of performance
- Fort Campbell DOC Directorate of Contracting, Building 2176, 13 1/2 Street Fort Campbell KY 42223 US
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Change the Title from Repair Fryar Stadium Track, Fort Campbell, Kentucky to Repair Exterior Fitness Facility, Fort Campbell, Kentucky
Update #1 ·
THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER Multiple Task Order Contracts (MTOC), W91248-08-D-0004, Linc Government Services, 270-885-4675; W91248-08-D-0005, RCI, Inc, 859-263-2081; W91248-08-D-0006, TMS Contracting/Compton Construction, 931-647-2233; and W91248-08-D-0007, Vanguard Contractors, 931-431-377. The Directorate of Contracting intends to competitively award a firm-fixed price task order utilizing Recovery Act of 2009 funding under MTOC. Please note that only the contractors who have been awarded a Task Order Contract from Fort Campbell, Kentucky, Contracting Office are eligible to prepare and submit a proposal for this solicitation. The anticipated scope of work may include, but is not limited to all labor, supervision, materials and equipment necessary for construction of the installation of a synthetic turf athletic field and replacement of the running track which includes removing the existing goal posts and concrete foundations. Work also includes removing and reinstall play clocks; install continuous reinforced concrete curb at the inside perimeter of the running track; remove existing field surface to the lines and grades; excavate the perimeter drains to the lines and grades; remove existing perimeter drain system and install new; remove existing lateral drains and install new; install aggregate base course & compact; relocate Long Jump Runway and Landing Areas and Pole Vault Runway and Landing Area; removed High Jump area and replace at same location; install goal posts; remove existing running track and replace with a polyurethane surface; install sidewalks; install electrical outlets; install field markings and logo, and train facility staff on the maintenance and repair of the turn. For more information contact by email Debra J. Rapp at debra.j.rapp@us.army.mil. Email is the preferred method of contact.
Notice history
| Notice | Type | Posted |
|---|---|---|
| RECOVERY--Z--PROJECT NUMBER BB-40032-8J -- Repair Exterior Fitness Facility - Paving Of South Lot At Fryar Stadium | Award Notice | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity