RECOVERY--Z--PROJECT NUMBER BB-40032-8J -- Repair Exterior Fitness Facility - Paving Of South Lot At Fryar Stadium

Award Notice Posted

Solicitation number
BB-40032-8J
Agency
Awarded
to R C I, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
W91248-08-D-0005-0038 Federal contract award
NAICS code
Not on record
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

The Directorate of Contracting intends to issue a delivery order against an Indefinite Delivery Indefinite Quantity Contract, Contract Number W91248-08-D-0001 with Rogers Group, Inc, Hopkinsville, KY 42241. The requirement is for Contractor to remove approximately the existing gravel surface and concrete pads, grade the area to a constant grade, prepare the sub-grade, place aggregate backfill and resurface the area. The area to be resurfaced, re-striped and marked per existing markings. The completed surface will include a poured in place concrete curbing, drainage structures, sidewalk and dumpster pad. construct new parking lot and stripe the area. Approximate quantities are 8122 square yards of parking area. The delivery order will be funded through the American Recovery and Reinvestment Act of 2009.

Update #2 ·

THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO THE CONTRACTOR AWARDED THE IDIQ CONTRACT. The Directorate of Contracting intends to issue a delivery order against an Indefinite Delivery Indefinite Quantity Contract, Contract Number W91248-08-D-0001 with Rogers Group, Inc, Hopkinsville, KY 42241. The requirement is for Contractor to remove approximately the existing gravel surface and concrete pads, grade the area to a constant grade, prepare the sub-grade, place aggregate backfill and resurface the area. The area to be resurfaced, re-striped and marked per existing markings. The completed surface will include a poured in place concrete curbing, drainage structures, sidewalk and dumpster pad. construct new parking lot and stripe the area. Approximate quantities are 8122 square yards of parking area. The delivery order will be funded through the American Recovery and Reinvestment Act of 2009.

Update #1 ·

This award was a result of a competitive Multiple Award Task Order Contract (MTOC) action. . This is a FIXED PRICE task order. The scope of work may include, but is not limited to all labor, supervision, materials and equipment necessary for construction of the installation of a synthetic turf athletic field and replacement of the running track which includes removing the existing goal posts and concrete foundations. Work also includes removing and reinstall play clocks; install continuous reinforced concrete curb at the inside perimeter of the running track; remove existing field surface to the lines and grades; excavate the perimeter drains to the lines and grades; remove existing perimeter drain system and install new; remove existing lateral drains and install new; install aggregate base course & compact; relocate Long Jump Runway and Landing Areas and Pole Vault Runway and Landing Area; removed High Jump area and replace at same location; install goal posts; remove existing running track and replace with a polyurethane surface; install sidewalks; install electrical outlets; install field markings and logo, and train facility staff on the maintenance and repair of the turn. For more information contact by email Debra J. Rapp at debra.j.rapp@us.army.mil. Email is the preferred method of contact.

Notice history

Notice Type Posted
This notice Latest Award Notice
RECOVERY--Z--PROJECT NUMBER BB40032-8J, Repair Exterior Fitness Facility Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors