4 versions

Update #4 · Latest ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Asset Group, Downey Contracting, The Ross Group, & Southwind Construction;

W912BV-10-D-2020; 2021; 2022; & 2023. SMALL BUSINESS SET - ASIDE, MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR DESIGN-BUILD INDEFINITE DELIVERY CONTRACT FOR CONSTRUCTION DESIGN-BUILD SERVICES FOR SOUTHWEST DIVISION, PRIMARILY FOR TULSA DISTRICT. THE INTENT OF THIS ARRA PROJECT IS TO Upgrade Public Use Areas Various Locations, Lake Eufaula, Oklahoma; Porum Landing - Replace two Water Borne Toilet Facilities, Remove and Replace fencing around sewage lagoon, Repair asphalt roadway and parking. Brooken Cove - Demolition of existing gatehouse and entrance road and construct gatehouse and entrance road, Replace vault toilet and waterborne shower toilet facilities, Provide 50 amp electric to twenty three campsites, Repair asphalt roadway and parking. Dam site South - Demolition of existing gatehouse and entrance road and construct gatehouse and entrance road, Replace overhead power, Provide water and 50 amp electric to thirty three campsites, Replace water borne toilet and water borne shower toilet facilities, Remove and Replace fencing around sewage lagoon. Elm Point - Replace two vault toilet facilities, Repair asphalt roadway and parking. Gentry Creek - Demolition of existing gatehouse and entrance road and construct gatehouse and entrance road, Relocate water, electric and telephone, Provide water and 50 amp electric to eighteen campsites, Replace two vault toilet facilities, Provide riprap erosion control, Repair asphalt roadway and parking. Highway 9 - Replace two corrugated metal pipe culverts. Replace in kind, Provide riprap erosion control, Replace two vault toilet facilities, Replace one water borne toilet facility. Belle Starr - Provide water and 50 amp electric to twenty nine campsites, Replace one vault toilet and two water borne shower toilet facilities, Repair asphalt roadway and parking. Mill Creek Bay - Replace two vault toilet facilities, Repair asphalt roadway, Provide asphalt parking and concrete sidewalks to new toilet facilities. Oakridge - Replace two vault toilet facilities.

Update #3 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): The Ross Group, Au Authum Ki, Asset Group, Overland Corporation, and Trend Construction under W912BV-10-D-2014

, W912BV10-D-2015, W912BV-10-D-2016, W912BV-10-D-2017, W912BV10-D-2018 for design and construct a new building addition (2300 square feet) and renovate portions of the existing (2500 square feet) Truscott Brine Lake Project Office near Truscott, Texas. The work shall consist of demolition, site grading, foundation, framing, roofing, utilities, and architectural finishes.

The Tulsa District Army Corps of Engineers exercised option 1 of a Firm-Fixed Price task order to The ROSS Group Construction Corporation. This task order was awarded for: Rehab Truscott Project Office. Reduce future maintenance cost. Located at Arkansas Red River Basins Chloride Control Area VIII, Texas. This action is procured as a part of the American Recovery and Reinvestment Act (ARRA) of 2009.

Update #2 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): The Ross Group, Au Authum Ki, Asset Group, Overland Corporation, and Trend Construction under W912BV-10-D-2014

, W912BV10-D-2015, W912BV-10-D-2016, W912BV-10-D-2017, W912BV10-D-2018 for design and construct a new building addition (2300 square feet) and renovate portions of the existing (2500 square feet) Truscott Brine Lake Project Office near Truscott, Texas. The work shall consist of demolition, site grading, foundation, framing, roofing, utilities, and architectural finishes.

The Tulsa District Army Corps of Engineers intends to exercise option 1 of a Firm-Fixed Price task order to The ROSS Group Construction Corporation. This task order was awarded for: Rehab Truscott Project Office. Reduce future maintenance cost. Located at Arkansas Red River Basins Chloride Control Area VIII, Texas. This action is procured as a part of the American Recovery and Reinvestment Act (ARRA) of 2009.

Update #1 ·

Small Business Indefinite Delivery / Indefinite Quantity Multiple Award Task Order Contract (MATOC) with an estimated $49,500,000 capacity for the pool of MATOC contractors selected for award.

Notice history

Notice Type Posted
RECOVERY--Z--PROJECT NUMBER 5650, Eufaula Lake, OK Latest Award Notice
RECOVERY--Z--PROJECT NUMBER 5650, Eufaula Lake, OK Award Notice
RECOVERY--Z--PROJECT NUMBER 510, Mcclellan-Kerr Arkansas River Navigation System, OK Award Notice
This notice Award Notice

4 of 7 notices listed here. See the rest on GovTribe.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors