RECOVERY--Z--PROJECT NUMBER 5650, Eufaula Lake, OK

Award Notice Posted

Solicitation number
W912BV-09-R-2024
Agency
Awarded
Set-aside
No set-aside

Opportunity facts

Contract number
W912BV-10-D-2021, TO 0002, 000208
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Downey Contracting, LLC, W912BV-10-D-2021, Task Order 0003, Multiple Award Task Order Contract (MATOC)

As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Downey Contracting, LLC, to perform the following work: 1. Delete All Double Bituminous Surface Treatment at Porum Landing and Brooken Cove. Estimated Quantities are as follows: a. Porum Landing- 16,231 SY. b. Brooken Cove - 16,157 SY. 2. Place a 2-inch Asphalt overlay on the entry road into Brooken Cove. This will start at the Government gate and extend to the intersection which leads to the Gate House. Estimated length of roadway is 7,022 feet with a road width of 23 feet. Estimated Quantity is 18,246 SY. Work shall consist of the following: a. Remove the grass and debris from cracks. Clean the road way of debris and rocks. When the road is clean, apply Penetrating Asphalt conditioner using a computerized rate controlled distributor truck.Place a Sand Seal which is a mixture of sand and screening on the surface. Work the aggregate into the cracks and small voids in the pavement. When the cracks and voids are filled to the surface, use a pneumatic tired roller to compress the material into the cracks and voids. After an appropriate set up time (one to two hours), remove the excess material form the road surface and apply a second application of Penetrating Asphalt Conditioner to the road surface. Allow a minimum of 4 hours to cure before allowing traffic. b. Place 2-inch asphalt overlay the entire length of roadway. c. Repair one area where the Eufuala office has installed a metal pipe across the Roadway. This will consist of 6-inch aggregate base course on the roadway where the pipe was installed. Approximately 18 SY. 3. At Brooken Cove exchange the CXT Arapahoe unit for the CXT Navajo unit. This will consist of the difference in cost of the buildings, Crane, and hook-up to utilities.

Update #2 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Downey Contracting, LLC., W912BV-10-D-2021, TO 0002, Mutiple Award Task Order Contracts (MATOC)

As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Downey Contracting, LLC., to perform the following work: Provide weld repairs to East and West Service Gate liners.

Update #1 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Downey Contracting, LLC., W912BV-10-D-2021, TO 0002, Multiple Award Task Order Contract (MATOC)

As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Downey Contracting, LLC., to perform the following work: Upon completion of the work at Elk City, the bulkhead shall be moved from the gate tower and stored at the Elk City Lake Project Office.

Notice history

4 of 7 notices listed here. See the rest on GovTribe.