RECOVERY--Z--PROJECT NUMBER 510, Mcclellan-Kerr Arkansas River Navigation System, OK
Award Notice Posted
- Solicitation number
- W912BV-09-R-2024
- Agency
-
ENDIST Tulsa
US Army Corps of Engineers, Department of Defense
- Awarded
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912BV-10-D-2021, Task Order 0002, 000203
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Downey Contracting, LLC, W912BV-10-D-2021, Task Order 0002, Multiple Award Task Order Contract (MATOC)
As part of Operations and Maintenance, Army, Recovery Act, this modification has beeen issued to Downey Contracting, LLC., to perform the following work: Bridge deck will be cut to provide a gap between the deck and abutments to allow for proper expansion of the end spans. To provide gap necessary for expansion, the steel angle shall be completely removed. Contractor shall remove 22 inches off each end of the bridge deck, including rebar, and the steel armor. These sections of the deck shall then be re-poured, along with placing new reinforcement to replace reinforcement removed. Dowels will be required longitudinally (parallel to centerline) for the bridge and shall match the size and spacing of existing reinforcement.
Update #3 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Downey Contracting, LLC., W912BV-10-D-2021, Task Order 0003, Multiple Award Task Order Contract (MATOC)
As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Downey Contracting, LLC., to extend the contract completion date as follows: This modification is issued to extend the contract completion date 4 calendar days for all work under Special Contract Requirements Clause "Commencement, Prosecution, and Completion of Work" as a result of delays caused by inclement weather in excess of the anticipated delays set forth in the Special Contract Requirements Clause "Time Extension for Unusually Severe Weather. These delays occurred during the period of June 28, 2010 through February 28, 2011, and were not due to any fault or negligence on the part of the contractor.
Update #2 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Downey Contracting, LLC, W912BV-10-D-2021, Task Order 0003, Multiple Award Task Order Contract (MATOC)
As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Downey Contracting, LLC., to perform the following work:
Contractor shall install a 6 foot chain link fence around the sewage lagoons at Porum Landing and Dam Site South in lieu of the 5 strand barbed wire fence required by the RFP.
Update #1 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Downey Contracting, LLC., W912BV-10-D-2021, Task Order 0002, Multiple Award Task Order Contract (MATOC)
As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Downey Contracting, LLC., to perform the following work: An adequate dive team will inspect and remove all debris from the East and West gate slots of the intake tower at Elk City Dam, Kansas. Duration of dive operations will not exceed two full working days. A mobile crane, utilizing an adequate crane placement plan, will mobilize to the intake tower bridge at Elk City Dam, Kansas to execute lifting of the bulkhead in order to assist dive operations. Duration of crane operations will not exceed one full working day.
Notice history
| Notice | Type | Posted |
|---|---|---|
| RECOVERY--Z--PROJECT NUMBER 5650, Eufaula Lake, OK | Award Notice | |
| RECOVERY--Z--PROJECT NUMBER 5650, Eufaula Lake, OK | Award Notice | |
| RECOVERY--Z--PROJECT NUMBER 510, Mcclellan-Kerr Arkansas River Navigation System, OK | Award Notice | |
| This notice | Award Notice |
4 of 7 notices listed here. See the rest on GovTribe.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity