RECOVERY--Y--Repairs to Gym #6-HVAC, Electric, Finishes, Doors, Windows, Etc - Fort Gordon, GA

Award Notice Posted

Solicitation number
W912HN-07-D-0032-DE-02501-8P
Agency
Awarded
to Native American Services Corp.
Set-aside
Competitive 8(a)

Opportunity facts

Contract number
W912HN-07-D-0032-0011 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Same as previous location Fort Gordon, Georgia, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to increase the chilled water supply and return piping, from 4" to 6", to Gym #6, Building 21713. It is to be piped from the existing mechanical room northeast towards 22nd Street connecting into exisiting 8" chilled water line.


Exercise the option to increase the existing 4" chilled water supply and return with a new 6" chilled water supply and return. The new 6" will be piped from Gym #6 mechanical room northeast towards 22nd Street and connects to the existing 8" chilled water loop located just north of the mechanical room for building 21717. This will supply the required chilled water flow to Gym #6 which will make the building 100% functional. Industry standing piping methods requires a 6" pipe to keep the velocities and pressure drops within an acceptable range.

Update #2 ·

RECOVERY--THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS ONLY EXTENDED TO THE EXISTING CONTRACTOR AWARDED CONTRACT W912HN-07-D-0032, NATIVE AMERICAN SERVICES CORP. This is not a solicitation. The Savannah District, U.S. Army Corps of Engineers has a requirement for a Request for Proposal development. It is the intent of the Government to award a task order on an existing Indefinitely Delivery Contract. The task order will be Firm Fixed Priced. The North American Industry Classification system (NAICS) is 236220: Size Standard is $33.5 Million.

PROJECT INFORMATION: The work shall consist of the following:

Repairing the Fort Gordon Gym # 6, Bldg 21713. The architectural work includes refurbishing doors, floors, entry passageway, windows, interior & exterior finishes, racquetball courts, cardio areas, locker rooms and restrooms. Also included in the project is the restoration of the existing indoor basketball court to its original design and to repaint surface of exterior basketball court. This project requires demolition of all existing windows, all existing interior and exterior doors, all existing lockers, existing basketball backboard, new HVAC equipment and piping, and some interior finishes. The existing front parking area will be enlarged to accommodate additional parking.


Storefront Window - Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to maintain existing window size on east wall of storefront.


Contract drawing sheet A-102 calls for a new type 'D' storefront window. Replace with existing window size.


1. Storefront Window:   User does not have a need for a larger window and instead has requested to maintain existing window size.


a) Demolish current wood floor and replace with new 3/8" X 48" wide rolls of rubber flooring.


b) Fur out existing west wall to cover all open conduits and electrical wiring.


c) Relocate the CATV outlet, sensor, fire alarm notifications (audio and visual), and receptacle currently on south wall.


d) South wall is not to be rebuilt to include door 118A.


Drawing No: A-102, E-102/103


CHANGE IN DRAWINGS:


a) Door 118A on sheet 14 is not to be installed.


b) South wall of room 118 on sheet 12 is not to be rebuilt.


c) Relocate sensor noted on sheet 39.


d) Relocate CATV outlet and receptacle on south wall (sheet 40.)


e) Relocate fire alarm notifications (audio and visual), sheet 40, currently on inside of south wall to the outside south wall of the mechanical room.


f) Relocate fire alarm notifications (audio and visual), sheet 40, currently on outside of south wall to the outside north wall of the racquetball court (room 105).


CHANGE IN SPECIFICATIONS


3. Corridor 113A


a) Install ceramic floor tiles in corridor 113A to match elevation of new rubber flooring in room 118.


b) Provide and install new transitions for entrance.


2. Exercise Room 118


User requested the exercise room to be an open space for air circulation instead of closing off the area with the door. User has requested to demolish wooden floor with rubber flooring for better long term maintenance.


3. Corridor 113A


User has requested new rubber flooring for room 118, therefore the corridor will have to match the height of the new floor.

Change # 1 (room 118 exercise room):


a) The current wood floor in room 118 is to be demolished.


b) Purchase and Install new 1/4" x 48" wide roll of rubber flooring (preferably Regupol Aktiv).


c) Fur out existing west wall to cover all open conduits and electrical wiring.


d) Relocate the CATV outlet and receptacle on south wall along with both fire alarm notifications.


e) The south wall was demolished due to safety issues and will not be replaced. It will now be an open space.


F) Delete door 118A.


Change # 2 (113A corridor):


a) Delete putting in a mud bed.


b) Maintain ceramic floor tiles.


c) Ceramic floor tile will match dimension of rubber flooring in room.


d) Ramps will be added to doors 105A, and 106A, along with emergency exit 113A and the transition from corridor 113.


Change # 3 (storefront window)


a) Maintain existing window size on east wall of the office.

Update #1 ·

RECOVERY--THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS ONLY EXTENDED TO THE EXISTING CONTRACTOR AWARDED CONTRACT W912HN-07-D-0032, NATIVE AMERICAN SERVICES CORP. This is not a solicitation. The Savannah District, U.S. Army Corps of Engineers has a requirement for a Request for Proposal development. It is the intent of the Government to award a task order on an existing Indefinitely Delivery Contract. The task order will be Firm Fixed Priced. The North American Industry Classification system (NAICS) is 236220: Size Standard is $33.5 Million.

PROJECT INFORMATION: The work shall consist of the following:

Repairing the Fort Gordon Gym # 6, Bldg 21713. The architectural work includes refurbishing doors, floors, entry passageway, windows, interior & exterior finishes, racquetball courts, cardio areas, locker rooms and restrooms. Also included in the project is the restoration of the existing indoor basketball court to its original design and to repaint surface of exterior basketball court. This project requires demolition of all existing windows, all existing interior and exterior doors, all existing lockers, existing basketball backboard, new HVAC equipment and piping, and some interior finishes. The existing front parking area will be enlarged to accommodate additional parking.