RECOVERY--Y--High Voltage Cable Replacement - Powerhouse - Thurman Dam

Award Notice Posted

Solicitation number
W912HN-07-D-0032-OPSH-09-11
Agency
Awarded
to Native American Services Corp.
Set-aside
Competitive 8(a)

Opportunity facts

Contract number
W912HN-07-D-0032-0012 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Powerhouse - Thurman Dam 384 Powerplant Road Clarkhill SC 29821 US

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Design & Acquisition Delays

Due to design and acquisition dates, the contractor cannot complete the project as contracted (360 calendar days) and request an extension of 125 calendar days at NO cost to the Government for a total of 485 calendar days.

The issues which were not anticipated, design and acquisition of materials, specifically the wire and the termination kits have increased the pre-shutdown phase of the project to 203 calendar days.

The shutdown phase cannot begin until all design and parts are in place.  This phase of the work is scheduled based on the assumption that the contractor can work continuously once the process has begun.

Update #2 ·

RECOVERY--THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS ONLY EXTENDED TO THE EXISTING CONTRACTOR AWARDED CONTRACT W9912HN-07-D-0032, NATIVE AMERICAN SERVICES CORP. This is not a solicitation. The Savannah District, U.S. Army Corps of Engineers has a requirement for a Request for Proposal development. It is the intent of the Government to award a task order on an existing Indefinitely Delivery Contract. The task order will be Firm Fixed Priced. The contractor's Data Universal Numbering System (DUNS) is 048530112, the North American Industry Classification System (NAICS) is 236220; size standard $33.5 million.PROJECT INFORMATION: The work shall consist of the following:

Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to remove four high voltage oil-filled 115kV cable systems and replace with four new extruded-dielectric enclosed 115kV cable systems at the J. Strom Thurmond Powerplant.

A. Remove Oil-Filled Cables and Pipe
B. New Cable Enclosures
C. New High Voltage Cables
D. Replace High Voltage Terminals
E. Remove Oil Pumping Equipment
F. Additional Optional Work Items

Optional items include
(1) Removal of the two abandoned oil-filled pipes, including oil, that run along the Power Tunnel;
(2) Removal of four abandoned and empty oil storage tanks (two 7,000 gallon and two 9,500 gallon) in the Oil Storage Room, EL. 205.0;
(3) Replacement of the existing concrete panels for the protective cover over the Cable Pipes on the Transformer Deck, EL 233.0 (the existing panels are deteriorating and the cover will be required to protect the new cable system enclosures from direct sunlight and falling objects);
(4) Removal of two abandoned 7-foot diameter reels of bare 1000kcmil cable, currently in storage on EL 188.0.

Update #1 ·

RECOVERY--THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS ONLY EXTENDED TO THE EXISTING CONTRACTOR AWARDED CONTRACT W9912HN-07-D-0032, NATIVE AMERICAN SERVICES CORP. This is not a solicitation. The Savannah District, U.S. Army Corps of Engineers has a requirement for a Request for Proposal development. It is the intent of the Government to award a task order on an existing Indefinitely Delivery Contract. The task order will be Firm Fixed Priced. The North American Industry Classification System (NAICS) is 236220: Size Standard is 33.5 Million.

PROJECT INFORMATION: The work shall consist of the following:

Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to remove four high voltage oil-filled 115kV cable systems and replace with four new extruded-dielectric enclosed 115kV cable systems at the J. Strom Thurmond Powerplant.

A. Remove Oil-Filled Cables and Pipe
B. New Cable Enclosures
C. New High Voltage Cables
D. Replace High Voltage Terminals
E. Remove Oil Pumping Equipment
F. Additional Optional Work Items

Optional items include
(1) Removal of the two abandoned oil-filled pipes, including oil, that run along the Power Tunnel;
(2) Removal of four abandoned and empty oil storage tanks (two 7,000 gallon and two 9,500 gallon) in the Oil Storage Room, EL. 205.0;
(3) Replacement of the existing concrete panels for the protective cover over the Cable Pipes on the Transformer Deck, EL 233.0 (the existing panels are deteriorating and the cover will be required to protect the new cable system enclosures from direct sunlight and falling objects);
(4) Removal of two abandoned 7-foot diameter reels of bare 1000kcmil cable, currently in storage on EL 188.0.