RECOVERY Whistle Stop Placer River Trail Bridge & Access
Awarded Award Notice Posted
- Solicitation number
- AG-0489-S-10-0428
- Agency
- Operations Center Northwest Economic Recovery Operations, Department of Agriculture
- Awarded
- to Patrick Albin Carlson Joint Venture, LLC
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- AG-0489-C-10-0399 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Chugach National Forest, Alaska, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Added: Aug 11, 2010 4:34 pm
FOUR PROPOSALS WERE RECEIVED FOR THIS RFP.
---------------------------------
Update #1 ·
Added: Apr 13, 2010 1:23 pm
THIS IS AN AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) PROCUREMENT.
The purpose of this announcement is to make notice that the Forest Service contemplates releasing a solicitation numbered AG-0489-S-10-0428 on or about April 27, 2010, for the RECOVERY Whistle Stop Placer River Trail Bridge & Access project. If the solicitation is released, it will be released through this FedBizOpps website, and prospective bidders should visit this FedBizOpps website from time to time on or after April 27, 2010 to obtain a copy of the solicitation. This notice meets the requirements of FAR 5.201. However, the Forest Service reserves the right not to release a solicitation.
PROJECT DESCRIPTION. This project is for the construction of the Placer River Trail Bridge and trail approaches. The intent of the contract is to provide for the complete design and construction of the project described in the contract. The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the investigation, design, fabrication, and construction of the project within limits of acceptable engineering practice with the drawings and specifications, and in accordance with the provisions of the contract.
The Government estimate is between $500,000 and $1,000,000.
PROJECT LOCATION. The project is located at the Spencer Whistle Stop along the Alaska Railroad between Portage and Moose Pass, Alaska. Approximate latitude and longitude at the east abutment of the trail bridge are 60 4150N and 149 03 08 W. The nearest full service city is Anchorage, Alaska. From Anchorage, it is approximately 40 miles by paved two lane highway to Portage. From Portage, it is approximately 10 miles by railroad to the Spencer Whistle Stop. The Spencer Whistle Stop includes a development with 2 shelters and a toilet near the railroad tracks on the east side of the railroad bridge over the Placer River. From this development, the bridge site is located approximately one half mile away along a gravel trail.
PARTICIPATION. This project is being issued under the Small Business Competitiveness Demonstration Program (FAR 19.10) which allows for Full and Open Competition.
FOR MORE INFORMATION. The point of contact for this acquisition is Tonya Rymer, (503) 668-1703 (Fax 503-668-1621), U. S. Forest Service, EROC Northwest, 16400 Champion Way, Sandy, OR 97055.
REGISTRATIONS. In order to receive any contract award, a vendor must be registered in the Central Contractor Registration (CCR) and Online Representations and Certifications Application (ORCA). To register a firm in the CCR system, visit http://www.bpn.gov or call 888.227.2423 or 269.961.5757. To register a firm in the ORCA system, visit http://www.bpn.gov.
The USDA is an equal opportunity provider and employer.
Attachments
| File | Type | Posted |
|---|---|---|
| AG-0489-S-10-0428_amend4.pdf | ||
| AG-0489-S-10-0428_amend3.pdf | ||
| AG-0489-S-10-0428_amend2.pdf | ||
| AG-0489-S-10-0428_amend1.pdf | ||
| AG-0489-S-10-0428_placer-bridge.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity