Recovery-Sauk Road Repair & Maintenance

Award Notice Posted

Solicitation number
AG-0489-S-10-0434
Agency
Awarded
to Fortune's Bulldozing & Grading, LLC
Set-aside
HUBZone

Opportunity facts

Contract number
AG-0489-C-10-0384 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Mt. Baker Ranger District 810 State Route 20 Sedro-Wooley, Washington 98284, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

None

Update #4 ·

Section I.12 - PAYMENT FOR MATERIALS DELIVERED OFF SITE has been added to the solkicitation (See attached).



Offers are required by 1500 hours, June 2, 2010 (Pacific Time).

Update #3 ·

Work on this project is now forcasted for award and completion in 2011. See attached Amendment #1 for details.



Contractors having submitted an offer prior to receiving this amendment may revise their offer based on this schedule change.



Davis-Bacon Wage Rates have also been updated and reflected on the attached.



Offers are required by 1500 hours, May 24, 2010 (Pacific Time).

Update #2 ·

Proposals are due by 1500 hours, May 14, 2010 with original bid bond.

Update #1 ·

This project is funded under the provisions of the American Recovery and Reinvestment Act of 2009 (ARRA).



This construction project will require bid bond at 20% of the offered price and peformance and payment bonds at 100% of the awarded price. All bonds must be in original form (no copies).



This project is a 100% HubZone set-aside. Offers must be registered in ORCA and CCR, and be certified as a HubZone contractor by the Small Business Administration.



The magnitude of construction for this project is estimated to be between $100,000.00 and $250,000.00. A negotiated, firm, fixed-price contract is contemplated.



Work includes but is not limited to the removal of culverts, installation of plastic culverts ranging from 18-inch to 60 in diameter. Installation of steel pipe arch culverts ranging from 73-inch span to 150-inch span. The project also includes culvert repairs, excavation & backfill, drainage excavation (ditches & stream channel restoration), riprap rock and stream channel rock placement, road reconditioning, aggregate surfacing, equipment rental, seeding and mulching, traffic control, sign fabrication and installation, and mobilization.



The project is located in Eastern Snohomish County. From I-5 at Arlington take State Route 530 east to the Town of Darrington Washington. In Darrington take the Mt Loop Hwy. south approximately 2.5 miles until you reach the National Forest boundary at mile marker 44.7. The Mt Loop Hwy becomes FSR 20. Continue south on FSR 20 to mile marker 37.8, Junction with FSR 49 and beginning of the project work on FSR 49. Or, from the town of Granite Falls, Washington , travel East on the Mountain Loop Highway ( County Road #7) to Barlow Pass at mile marker 31. The Mountain Loop Highway then becomes Forest Service FSR 20. Continue on FSR 20 to mile marker 37.8, Junction with FSR 49 and beginning of the project work on FSR 49. This Project is located in: T30N, R11E, Section 9.



The technical point of contact for this project is James Mitchell at (360) 854-2620 or e-mail at jbmitchell@fs.fed.us.



A solicitation package is expected to be posted to FBO within the next 15-30 calendar days.





Files

File Type Posted
SaukRd Amend 2.PDF PDF
SaukRd Wages Amend 1.doc DOC document
SaukRd signed Amend 1.pdf PDF
SaukRd PastPerfDataSheet.doc DOC document
SaukRd FireSupRqts.doc DOC document
SaukRoad RFP Pkg.doc DOC document
SaukRd Wage Rates.doc DOC document
SaukRd FP-03 TOC.doc DOC document
SaukRd Sup'l SpecsList.doc DOC document
SaukRd MapsDwgs Details SOW.pdf PDF
SaukRd SuppProjSpecs.doc DOC document
SaukRd SF-1442.pdf PDF
SaukRd Add'l Fire Measures.doc DOC document
Show all 13

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors