SaukRd FP-03 TOC.doc
DOC document 28 KB Posted
- Attached to
- Recovery-Sauk Road Repair & Maintenance
- Solicitation number
- AG-0489-S-10-0434
About this file
FP-03 Table of Contents
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SaukRd Amend 2.PDF | ||
| SaukRd Wages Amend 1.doc | DOC document | |
| SaukRd signed Amend 1.pdf | ||
| SaukRd SuppProjSpecs.doc | DOC document | |
| SaukRd Sup'l SpecsList.doc | DOC document | |
| SaukRd MapsDwgs Details SOW.pdf | ||
| SaukRd SF-1442.pdf | ||
| SaukRd Add'l Fire Measures.doc | DOC document | |
| SaukRd FireSupRqts.doc | DOC document | |
| SaukRd Wage Rates.doc | DOC document | |
| SaukRoad RFP Pkg.doc | DOC document | |
| SaukRd PastPerfDataSheet.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Recovery-Sauk Road Repair and Maintenance, Mt. Baker-Snoqualmie National Forest
FP-03 SPS
Table of Contents
Table of Contents
Preface
101 - Terms, Format, and Definitions
101.01 Terms, Format, and Definitions
101.03 Abbreviations.
101.04 Definitions.
101.04 Definitions.
102 - Bid, Award, and Execution of Contract
102.00 Bid, Award, and Execution of Contract
103 - Scope of Work
Deletions
104 - Control of Work
Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources.
105.02(a) Government-provided sources.
105.05 Use of Material Found in the Work.
106 - Acceptance of Work
106.01 Conformity with Contract Requirements.
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims.
107.06 Contractor’s Responsibility for Work.
107.08 Sanitation, Health, and Safety
107.09 Legal Relationship of the Parties.
107.10 Environmental Protection.
108 - Prosecution and Progress
108 Delete.
109 - Measurement and Payment
109 Deletions
109.02 Measurement Terms and Definitions.
151 - Mobilization
155 - Schedules for Construction Contracts
155 Delete.
156 - Public Traffic
157 - Soil Erosion Control
157.03 General.
157.08 Water Crossings.
201 - Clearing and Grubbing
201.02 Delete:
201.01 Description
201.04 Clearing. (c)
201.04 Clearing.
201.06 Disposal.
203 - Removal of Structures and Obstructions
203.01 Description.
203.04 Removing Material.
203.05 Disposing of Material.
204 - Excavation and Embankment
204.06 Roadway Excavation.
204.09 Preparing Foundation for Embankment Construction.
204.10 Embankment Construction.
204.11 Compaction.
204.13 Sloping, Shaping, and Finishing.
Table 204-2 Construction tolerances.
204.13 Sloping, Shaping, and Finishing.
204.14 Disposal of Unsuitable or Excess Material.
204.15 Acceptance
Table 204-1 Sampling and Testing Requirements.
208 - Structure Excavation and Backfill for Selected Major Structures
209 - Structure Excavation and Backfill
209.10 Backfill.
209.11 Compacting.
Table 209-1 Sampling and Testing Requirements
230 - Roadside Brushing
251 - Riprap
303 - Road Reconditioning
303.00 Road Reconditiong
322 - Minor Aggregate Courses
602 - Culverts and Drains
602.03 General.
607 - Cleaning, Reconditioning, and Repairing Existing Drainage Structures
607.06 Reconditioning Drainage Structures.
625 - Turf Establishment
625.03 General.
625.04 Preparing Seedbed.
625.05 Watering.
625.07 Seeding.
(a) Dry method. Delete the third sentence.
633 - Permanent Traffic Control
633.02 Material
635 - Temporay Traffic Control
648 - Stream Simulation
703 - Aggregate
703.05 Subbase, Base, Surface Course, and Screened Aggregate.
705 - Rock
705.08 Channel Rock
713 - Roadside Improvement Material
713.05 Mulch.
717 - Structural Metal
718 - Traffic Signing and Marking Material
718.02 Protective Overlay Film and Edge Film
Preface
Preface_wo_03_15_2004_m Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
File details come from the government source that posted it. Updated .