SaukRd FP-03 TOC.doc

DOC document 28 KB Posted

Attached to
Recovery-Sauk Road Repair & Maintenance
Solicitation number
AG-0489-S-10-0434
Issued by

About this file

FP-03 Table of Contents

View the file

Other files

File Type Posted
SaukRd Amend 2.PDF PDF
SaukRd Wages Amend 1.doc DOC document
SaukRd signed Amend 1.pdf PDF
SaukRd SuppProjSpecs.doc DOC document
SaukRd Sup'l SpecsList.doc DOC document
SaukRd MapsDwgs Details SOW.pdf PDF
SaukRd SF-1442.pdf PDF
SaukRd Add'l Fire Measures.doc DOC document
SaukRd FireSupRqts.doc DOC document
SaukRd Wage Rates.doc DOC document
SaukRoad RFP Pkg.doc DOC document
SaukRd PastPerfDataSheet.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Recovery-Sauk Road Repair and Maintenance, Mt. Baker-Snoqualmie National Forest

FP-03 SPS

Table of Contents

Table of Contents

Preface

101 - Terms, Format, and Definitions

101.01 Terms, Format, and Definitions

101.03 Abbreviations.

101.04 Definitions.

101.04 Definitions.

102 - Bid, Award, and Execution of Contract

102.00 Bid, Award, and Execution of Contract

103 - Scope of Work

Deletions

104 - Control of Work

Deletions

104.06 Use of Roads by Contractor

105 - Control of Material

105.02 Material Sources.

105.02(a) Government-provided sources.

105.05 Use of Material Found in the Work.

106 - Acceptance of Work

106.01 Conformity with Contract Requirements.

106.07 Delete

107 - Legal Relations and Responsibility to the Public

107.05 Responsibility for Damage Claims.

107.06 Contractor’s Responsibility for Work.

107.08 Sanitation, Health, and Safety

107.09 Legal Relationship of the Parties.

107.10 Environmental Protection.

108 - Prosecution and Progress

108 Delete.

109 - Measurement and Payment

109 Deletions

109.02 Measurement Terms and Definitions.

151 - Mobilization

155 - Schedules for Construction Contracts

155 Delete.

156 - Public Traffic

157 - Soil Erosion Control

157.03 General.

157.08 Water Crossings.

201 - Clearing and Grubbing

201.02 Delete:

201.01 Description

201.04 Clearing. (c)

201.04 Clearing.

201.06 Disposal.

203 - Removal of Structures and Obstructions

203.01 Description.

203.04 Removing Material.

203.05 Disposing of Material.

204 - Excavation and Embankment

204.06 Roadway Excavation.

204.09 Preparing Foundation for Embankment Construction.

204.10 Embankment Construction.

204.11 Compaction.

204.13 Sloping, Shaping, and Finishing.

Table 204-2 Construction tolerances.

204.13 Sloping, Shaping, and Finishing.

204.14 Disposal of Unsuitable or Excess Material.

204.15 Acceptance

Table 204-1 Sampling and Testing Requirements.

208 - Structure Excavation and Backfill for Selected Major Structures

209 - Structure Excavation and Backfill

209.10 Backfill.

209.11 Compacting.

Table 209-1 Sampling and Testing Requirements

230 - Roadside Brushing

251 - Riprap

303 - Road Reconditioning

303.00 Road Reconditiong

322 - Minor Aggregate Courses

602 - Culverts and Drains

602.03 General.

607 - Cleaning, Reconditioning, and Repairing Existing Drainage Structures

607.06 Reconditioning Drainage Structures.

625 - Turf Establishment

625.03 General.

625.04 Preparing Seedbed.

625.05 Watering.

625.07 Seeding.

(a) Dry method. Delete the third sentence.

633 - Permanent Traffic Control

633.02 Material

635 - Temporay Traffic Control

648 - Stream Simulation

703 - Aggregate

703.05 Subbase, Base, Surface Course, and Screened Aggregate.

705 - Rock

705.08 Channel Rock

713 - Roadside Improvement Material

713.05 Mulch.

717 - Structural Metal

718 - Traffic Signing and Marking Material

718.02 Protective Overlay Film and Edge Film

Preface

Preface_wo_03_15_2004_m Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

File details come from the government source that posted it. Updated .