Recovery - roman nose trail bridge replacement, idaho panhandle national forests, saics 237310, service code Z
Award Notice Posted
- Solicitation number
- AG-82B1-S-10-0110
- Agency
-
Operations Center Intermountain
Economic Recovery Operations, Department of Agriculture
- Awarded
- to Macnak Construction LLC
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- AG-82B1-C-10-0110 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Project Location: The Roman Nose Trail Bridge Replacement project can be reached by taking US Highway 95 North for approximately 21 miles to Naples and the south junction with the Deep Creek Loop Road. Turn Left onto the Deep Creek Loop and head North approximately 6.5 miles to the junction with the Lions Den Road. Turn west (left) onto Lions Den Road and continue West and North for approximately 2 miles until you cross the bridge over Snow Creek. Immediately after the bridge, turn left (Northwest) onto Forest Development Road (FDR) No. 402 (Snow Creek Road). Head West on FDR No. 402 for 10 miles to the Snow Lake trailhead. Stay left at the trailhead where the main road becomes FDR N0. 1007 (Caribou Pass Rd). Continue South and East for approximately 8 miles to Ruby Pass. Turn right (Southwest) onto FDR No. 2667 and continue 2 miles to the end of the road at the Roman Nose Trailhead. Coeur d'Alene, Idaho 83814, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Note that the bid bond required is 20% of the bid amount.
Update #2 ·
The Roman Nose Trail Bridge Replacement project includes the removal of the existing trail bridge structure and replacing it with a new steel Half-Through Pony Truss pedestrian bridge on concrete grade beams. Work will include design, fabrication, delivery and installation of the steel trail bridge superstructure, supplying and installing precast concrete grade beams, structural excavation, camping spur and trail crushed aggregate subbase material, parking lot and trail crushed aggregate surfacing, treated timber puncheon, bulletin board, site vegetation preservation, erosion control measures, minor equipment rental and all other incidental work items necessary to complete the project in accordance with the plans and specifications.
Update #1 ·
RECOVERY - THIS IS A PRE-SOLICITATION AND THE FINAL DUE DATE FOR BIDS WILL BE INDICATED IN THE SOLICITATION ; THE DUE DATE INDICATED ABOVE IS AN ESTIMATE FOR PLANNING PURPOSES ONLY.
PROJECT DESCRIPTION
The Roman Nose Trail Bridge Replacement project includes the removal of the existing trail bridge structure and replacing it with a new steel Half-Through Pony Truss pedestrian bridge on concrete grade beams. Work will include design, fabrication, delivery and installation of the steel trail bridge superstructure, supplying and installing precast concrete grade beams, structural excavation, camping spur and trail crushed aggregate subbase material, parking lot and trail crushed aggregate surfacing, treated timber puncheon, bulletin board, site vegetation preservation, erosion control measures, minor equipment rental and all other incidental work items necessary to complete the project in accordance with the plans and specifications.
Files
| File | Type | Posted |
|---|---|---|
| AG-82B1-S-10-0110.pdf | ||
| Amendment 005 S-10-0110.pdf | ||
| A-004 S-10-0110.pdf | ||
| ATTACHMENT TO AMENDMENT 003 TO AG.docx | DOCX document | |
| a-003 -S-10-0110.pdf | ||
| A-002 S-10-0110.pdf | ||
| A - 1 S-10-0110.pdf | ||
| db Idaho wage rates.txt | TXT text file | |
| S-10-0110 COVER PAGES.pdf | ||
| Roman Nose Trail Bridge Drawings.pdf | ||
| S-10-0110 Special Project Specifications.doc | DOC document | |
| Sect B thru L 10-0110 Rpman Nose.doc | DOC document |
Show all 12
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity