| File | Type | Posted |
|---|---|---|
| Amendment 005 S-10-0110.pdf | ||
| A-004 S-10-0110.pdf | ||
| ATTACHMENT TO AMENDMENT 003 TO AG.docx | DOCX document | |
| a-003 -S-10-0110.pdf | ||
| A-002 S-10-0110.pdf | ||
| A - 1 S-10-0110.pdf | ||
| Roman Nose Trail Bridge Drawings.pdf | ||
| S-10-0110 Special Project Specifications.doc | DOC document | |
| S-10-0110 COVER PAGES.pdf | ||
| Sect B thru L 10-0110 Rpman Nose.doc | DOC document | |
| db Idaho wage rates.txt | TXT text file |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA FOREST SERVICE Method of Advertising Solicitation Number: AG-82B1-S-10-0110
1. FedBizOpps Date Issue:
2. Advertised in Public Place Date Due:
Name of Project: Roman Nose Trail Bridge Replacement
Bonners Ferry Ranger District
Idaho Pandhandle National Forests
Boundary County, IDAHO
BID #1 BID #2 BID #3 BID #4 BID #5 BID #6 BID #7 BID #8 BID #9
KEY WAY CLINT KIMBALL FUEL TANK MAINT APEX MACNAK STONE RIDGE INTEGRITY EXC ALPINE LAWRENCE
B-1 SCHEDULE OF ITEMS Method Pay EST
ITEM NO DESCRIPTION of Meas Unit QTY Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total
202(05) Removal of Existing Trail Bridge Structure LSQ LS 1 1,500.00$ 1,500.00$ 2,500.00$ 2,500.00$ 34,246.58$ 34,246.58$ 1,520.00$ 1,520.00$ 1,750.00$ 5,784.00$ $5,784.00 2,610.00$ 2,610.00$ 1,560.00$ 1,560.00$ 3,675.00$ 3,675.00$ and Timber Puncheon
204(19) Soil Erosion and Pollution Control LSQ LS 1 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 10,273.97$ 10,273.97$ 1,200.00$ 1,200.00$ 560.00$ 4,700.00$ $4,700.00 1,370.00$ 1,370.00$ 500.00$ 500.00$ 3,150.00$ 3,150.00$
206(07) Structural Excavation LSQ LS 1 1,200.00$ 1,200.00$ 5,000.00$ 5,000.00$ $13,698.63 13,698.63$ 1,800.00$ 1,800.00$ 1,250.00$ 2,880.00$ $2,880.00 1,485.00$ 1,485.00$ 1,440.00$ 1,440.00$ 6,000.00$ 6,000.00$
260(01) Geocell Abutment DQ SY 9.33 200.00$ 1,866.00$ 120.00$ 1,119.60$ 273.97$ 2,556.14$ 200.00$ 1,866.00$ 620.00$ 120.05$ $1,120.07 61.10$ 570.06$ 200.00$ 1,866.00$ 168.81$ 1,575.00$
304(11)A Crushed Aggregate, Type Surfacing, Grading F or G AQ TON 10 140.00$ 1,400.00$ 75.00$ 750.00$ 136.99$ 1,369.90$ 46.00$ 460.00$ 450.00$ 109.50$ $1,095.00 87.50$ 875.00$ 57.00$ 570.00$ 205.00$ 2,050.00$
Compaction B- Trail (Commercial Source)
304(11)B Crushed Aggregate, Type Surfacing, Grading F or G AQ TON 110 70.00$ 7,700.00$ 34.50$ 3,795.00$ 47.95$ 5,274.50$ 36.00$ 3,960.00$ 2,975.00$ 60.15$ $6,616.50 34.65$ 3,811.50$ 32.00$ 3,520.00$ 45.00$ 4,950.00$
Compaction B- Parking Lot (Commercial Source)
301(11)C Crushed Aggregate, Type Subbase, Grading A, AQ TON 550 50.00$ 27,500.00$ 34.50$ 18,975.00$ 41.10$ 22,605.00$ 36.00$ 19,800.00$ 15,125.00$ 43.42$ $23,881.00 28.36$ 15,598.00$ 29.00$ 15,950.00$ 45.00$ 24,750.00$
Compaction B- Camping Spur (Commercial Source)
304(11)D Crushed Aggregate, Tpe Subbase, Grading A, AQ TON 35 65.00$ 2,275.00$ 65.00$ 2,275.00$ 136.99$ 4,794.65$ 36.00$ 1,260.00$ 1,020.00$ 61.10$ $2,138.50 62.45$ 2,185.75$ 38.00$ 1,330.00$ 85.00$ 2,975.00$
Compaction B- Trail (Commercial Source)
553A(01) Precast Concrete Member, Grade Beam AQ EA 2 1,500.00$ 3,000.00$ 1,500.00$ 3,000.00$ 4,109.59$ 8,219.18$ 2,700.00$ 5,400.00$ 2,800.00$ 7,565.00$ $15,130.00 2,700.00$ 5,400.00$ 2,300.00$ 4,600.00$ 2,000.00$ 4,000.00$
557(04) Treated Structural Timber and Lumber for Puncheo LSQ LS 1 8,500.00$ 8,500.00$ 8,500.00$ 8,500.00$ 13,698.63$ 13,698.63$ 9,000.00$ 9,000.00$ 3,100.00$ 16,380.00$ $16,380.00 5,450.00$ 5,450.00$ 7,452.00$ 7,452.00$ 5,000.00$ 5,000.00$
558(01) Prefabricated Bridge Superstructure - Design AQ EA 1 24,000.00$ 24,000.00$ 21,500.00$ 21,500.00$ 34,246.58$ 34,246.58$ 24,000.00$ 24,000.00$ 19,350.00$ 22,912.63$ $22,912.63 22,300.00$ 22,300.00$ 18,057.00$ 18,057.00$ 22,000.00$ 22,000.00$
601(01)A Mobilization LSQ LS 1 1,000.00$ 1,000.00$ 9,375.00$ 9,375.00$ 43,150.68$ 43,150.68$ 8,500.00$ 8,500.00$ 8,900.00$ 10,320.00$ $10,320.00 3,600.00$ 3,600.00$ 5,000.00$ 5,000.00$ 4,001.00$ 4,001.00$
625(02) Furnishing & Placing Topsoil (Commercial) AQ CY 40 70.00$ 2,800.00$ 65.00$ 2,600.00$ 68.49$ 2,739.60$ 60.00$ 2,400.00$ 2,500.00$ 108.55$ $4,342.00 92.12$ 3,684.80$ 48.00$ 1,920.00$ 110.00$ 4,400.00$
625(08) Seeding, Dry Method (with mulch) LS LSQ 1 850.00$ 850.00$ 500.00$ 500.00$ 6,849.32$ 6,849.32$ 1,100.00$ 1,100.00$ 1,670.00$ 600.00$ $600.00 470.00$ 470.00$ 1,200.00$ 1,200.00$ 3,700.00$ 3,700.00$
626(03) Site Vegetation Preservation, Remove, Preserve and AQ EA 10 110.00$ 1,100.00$ 150.00$ 1,500.00$ 1,027.40$ 10,274.00$ 300.00$ 3,000.00$ 1,250.00$ 167.60$ $1,676.00 140.00$ 1,400.00$ 50.00$ 500.00$ 320.00$ 3,200.00$
Transplant - Trees
633(18) Bulletin Board, 3 Panel LS LSQ 1 4,100.00$ 4,100.00$ 5,000.00$ 5,000.00$ 4,109.59$ 4,109.59$ 2,900.00$ 2,900.00$ 2,250.00$ 5,255.00$ $5,255.00 1,250.00$ 1,250.00$ 1,968.00$ 1,968.00$ 4,700.00$ 4,700.00$
637(01) Hydraulic Excavator with Thumb AQ HR 16 80.00$ 1,280.00$ 125.00$ 2,000.00$ 136.99$ 2,191.84$ 110.00$ 1,760.00$ 2,000.00$ 130.00$ $2,080.00 125.00$ 2,000.00$ 180.00$ 2,880.00$ 225.00$ 3,600.00$
637(02) Small Dozer AQ HR 16 90.00$ 1,440.00$ 115.00$ 1,840.00$ 136.99$ 2,191.84$ 105.00$ 1,680.00$ 1,500.00$ 110.00$ $1,760.00 125.00$ 2,000.00$ 180.00$ 2,880.00$ 250.00$ 4,000.00$
TOTAL AMOUNT OF EACH BID 92,511.00$ $91,229.60 222,490.63$ 91,606.00$ 69,070.00$ $128,670.70 76,060.11$ 73,193.00$ 107,726.00$
Acceptance Period
Bonds YES
Acknowledgement Of Amendments YES
CCR YES
ORCA YES
Excluded Parties List ONE
HubZone (Yes or No)
HubZone $