Recovery: road 1831 reconstruction, middle fork ranger district, willamette national forest, oregon
Award Notice Posted
- Solicitation number
- AG-0489-S-10-0288
- Agency
-
Operations Center Northwest
Economic Recovery Operations, Department of Agriculture
- Awarded
- to Johnson, Robert A
- Set-aside
- HUBZone
Opportunity facts
- Contract number
- AG0489C100226 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Willamette National Forest 3106 Pierce Pkwy, STE D Springfield, Oregon 97477, United States
Notice details come from SAM.gov. Updated .
Notice text
Description:
THIS IS AN AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (ARRA) PROCUREMENT.
The resulting contract will utilize funds provided by the AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) OF 2009. Interested parties are notified that the inclusion of unique provisions required in implementing the Act, including those for significant reporting and transparency, will be required of the successful bidder.
Work includes: Reconditioning of roadway, including ditches, culvert inlets and outlets; falling of danger trees; removal and/or placement of 18, 24, 30, 36 and 48-inch culverts; supply and placement of aggregate; repair of existing culverts.
***ESTIMATED ISSUE DATE OF SOLICITATION electronically in Federal Business Opportunities is March 5, 2010.*** The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications. Project area is located in Lane County on the Willamette National Forest. The Governments Estimate is between $100,000 and $250,000. The successful offeror shall be required to submit Performance and Payment Bonds (100%) prior to start of work. Contract time is 120 calendar days. This proposed procurement listed herein is set-aside for HUBZone firms in accordance with the Historically Underutilized Business Zone (HUBZone) Act of 1997. Estimated start work date is June 1, 2010. FOR ADDITIONAL INFORMATION, contact Mary Lee Sayre at 541-782-5357. PROPOSALS ARE DUE: APRIL 6, 2010
REGISTRATIONS. In order to receive any contract award, a vendor must be registered in the Central Contractor Registration (CCR) and Online Representations and Certifications Application (ORCA). To register a firm in the CCR system, visit http://www.bpn.gov or call 888-227-2423 or 269-961-5757. To register a firm in the ORCA system, visit http://www.bpn.gov.
Location: The project can be located as follows: From the town of Lowell, Oregon, travel north on the Lowell Jasper Road 3 miles to the Unity Bridge. Turn right on Big Fall Creek Road and travel 9.19 miles to the Forest Boundary and the road becomes Road 1800. Proceed 9.69 miles to the junction of 1831 on the left and the beginning of the project.
Files
| File | Type | Posted |
|---|---|---|
| Amendment1.pdf | ||
| 016-OR2.pdf | ||
| 013-R6-FS-6300-52 Fire Protection.pdf | ||
| 012-1831sups.pdf | ||
| 008-ReconstructionTypical.pdf | ||
| 009-DewateringTypical.pdf | ||
| 003-Estimate of Quanitities.pdf | ||
| 004-General Notes.pdf | ||
| 006-Culvert listing_c.pdf | ||
| 005-brushing.pdf | ||
| 015-R6-FS-6300-54 Communication.pdf | ||
| AG0489S100288.pdf | ||
| 007-DrainageTypicals.pdf | ||
| 014-R6-FS-6300-53 Tank Truck.pdf | ||
| 017-ContractorPerformanceDataSheet.doc | DOC document | |
| 002-1831 Vincinity Map.pdf | ||
| 001-1831 Cover.pdf | ||
| 010-Reconstruction Summaries.pdf | ||
| 011-1831SPECLISTwo.pdf |
Show all 19
Notice history
| Notice | Type | Posted |
|---|---|---|
| Recovery - hehe timber sale planning area road repairs | Award Notice | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity