010-Reconstruction Summaries.pdf
PDF 58 KB Posted
- Attached to
- RECOVERY: ROAD 1831 RECONSTRUCTION, MIDDLE FORK RANGER DISTRICT, WILLAMETTE NATIONAL FOREST, OREGON
- Solicitation number
- AG-0489-S-10-0288
About this file
RECONSTRUCTION SUMMARIES
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment1.pdf | ||
| AG0489S100288.pdf | ||
| 016-OR2.pdf | ||
| 013-R6-FS-6300-52 Fire Protection.pdf | ||
| 012-1831sups.pdf | ||
| 003-Estimate of Quanitities.pdf | ||
| 008-ReconstructionTypical.pdf | ||
| 004-General Notes.pdf | ||
| 006-Culvert listing_c.pdf | ||
| 005-brushing.pdf | ||
| 009-DewateringTypical.pdf | ||
| 015-R6-FS-6300-54 Communication.pdf | ||
| 002-1831 Vincinity Map.pdf | ||
| 007-DrainageTypicals.pdf | ||
| 011-1831SPECLISTwo.pdf | ||
| 017-ContractorPerformanceDataSheet.doc | DOC document | |
| 001-1831 Cover.pdf | ||
| 014-R6-FS-6300-53 Tank Truck.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROAD 1831 RECONSTRUCTION SUMMARY
Mile Point Pay Item Quantity Unit Work Description
0.00 Beginning of project. Junction Road 18.
20253 3 Each Fall 2 danger trees left and 1 opposite junction on Road 18.
23051 5.66 Mile Begin roadside brushing.
30359 5.66 Mile Begin reconditioning of roadbed. Grubbing & disposal of all vegetation and root masses within road bed and in the ditch is required unless otherwise noted in the work description.
Haul material from ditch reestablishment, drainage cleaning, slough & slide removal to disposal areas.
0.04 End of asphalt.
30359 Begin scarifying aggregate surface. Scarify to the depth of the aggregate surface or to the depth of 8", whichever is less, and remove surface irregularities.
0.06 20358 1 Each Remove existing CMP.
60276A 28 Foot Install 18" CMP. Raise installation 1'.
32203 10 C.Y. Place 8" crushed aggregate over installed culvert. Blend to adjacent road surfaces to provide a smooth transition. See sheet 9.
0.07 20253 1 Each Fall danger tree right.
0.22 20253 1 Each Fall danger tree right.
0.24 20253 2 Each Fall danger trees left.
0.26 20253 2 Each Fall danger trees right.
0.52 20253 5 Each Fall 3 danger trees right and 2 left.
0.62 20253 4 Each Fall 1 danger tree right and 3 left.
0.64 20253 1 Each Fall danger tree left.
0.70 20253 1 Each Fall danger tree left.
0.84 15755A 1 Each Dewater stream.
20358 1 Each Remove existing CMP.
60276D 52 Foot Install 36" CMP.
32203 19 C.Y. Place 8" crushed aggregate full depth for 40 feet centered over installed culvert with 15 foot tapers on each end and a 12' top width. Blend to adjacent road surfaces to provide smooth transition.
25101 14 C.Y. Construct energy dissipator, 10' L x 6' W x 6' D.
1.00 20253 2 Each Fall danger trees left.
1.05 20253 1 Each Fall danger tree left.
1.25 20253 1 Each Fall danger tree right.
AG-0489-S-10-0288
Willamette National Forest Middle Fork RD Road 1831
1.48 20253 1 Each Fall danger tree right.
1.63 15755B 1 Each Dewater stream.
20453A 1 Each Remove and replace fill. Removal and disposal of existing culvert and required clearing are indirect to 20453A. Dispose of culvert according to subsection 203.05, method a. Logs meeting utilization standards or suitable for firewood shall be limbed, separated and decked adjacent to the work area. See section 201. Dispose of slash according to subsection 203.05, disposal methods f, g or l.
60276E 46 Foot Install 48" CMP.
32203 19 C.Y. Place 8" crushed aggregate full depth for 40 feet centered over installed culvert with 15 foot tapers on each end and a 12' top width. Blend to adjacent road surfaces to provide smooth transition.
1.78 15755A 1 Each Dewater stream.
20358 1 Each Remove existing CMP.
60276B 30 Foot Install 24" CMP. Raise installation 1'.
32203 10 C.Y. Place 8" crushed aggregate over installed culvert. Blend to adjacent road surfaces to provide a smooth transition. See sheet 9.
1.91 15755A 1 Each Dewater stream.
20358 1 Each Remove existing CMP.
60276C 36 Foot Install 30" CMP. Raise installation 1'. Raise catch basin to new installation elevation with borrow from slide material removed at mp 5.04. Work is indirect to 60276C.
32203 15 C.Y. Place 8" crushed aggregate full depth for 30 feet centered over installed culvert with 15 foot tapers on each end and a 12' top width. Blend to adjacent road surfaces to provide smooth transition.
1.96 15755A 1 Each Dewater stream.
20453A 1 Each Remove and replace fill. Removal and disposal of existing culvert and required clearing are indirect to 20453A. Dispose of culvert according to subsection 203.05, method a. Logs meeting utilization standards or suitable for firewood shall be limbed, separated and decked adjacent to the work area. See section 201. Dispose of slash according to subsection 203.05, disposal methods f, g or l.
60276BB 36 Foot Install 24" CMP.
32203 15 C.Y. Place 8" crushed aggregate full depth for 30 feet centered over installed culvert with 15 foot tapers on each end and a 12' top width. Blend to adjacent road surfaces to provide smooth transition.
2.05 20419 20 Foot Reconstruct outlet ditch.
2.16 Pernot Creek, water source.
End scarifying aggregate surface.
AG-0489-S-10-0288
Willamette National Forest
2.46 Junction Road 1831387 right.
2.53 15755B 1 Each Dewater stream.
20453B 1 Each Remove and replace fill. Removal and disposal of existing culvert and required clearing are indirect to 20453B. Dispose of culvert according to subsection 203.05, method a. Logs meeting utilization standards or suitable for firewood shall be limbed, separated and decked adjacent to the work area. See section
201. Dispose of slash according to subsection 203.05, disposal
60276E 86 Foot Install 48" CMP.
32203 29 C.Y. Place 8" crushed aggregate full depth for 70 feet centered over installed culvert with 15 foot tapers on each end and a 12' top width. Blend to adjacent road surfaces to provide smooth transition.
2.58 20253 1 Each Fall danger tree left.
2.88 20253 3 Each Fall danger 2 trees right and 1 left.
2.98 Junction 1831386 left.
3.17 15755A 1 Each Dewater stream.
20453B 1 Each Remove and replace fill. Removal and disposal of existing culvert and required clearing are indirect to 20453B. Dispose of culvert according to subsection 203.05, method a. Logs meeting utilization standards or suitable for firewood shall be limbed, separated and decked adjacent to the work area. See section
201. Dispose of slash according to subsection 203.05, disposal methods f, g or l.
60276E 96 Foot Install 48" CMP.
32203 46 C.Y. Place 8" crushed aggregate full depth for 80 feet centered over installed culvert with 15 foot tapers on each end and a 18' top width. Blend to adjacent road surfaces to provide smooth transition.
3.25 20419 15 Foot Reconstruct outlet ditch.
3.27 Junction 1831383 left.
3.46 Disposal area right.
3.53 20453A 1 Each Remove and replace fill. Removal and disposal of existing culvert and required clearing are indirect to 20453A. Dispose of culvert according to subsection 203.05, method a. Logs meeting utilization standards or suitable for firewood shall be limbed, separated and decked adjacent to the work area. See section 201. Dispose of slash according to subsection 203.05, disposal methods f, g or l.
60276BB 42 Foot Install 24" CMP.
AG-0489-S-10-0288
Willamette National Forest
3.53 32203 21 C.Y. Place 8" crushed aggregate full depth for 40 feet centered over installed culvert with 15 foot tapers on each end and a 14' top width. Blend to adjacent road surfaces to provide smooth transition.
3.64 20253 1 Each Fall danger tree right.
3.66 20358 1 Each Remove existing CMP.
60276A 22 Foot Install new 18" CMP.
32203 10 C.Y. Place 8" crushed aggregate over installed culvert. Blend to adjacent road surfaces to provide a smooth transition. See sheet 9.
3.87 Disposal area left.
3.98 15755A 1 Each Dewater stream.
20453A 1 Each Remove and replace fill. Removal and disposal of existing culvert and required clearing are indirect to 20453A. Dispose of culvert according to subsection 203.05, method a. Logs meeting utilization standards or suitable for firewood shall be limbed, separated and decked adjacent to the work area. See section 201. Dispose of slash according to subsection 203.05, disposal methods f, g or l.
60276BB 38 Foot Install 24" CMP.
32203 21 C.Y. Place 8" crushed aggregate full depth for 40 feet centered over installed culvert with 15 foot tapers on each end and a 14' top width. Blend to adjacent road surfaces to provide smooth transition.
3.99 15755A 1 Each Dewater stream.
20453A 1 Each Remove and replace fill. Removal and disposal of existing culvert and required clearing are indirect to 20453A. Dispose of culvert according to subsection 203.05, method a. Logs meeting utilization standards or suitable for firewood shall be limbed, separated and decked adjacent to the work area. See section 201. Dispose of slash according to subsection 203.05, disposal methods f, g or l.
60276BB 38 Foot Install 24" CMP.
32203 21 C.Y. Place 8" crushed aggregate full depth for 40 feet centered over installed culvert with 15 foot tapers on each end and a 14' top width. Blend to adjacent road surfaces to provide smooth transition.
4.22 Junction 1831349 left.
4.30 20358 1 Each Remove existing CMP.
60276A 36 Foot Install 18" CMP.
32203 10 C.Y. Place 8" crushed aggregate over installed culvert. Blend to adjacent road surfaces to provide a smooth transition. See sheet 9.
AG-0489-S-10-0288
Willamette National Forest
4.38 20464 1 Lump Sum
Excavate 4' x 4' x 5' hole in the roadway and backfill with borrow from slide material removed at mp 5.04.
4.48 15755A 1 Each Dewater stream.
20358 1 Each Remove existing CMP.
60276B 42 Foot Install 24" CMP.
32203 10 C.Y. Place 8" crushed aggregate over installed culvert. Blend to adjacent road surfaces to provide a smooth transition. See sheet 9.
20419 10 Foot Reconstruct outlet ditch.
4.62 Junction Road 1831382 left.
4.66 20453A 1 Each Remove and replace fill. Removal and disposal of existing culvert and required clearing are indirect to 20453A. Dispose of culvert according to subsection 203.05, method a. Logs meeting utilization standards or suitable for firewood shall be limbed, separated and decked adjacent to the work area. See section 201. Dispose of slash according to subsection 203.05, disposal methods f, g or l.
60276BB 48 Foot Install 24" CMP.
32203 15 C.Y. Place 8" crushed aggregate full depth for 30 feet centered over installed culvert with 15 foot tapers on each end and a 12' top width. Blend to adjacent road surfaces to provide smooth transition.
4.77 20253 2 Each Fall danger trees left.
4.85 20253 2 Each Fall danger trees left.
4.87 20253 2 Each Fall danger trees left.
4.89 20358 1 Each Remove existing CMP.
60276A 22 Foot Install 18" CMP.
32203 10 C.Y. Place 8" crushed aggregate over installed culvert. Blend to adjacent road surfaces to provide a smooth transition. See sheet 9.
5.20 20358 1 Each Remove existing CMP.
60276A 22 Foot Install 18" CMP.
32203 10 C.Y. Place 8" crushed aggregate over installed culvert. Blend to adjacent road surfaces to provide a smooth transition. See sheet 8.
5.47 20253 2 Each Fall danger trees right.
5.54 20253 1 Each Fall danger tree left.
5.65 20419 30 Foot Reconstruct outlet ditch.
5.66 Junction Road 1831381, right. End of all work items.
AG-0489-S-10-0288
Willamette National Forest
ROAD 1831 RECONSTRUCTION SUMMARY OPTIONAL ITEMS
0.00 Beginning of project. Junction Road 18.
0.01 20358 1 Each Remove existing CMP.
20359 23 S. Y Saw cut and remove existing asphalt, 60276A 28 Foot Install 18" CMP.
32203 4 C.Y. Place 6" crushed aggregate over installed culvert.
41701 4.73 Ton Place 4" cold asphalt mix.
0.04 End of asphalt.
0.18 20358 1 Each Remove existing CMP.
60276B 42 Foot Install 24" CMP.
32203 19 C.Y. Place 8" crushed aggregate full depth for 40 feet centered over installed culvert with 15 foot tapers on each end and a 12' top width. Blend to adjacent road surfaces to provide smooth transition.
1.44 20358 1 Each Remove existing CMP.
60276A 36 Foot Install 18" CMP.
32203 15 C.Y. Place 8" crushed aggregate full depth for 30 feet centered over installed culvert with 15 foot tapers on each end and a 12' top width. Blend to adjacent road surfaces to provide smooth transition.
2.16 Pernot Creek, water source.
2.35 60791 1 Each Jack out inlet.
2.46 Junction Road 1831387 right.
2.88 20358 1 Each Remove existing CMP.
60276A 34 Foot Install 18" CMP.
32203 10 C.Y. Place 8" crushed aggregate over installed culvert. Blend to adjacent road surfaces to provide a smooth transition. See sheet 9.
20419 20 Foot Reconstruct outlet ditch.
2.98 Junction 1831386 left.
3.27 Junction 1831383 left.
3.46 Disposal area right.
4.22 Junction 1831349 left.
4.41 15755 1 Each Dewater stream.
20358 1 Each Remove existing CMP.
AG-0489-S-10-0288
Willamette National Forest
ROAD 1831 RECONSTRUCTION SUMMARY OPTIONAL ITEMS
60276B 42 Foot Install 24" CMP.
32203 15 C.Y. Place 8" crushed aggregate full depth for 30 feet centered over installed culvert with 15 foot tapers on each end and a 12' top width. Blend to adjacent road surfaces to provide smooth transition.
4.45 15755 1 Each Dewater stream.
20358 1 Each Remove existing CMP.
60277 42 Foot Install 28" span x 20" rise pipe arch.
32203 10 C.Y. Place 8" crushed aggregate over installed culvert. Blend to adjacent road surfaces to provide a smooth transition. See sheet 9.
4.62 Junction Road 1831382 left.
5.66 Junction Road 1831381, right. End of project.
AG-0489-S-10-0288
Willamette National Forest
| Recon 1831 |
| Recon op drain |
File details come from the government source that posted it. Updated .