Recovery - RML Building 7 Renovation

Award Notice Posted

Solicitation number
NIHOF2009130
Agency
Awarded
to Jackson Contractor Group Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
HHSN292201000006C Federal IDV award
PSC
Not on record
Place of performance
903 S. 4th Street Hamilton, Montana 59840, United States

Notice details come from SAM.gov. Updated .

Notice text

"Recovery" - RML Building 7 Renovation
This Project is funded by the American Recovery and Reinvestment Act of 2009. The magnitude of this project is estimated between $ 1 Million and $5 Million. The Building 7 project, located at the National Institutes of Health's (NIH) Rocky Mountain Laboratories (RML) in Hamilton, MT, consists of the renovation of an existing defunct boiler plant two stories high with a portion of the building a single open bay. The renovation includes demolition and construction of new floor space to infill partial floors and to connect to an adjacent building. The existing floor space is approximately 4,680 ft2, while the renovated floor space will be approximately 7,480 ft2.
A significant amount of demolition is required, including removal of 3 boilers with support tanks, piping, and catwalks. There are some existing asbestos containing material and lead based paint. Structural upgrades to meet seismic requirements are included. The Building 7 structure is a combination of steel, concrete and brick, with extensive interior and exterior brick. Existing exterior brickwork will have to be matched for infill. Several central utilities are located in, or pass through Building 7 and these must be kept active during demolition and construction and located in their final locations with only minimal interruptions in service. These services includes, steam, condensate, compressed air, vacuum system, and electrical power.
The existing large windows will be replaced. The heating and cooling system will consist of 100% outside air supply air handler units and exhaust fans with building automation system. The building will be fully commissioned and receive LEED certification. The building electrical system will be renovated. The buildings will have fire alarm systems and fire sprinkler systems. The primary purpose of the building is to serve as research laboratory.


The solicitation for this requirement will be posted on or about 1 July 2009.

Files

File Type Posted
sf30 Amendment 02 to NIHOF2009130.pdf PDF
B7 Bid Amendment 2.pdf PDF
Amendment 1 080309.pdf PDF
sf30 Amendment 01 to NIHOF2009130.pdf PDF
CD2.pdf PDF
M0.1.pdf PDF
M4.4.pdf PDF
M1.3.pdf PDF
E2.1.pdf PDF
M2.3.pdf PDF
2 2 scorecard preliminary review 6.25.09.pdf PDF
CD1.pdf PDF
CD3.pdf PDF
Standard Form 25.pdf PDF
Standard Form 24.pdf PDF
!BLDG 7 DRAWINGS 71-80 of 90.pdf PDF
!BLDG 7 DRAWINGS 31-40 of 90.pdf PDF
!BLDG 7 DRAWINGS 01-10 of 90.pdf PDF
!BLDG 7 DRAWINGS 41-50 of 90.pdf PDF
!BLDG 7 DRAWINGS 61-62 of 90.pdf PDF
!BLDG 7 DRAWINGS 63-70 of 90.pdf PDF
!BLDG 7 DRAWINGS 11-20 of 90.pdf PDF
BLDG 7 SPECIFICATIONS.pdf PDF
!BLDG 7 DRAWINGS 83-90 of 90.pdf PDF
Davis Bacon Wage Determination_dvb.mht MHT file
!BLDG 7 DRAWINGS 51-60 of 90.pdf PDF
SF 1442 Solicitation.pdf PDF
RFP NIHOF2009130.pdf PDF
Standard Form 25a.pdf PDF
!BLDG 7 DRAWINGS 21-30 of 90.pdf PDF
!BLDG 7 DRAWINGS 81-82 of 90.pdf PDF
Show all 31

Notice history

Notice Type Posted
Bldg. 7 Renovation Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity