2 2 scorecard preliminary review 6.25.09.pdf
PDF 30 KB Posted
- Attached to
- Recovery - RML Building 7 Renovation
- Solicitation number
- NIHOF2009130
About this file
Scorecard
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEED for New Construction v2.2 Registered Project Checklist
Yes ? No
8 3 3 Sustainable Sites 14 Points
Y Prereq 1 Construction Activity Pollution Prevention Required 1 Credit 1 Site Selection 1 1 Credit 2 Development Density & Community Connectivity 1
1 Credit 3 Brownfield Redevelopment 1 1 Credit 4.1 Alternative Transportation, Public Transportation Access 1
1 Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms 1 1 Credit 4.3 Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles 1 1 Credit 4.4 Alternative Transportation, Parking Capacity 1
1 Credit 5.1 Site Development, Protect of Restore Habitat 1 1 Credit 5.2 Site Development, Maximize Open Space 1
1 Credit 6.1 Stormwater Design, Quantity Control 1 1 Credit 6.2 Stormwater Design, Quality Control 1
1 Credit 7.1 Heat Island Effect, Non-Roof 1 1 Credit 7.2 Heat Island Effect, Roof 1
1 Credit 8 Light Pollution Reduction 1 Yes ? No
3 2 Water Efficiency 5 Points
1 Credit 1.1 Water Efficient Landscaping, Reduce by 50% 1 1 Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation 1
1 Credit 2 Innovative Wastewater Technologies 1 1 Credit 3.1 Water Use Reduction, 20% Reduction 1
1 Credit 3.2 Water Use Reduction, 30% Reduction 1
10 1 2 Energy & Atmosphere 17 Points
Y Prereq 1 Fundamental Commissioning of the Building Energy Systems Required Y Prereq 2 Minimum Energy Performance Required Y Prereq 3 Fundamental Refrigerant Management Required 8 Credit 1 Optimize Energy Performance 1 to 10
10.5% New Buildings or 3.5% Existing Building Renovations 1 14% New Buildings or 7% Existing Building Renovations 2 17.5% New Buildings or 10.5% Existing Building Renovations 3 21% New Buildings or 14% Existing Building Renovations 4 24.5% New Buildings or 17.5% Existing Building Renovations 5 28% New Buildings or 21% Existing Building Renovations 6 31.5% New Buildings or 24.5% Existing Building Renovations 7 8 35% New Buildings or 28% Existing Building Renovations 8 38.5% New Buildings or 31.5% Existing Building Renovations 9 42% New Buildings or 35% Existing Building Renovations 10
1 Credit 2 On-Site Renewable Energy 1 to 3 2.5% Renewable Energy 1 7.5% Renewable Energy 2 12.5% Renewable Energy 3
1 Credit 3 Enhanced Commissioning 1 1 Credit 4 Enhanced Refrigerant Management 1
1 Credit 5 Measurement & Verification 1 1 Credit 6 Green Power 1 continued…
Project Name: Building 7, Rocky Mountain Laboratories Project Address: Hamilton, Montana
Yes ? No
7 3 3 Materials & Resources 13 Points
Y Prereq 1 Storage & Collection of Recyclables Required 1 Credit 1.1 Building Reuse, Maintain 75% of Existing Walls, Floors & Roof 1 1 Credit 1.2 Building Reuse, Maintain 100% of Existing Walls, Floors & Roof 1
1 Credit 1.3 Building Reuse, Maintain 50% of Interior Non-Structural Elements 1 1 Credit 2.1 Construction Waste Management, Divert 50% from Disposal 1 1 Credit 2.2 Construction Waste Management, Divert 75% from Disposal 1
1 Credit 3.1 Materials Reuse, 5% 1 1 Credit 3.2 Materials Reuse,10% 1
1 Credit 4.1 Recycled Content, 10% (post-consumer + ½ pre-consumer) 1 1 Credit 4.2 Recycled Content, 20% (post-consumer + ½ pre-consumer) 1
1 Credit 5.1 Regional Materials, 10% Extracted, Processed & Manufactured Regio 1 1 Credit 5.2 Regional Materials, 20% Extracted, Processed & Manufactured Regio 1 1 Credit 6 Rapidly Renewable Materials 1
1 Credit 7 Certified Wood 1 Yes ? No
9 5 1 Indoor Environmental Quality 15 Points
Y Prereq 1 Minimum IAQ Performance Required Y Prereq 2 Environmental Tobacco Smoke (ETS) Control Required 1 Credit 1 Outdoor Air Delivery Monitoring 1
1 Credit 2 Increased Ventilation 1 1 Credit 3.1 Construction IAQ Management Plan, During Construction 1 1 Credit 3.2 Construction IAQ Management Plan, Before Occupancy 1 1 Credit 4.1 Low-Emitting Materials, Adhesives & Sealants 1 1 Credit 4.2 Low-Emitting Materials, Paints & Coatings 1 1 Credit 4.3 Low-Emitting Materials, Carpet Systems 1
1 Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products 1 1 Credit 5 Indoor Chemical & Pollutant Source Control 1
1 Credit 6.1 Controllability of Systems, Lighting 1 1 Credit 6.2 Controllability of Systems, Thermal Comfort 1
1 Credit 7.1 Thermal Comfort, Design 1 1 Credit 7.2 Thermal Comfort, Verification 1
1 Credit 8.1 Daylight & Views, Daylight 75% of Spaces 1 1 Credit 8.2 Daylight & Views, Views for 90% of Spaces 1
Yes ? No
2 3 Innovation & Design Process 5 Points
1 Credit 1.1 Innovation In Design--Commissioning Fume Hoods 1
1 Credit 1.2 Innovation In Design--LCCA 1
1 Credit 1.3 Innovation In Design--TBD 1 1 Credit 1.4 Innovation In Design--TBD 1
1 Credit 2 LEED® Accredited Professional 1 Yes ? No
39 15 11 Project Totals (pre-certification estimates) 69 Points Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 po
File details come from the government source that posted it. Updated .