M2.3.pdf
PDF 686 KB Posted
- Attached to
- Recovery - RML Building 7 Renovation
- Solicitation number
- NIHOF2009130
About this file
M2.3
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING A: MECHANICAL PLAN
SCALE: 1/4"=1’−0"
OFFICE
COMPUTER
LAB
STAIR
EQUIPMENT
PARTIAL UPPER LEVEL PLAN
SCALE: 1/4"=1’−0"
PUMP / CONVERTOR ELEVATION
NO SCALE
CONVERTER PIPING DIAGRAM
NO SCALE
MECHANICAL CHASE PLAN
SCALE: 1/4"=1’−0"
SPECIFIC NOTES:
RELOCATED FAN COIL UNIT. INSTALL NEW
SUPPORTS OR EXTEND EXISTING. EXTEND
CHILLED WATER SUPPLY AND RETURN PIPING
TO NEW LOCATION AND ATTACH TO UNIT.
EXISTING HEATING WATER PUMP. RECONNECT
TO HEATING WATER PIPING. EXISTING VALVES
AND PIPING ARRANGEMENT MAY BE UTILIZED.
RELOCATED HEATING WATER PUMP WITH NEW
CONCRETE HOUSEKEEPING PAD.
RELOCATED EXPANSION TANK WITH 3/4" LINE TO
AIR SEPARATOR. EXTEND EXISTING MAKEUP
WATER FEED LINE (NOT SHOWN) TO NEW AIR
SEPARATOR LOCATION.
RELOCATED POT FEEDER.
UP TO AIR SEPARATOR ABOVE.
CONDENSATE RETURNS UP TO CONVERTORS
ABOVE.
STEEL SUPPORT STAND FOR CONVERTORS.
CONSTRUCT SIMILARLY TO DETAIL 6, SHEET
M4.1. FIELD LOCATE COLUMNS AS REQUIRED
TO AVOID OBSTACLES AND EQUIPMENT.
REUSE AND REINSTALL EXISTING FLEX
CONNECTORS, VALVES, STRAINER, GAUGES,
AND DIFFERENTIAL PRESSURE SWITCHES ON
PUMP RISERS OR REPLACE WITH NEW.
RELOCATE AND REARRANGE EXISTING STEAM
SUPPLY ASSEMBLIES SERVING CONVERTORS.
REPLACE COMPONENTS NOT REUSED.
ROUTE VACUUM SYSTEM EXHAUST UP
THROUGH GLASSWASH CHASE AND OUT
THROUGH ROOF. SEE DETAIL 5/M2.3.
BUILDING A:
PROVIDE CONCRETE PAD EXTENSION OF
EXISTING CONCRETE PAD FOR NEW
CONDENSATE PUMPING TRAP.
EXTEND EXISTING DOMESTIC WATER HEATERS
CONDENSATE TRAP LINES TO PT−A.2.
REV
DATE
CIVIL:
REVIEWED BY:
STRUCTURAL:
ELECTRICAL:
MECHANICAL:
ARCHITECTURAL:
HAMILTON, MONTANA
SHEET OF 90
DATE
06/19/09
31 30
A
5 3
13B23
M2.3
MECHANICAL PLAN
BUILDING A:
GENERAL NOTES:
HEAVY LINES REPRESENT NEW WORK WHILE
LIGHTER LINES REPRESENT EXISTING PIPING AND
EQUIPMENT.
THE CONTRACTOR SHALL PROVIDE MECHANICAL
INSULATION AS NOTED ON THIS SHEET FOR EXISTING
PIPING SYSTEMS AND EQUIPMENT. ALL INSULATION
SHALL COMPLY WITH SPECIFICATION SECTION 15250.
REMOVABLE PADS SHALL BE USED FOR ALL STEAM
TRAPS, VALVES AND STRAINER ASSEMBLIES UNLESS
SPECIFICALLY NOTED OTHERWISE. USE SPECIFIED
INSULATION THICKNESS FOR EACH SYSTEM UNLESS
OTHERWISE SPECIFICALLY NOTED. FIELD VERIFY ALL
PIPING AND EQUIPMENT SIZES.
FABRICATE AND PAINT ANY AND ALL NEW PIPE
SUPPORTS TO MATCH THE EXISTING SUPPORTS
USED IN THIS BUILDING.
| 206M23C5.dwg |
| M2.3 |
File details come from the government source that posted it. Updated .