M2.3.pdf

PDF 686 KB Posted

Attached to
Recovery - RML Building 7 Renovation
Solicitation number
NIHOF2009130
Issued by

About this file

M2.3

View the file

Other files

File Type Posted
B7 Bid Amendment 2.pdf PDF
sf30 Amendment 02 to NIHOF2009130.pdf PDF
CD3.pdf PDF
E2.1.pdf PDF
Amendment 1 080309.pdf PDF
sf30 Amendment 01 to NIHOF2009130.pdf PDF
M4.4.pdf PDF
CD2.pdf PDF
M0.1.pdf PDF
M1.3.pdf PDF
CD1.pdf PDF
2 2 scorecard preliminary review 6.25.09.pdf PDF
!BLDG 7 DRAWINGS 63-70 of 90.pdf PDF
!BLDG 7 DRAWINGS 71-80 of 90.pdf PDF
!BLDG 7 DRAWINGS 31-40 of 90.pdf PDF
!BLDG 7 DRAWINGS 01-10 of 90.pdf PDF
!BLDG 7 DRAWINGS 41-50 of 90.pdf PDF
!BLDG 7 DRAWINGS 61-62 of 90.pdf PDF
Standard Form 25.pdf PDF
Standard Form 24.pdf PDF
!BLDG 7 DRAWINGS 11-20 of 90.pdf PDF
BLDG 7 SPECIFICATIONS.pdf PDF
!BLDG 7 DRAWINGS 83-90 of 90.pdf PDF
Davis Bacon Wage Determination_dvb.mht MHT file
!BLDG 7 DRAWINGS 51-60 of 90.pdf PDF
SF 1442 Solicitation.pdf PDF
Standard Form 25a.pdf PDF
RFP NIHOF2009130.pdf PDF
!BLDG 7 DRAWINGS 21-30 of 90.pdf PDF
!BLDG 7 DRAWINGS 81-82 of 90.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING A: MECHANICAL PLAN

SCALE: 1/4"=1’−0"

OFFICE

COMPUTER

LAB

STAIR

EQUIPMENT

PARTIAL UPPER LEVEL PLAN

SCALE: 1/4"=1’−0"

PUMP / CONVERTOR ELEVATION

NO SCALE

CONVERTER PIPING DIAGRAM

NO SCALE

MECHANICAL CHASE PLAN

SCALE: 1/4"=1’−0"

SPECIFIC NOTES:

RELOCATED FAN COIL UNIT. INSTALL NEW

SUPPORTS OR EXTEND EXISTING. EXTEND

CHILLED WATER SUPPLY AND RETURN PIPING

TO NEW LOCATION AND ATTACH TO UNIT.

EXISTING HEATING WATER PUMP. RECONNECT

TO HEATING WATER PIPING. EXISTING VALVES

AND PIPING ARRANGEMENT MAY BE UTILIZED.

RELOCATED HEATING WATER PUMP WITH NEW

CONCRETE HOUSEKEEPING PAD.

RELOCATED EXPANSION TANK WITH 3/4" LINE TO

AIR SEPARATOR. EXTEND EXISTING MAKEUP

WATER FEED LINE (NOT SHOWN) TO NEW AIR

SEPARATOR LOCATION.

RELOCATED POT FEEDER.

UP TO AIR SEPARATOR ABOVE.

CONDENSATE RETURNS UP TO CONVERTORS

ABOVE.

STEEL SUPPORT STAND FOR CONVERTORS.

CONSTRUCT SIMILARLY TO DETAIL 6, SHEET

M4.1. FIELD LOCATE COLUMNS AS REQUIRED

TO AVOID OBSTACLES AND EQUIPMENT.

REUSE AND REINSTALL EXISTING FLEX

CONNECTORS, VALVES, STRAINER, GAUGES,

AND DIFFERENTIAL PRESSURE SWITCHES ON

PUMP RISERS OR REPLACE WITH NEW.

RELOCATE AND REARRANGE EXISTING STEAM

SUPPLY ASSEMBLIES SERVING CONVERTORS.

REPLACE COMPONENTS NOT REUSED.

ROUTE VACUUM SYSTEM EXHAUST UP

THROUGH GLASSWASH CHASE AND OUT

THROUGH ROOF. SEE DETAIL 5/M2.3.

BUILDING A:

PROVIDE CONCRETE PAD EXTENSION OF

EXISTING CONCRETE PAD FOR NEW

CONDENSATE PUMPING TRAP.

EXTEND EXISTING DOMESTIC WATER HEATERS

CONDENSATE TRAP LINES TO PT−A.2.

REV

DATE

CIVIL:

REVIEWED BY:

STRUCTURAL:

ELECTRICAL:

MECHANICAL:

ARCHITECTURAL:

HAMILTON, MONTANA

SHEET OF 90

DATE

06/19/09

31 30

A

5 3

13B23

M2.3

MECHANICAL PLAN

BUILDING A:

GENERAL NOTES:

HEAVY LINES REPRESENT NEW WORK WHILE

LIGHTER LINES REPRESENT EXISTING PIPING AND

EQUIPMENT.

THE CONTRACTOR SHALL PROVIDE MECHANICAL

INSULATION AS NOTED ON THIS SHEET FOR EXISTING

PIPING SYSTEMS AND EQUIPMENT. ALL INSULATION

SHALL COMPLY WITH SPECIFICATION SECTION 15250.

REMOVABLE PADS SHALL BE USED FOR ALL STEAM

TRAPS, VALVES AND STRAINER ASSEMBLIES UNLESS

SPECIFICALLY NOTED OTHERWISE. USE SPECIFIED

INSULATION THICKNESS FOR EACH SYSTEM UNLESS

OTHERWISE SPECIFICALLY NOTED. FIELD VERIFY ALL

PIPING AND EQUIPMENT SIZES.

FABRICATE AND PAINT ANY AND ALL NEW PIPE

SUPPORTS TO MATCH THE EXISTING SUPPORTS

USED IN THIS BUILDING.

206M23C5.dwg
M2.3