Davis Bacon Wage Determination_dvb.mht
MHT file 10 KB Posted
- Attached to
- Recovery - RML Building 7 Renovation
- Solicitation number
- NIHOF2009130
About this file
Wage Determination MT080007 Dated 06/26/2009
Text of this file
From: <Saved by Windows Internet Explorer 8> Subject:
Date: Mon, 29 Jun 2009 14:11:45 -0600 MIME-Version: 1.0 Content-Type: text/html;
charset="Windows-1252" Content-Transfer-Encoding: 7bit Content-Location: http://www.wdol.gov/wdol/scafiles/davisbacon/MT7.dvb X-MimeOLE: Produced By Microsoft MimeOLE V6.00.2900.5579
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META content="text/html; charset=windows-1252" http-equiv=Content-Type> <META name=GENERATOR content="MSHTML 8.00.6001.18783"></HEAD> <BODY><PRE>General Decision Number: MT080007 06/26/2009 MT7
Superseded General Decision Number: MT20070007
State: Montana
Construction Type: Building
Counties: Beaverhead, Broadwater, Deer Lodge, Granite, Jefferson, Powell, Ravalli and Silver Bow Counties in Montana.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date 0 02/08/2008 1 03/28/2008 2 05/16/2008 3 06/20/2008 4 07/11/2008 5 08/15/2008 6 08/29/2008 7 12/12/2008 8 05/08/2009 9 06/26/2009
BRMT0001-001 06/01/2008
Beaverhead, Broadwater, Deer Lodge, Granite, Jefferson, Powell and Silver Bow Counties
Rates Fringes
Bricklayer, Stonemason...........$ 25.35 9/76
BRMT0003-002 06/01/2008
RAVALLI COUNTY
Rates Fringes
BRICKLAYER.......................$ 23.98 9.76
CARP0028-001 05/01/2007
BROADWATER, DEER LODGE, GRANITE, JEFFERSON, POWELL, AND RAVALLI
COUNTIES
Carpenters: (Including installation of Forms, Drywall, Cabinets, and Acoustical Ceiling; excluding installation of Batt/Blown Insulation, and Overhead Door) Zone 1......................$ 18.49 8.40
CARPENTERS ZONE DEFINITIONS
The hourly rate applicable shall be determined by measuring the road miles over the shortest practical maintained route from the county courthouse in Anaconda, Bozeman, Helena, and Missoula to the center of the job (employees living within a 15 mile radius of said project shall be considered Zone 1): ZONE PAY (Add to Zone 1 basic hourly rate):
Zone 1: 0 to 15 miles - Base Rate Zone 2: 15 to 30 miles - $ .75 Zone 3: 30 to 50 miles - $1.00 Zone 4: over 50 miles - $1.50
CARP0112-002 05/01/2004
BEAVERHEAD AND SILVER BOW COUNTIES
Rates Fringes
Carpenters: (ZONE PAY NOT
APPLICABLE)
(Including installation of Forms, Drywall, Cabinets, and Acoutical Ceiling; Excluding installation of Batt/Blown Insulation and Overhead Doors)...$ 17.48 8.22
ELEC0233-004 08/01/2007
BEAVERHEAD, DEER LODGE, GRANITE, JEFFERSON, POWELL, AND SILVER
BOW COUNTIES
ELECTRICIAN (Including wiring for Alarms and Telephones;
excluding HVAC wiring)...........$ 25.50 4.25%+9.20
* ELEC0233-008 06/01/2009
BROADWATER COUNTY
Rates Fringes
ELECTRICIAN (Including wiring for Alarms and Telephones;
excluding HVAC wiring)...........$ 28.36 4.25%+8.55
ELEC0233-009 06/01/2005
Rates Fringes
Communication Technician (HVAC Wiring only)...............$ 19.62 4.25%+5.90
ELEC0768-002 03/01/2008
RAVALLI COUNTY
Rates Fringes
ELECTRICIAN (Including wiring for Alarms and Telephones;
excluding HVAC wiring)...........$ 27.10 10.71
IRON0732-008 06/01/2008
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 24.80 14.61
PAIN1922-003 03/01/2000
Rates Fringes
GLAZIER..........................$ 11.00 1.10
PLAS0119-002 05/01/2008
AREA 1: BEAVERHEAD, BROADWATER, GRANITE, RAVALLI COUNTIES
AREA 2: DEER LODGE, JEFFERSON, POWELL, SILVER BOW COUNTIES
Cement Mason/Plasterer Area 1......................$ 18.83 6.96 Area 2......................$ 20.24 6.86
ZONE PAY:
The hourly rate applicable shall be determined by measuring the road miles over the shortest practical maintained route from the County Courthouse in Bozeman, Butte, Dillon, Helena, Missoula, and Sidney to the center of the job:
ZONE 1: 0 to 30 miles - Base Pay ZONE 2: 30 to 60 miles - Base Pay + $2.95 ZONE 3: Over 60 miles - Base Pay + $4.75
PLUM0041-003 07/01/2008
BEAVERHEAD, BROADWATER, GRANITE, DEER LODGE, JEFFERSON, POWELL
(Southern part), AND SILVER BOW COUNTIES
PLUMBER/PIPEFITTER (Including HVAC piping).....................$ 28.00 10.75
PLUM0459-003 05/01/2009
POWELL (Northern part) AND RAVALLI COUNTIES
Rates Fringes
PLUMBER/PIPEFITTER (Including HVAC piping).....................$ 28.26 11.15
SHEE0103-002 07/01/2002
Rates Fringes
Sheet Metal Worker (HVAC only: Set unit and install Duct Work).......................$ 22.24 9.33
SUMT1999-002 02/23/1999
Rates Fringes
Laborers:
(1) General.................$ 12.21 3.70
(2) Asphalt Raker...........$ 12.80 3.70
(3) Cement Mason Tender.....$ 12.46 3.54
(4) Hodcarrier..............$ 13.61 3.70
Painters: (Including Caulking; Excluding Wallpaper Hanging).........................$ 15.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
</PRE></BODY></HTML>
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .