!BLDG 7 DRAWINGS 51-60 of 90.pdf
PDF 6 MB Posted
- Attached to
- Recovery - RML Building 7 Renovation
- Solicitation number
- NIHOF2009130
About this file
Construction Drawings 51-60
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 1.1 2 3 4 5
LAB
LAB
ELECT
VESTIBULE
ROOM
CONFERENCE
SUPPORT
OFFICE
COMPUTER
LAB
CONFERENCE
ROOM
STAIR
EQUIPMENT
LAB
ABCDD.1D.9E
ELECTRICAL
SUPPORT
SUPPORT
REV
DATE
CIVIL:
REVIEWED BY:
STRUCTURAL:
ELECTRICAL:
MECHANICAL:
ARCHITECTURAL:
HAMILTON, MONTANA
SHEET OF 90
DATE
06/19/09
BUILDING 7:
31 30
A
5 3
13B23
E3.0
ELECTRICAL BUILDING SECTIONS
54321.11
CORRIDOR
COMPUTER
LAB
LAB
CORRIDOR
ELECTRICAL
MECHANICAL
E5.0
REV
DATE
CIVIL:
REVIEWED BY:
STRUCTURAL:
ELECTRICAL:
MECHANICAL:
ARCHITECTURAL:
HAMILTON, MONTANA
SHEET OF 90
DATE
06/19/09
BUILDING 7:
31 30
A
5 3
13B23
E3.1
ELECTRICAL BUILDING SECTIONS
A T
A 1600A
1250A
REV
DATE
CIVIL:
REVIEWED BY:
STRUCTURAL:
ELECTRICAL:
MECHANICAL:
ARCHITECTURAL:
HAMILTON, MONTANA
SHEET OF 90
DATE
06/19/09
BUILDING 7:
31 30
A
5 3
13B23
DEMOLITION ONE−LINE DIAGRAM
E4.0
GENERAL NOTES:
PHASE OUTAGES
WORK PHASING SCHEDULE
WORK DESCRIPTION PHASE OUTAGES WORK DESCRIPTION
REV
DATE
CIVIL:
REVIEWED BY:
STRUCTURAL:
ELECTRICAL:
MECHANICAL:
ARCHITECTURAL:
HAMILTON, MONTANA
SHEET OF 90
DATE
06/19/09
BUILDING 7:
31 30
A
5 3
13B23
REMODEL ONE−LINE DIAGRAM
E4.1
GENERAL NOTES:
REV
DATE
CIVIL:
REVIEWED BY:
STRUCTURAL:
ELECTRICAL:
MECHANICAL:
ARCHITECTURAL:
HAMILTON, MONTANA
SHEET OF 90
DATE
06/19/09
BUILDING 7:
31 30
A
5 3
13B23
E5.0
ELECTRICAL DETAILS
| E3-0.pdf |
| 109E30C5.dwg |
| E3.0 |
| E3-1 |
| 109E31C5.dwg |
| E3.1 |
| E4-0 |
| 109E40D5.dwg |
| E4.0 |
| E4-1 |
| 109E41D5.dwg |
| E4.1 |
| E5-0 |
| 109E50D5.dwg |
| E5.0 |
| F1 |
| F2-0 |
| FP2-1 |
| LA1-0 |
| LA1-1 |
File details come from the government source that posted it. Updated .