Amendment 01

View the file

Other files

File Type Posted
B7 Bid Amendment 2.pdf PDF
sf30 Amendment 02 to NIHOF2009130.pdf PDF
CD3.pdf PDF
M2.3.pdf PDF
E2.1.pdf PDF
sf30 Amendment 01 to NIHOF2009130.pdf PDF
M4.4.pdf PDF
CD2.pdf PDF
M0.1.pdf PDF
M1.3.pdf PDF
CD1.pdf PDF
2 2 scorecard preliminary review 6.25.09.pdf PDF
!BLDG 7 DRAWINGS 63-70 of 90.pdf PDF
!BLDG 7 DRAWINGS 71-80 of 90.pdf PDF
!BLDG 7 DRAWINGS 31-40 of 90.pdf PDF
!BLDG 7 DRAWINGS 01-10 of 90.pdf PDF
!BLDG 7 DRAWINGS 41-50 of 90.pdf PDF
!BLDG 7 DRAWINGS 61-62 of 90.pdf PDF
Standard Form 25.pdf PDF
Standard Form 24.pdf PDF
!BLDG 7 DRAWINGS 11-20 of 90.pdf PDF
BLDG 7 SPECIFICATIONS.pdf PDF
!BLDG 7 DRAWINGS 83-90 of 90.pdf PDF
Davis Bacon Wage Determination_dvb.mht MHT file
!BLDG 7 DRAWINGS 51-60 of 90.pdf PDF
SF 1442 Solicitation.pdf PDF
Standard Form 25a.pdf PDF
RFP NIHOF2009130.pdf PDF
!BLDG 7 DRAWINGS 21-30 of 90.pdf PDF
!BLDG 7 DRAWINGS 81-82 of 90.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

09-944

BID AMENDMENT NO. 1,

RML Building 7 Renovation P.1

FROM THE OFFICE OF: ARCHITECTS DESIGN GROUP, PC

NO. 1 SUNSET PLAZA

KALISPELL, MONTANA 59901

PROJECT: RML Building 7 Renovation ADG 09-944

BID AMENDMENT NO. 1 08-03-09

GENERAL:

By building green, this project plans to assist in protecting air and water quality, reducing greenhouse gas emissions and generating less solid waste, while conserving natural resources and creating healthier indoor and outdoor environments. The goal is to produce tangible economic and public health benefits. These include lower operating costs via reduced energy and water utility bills, and reduced maintenance and replacement costs due to greater durability of materials. Green building results in improved occupant health and comfort (primarily due to indoor air quality measures and daylighting) which in turn leads to higher productivity, less absenteeism, and reduced insurance costs and liability risk.

During construction, the opportunity exists for contractors and subcontractors to show leadership in building green, as measured by the Leadership in Energy and Environmental Design (LEED) rating system. The design team will assist the contractor and subcontractors in meeting this high standard through construction waste management, recycled content in building materials, installation of energy efficient systems, and the purchase of regionally extracted, harvested, assembled and built products.

SPECIFICATIONS:

SECTION 01310

Add to paragraph 1.5.B.3, “s. Requirements for review and approval of hot work operations.”

SECTION 01352

Replace paragraph 1.2.E with the following:

1.2.E. LEED Credits: The project design, if constructed as indicated, will achieve the Credits as identified in paragraph 1.5.D LEED Action Plan and as tabulated on the attached “LEED FOR New Construction v2.2 Registered Project Checklist.”

Replace the “LEED FOR New Construction v2.2 Registered Project Checklist” that is bound at the end of this section with the revised “LEED FOR New Construction v2.2 Registered Project Checklist” that is attached to this Amendment.

Delete paragraph 1.5.D.8 and replace it with the following paragraph:

8. Indoor Environmental Quality (EQ) Credit 4.1: All installed adhesives and sealants used on the interior of the building (defined as inside of the weatherproofing system) must meet low/no VOC limits as outlined in current LEED version. Contractor will post VOC limit information in job site office making it readily available for subcontractor reference.

RML Building 7 Renovation P.2

Add the following subparagraphs to 1.5.D

9. Indoor Environmental Quality (EQ) Credit 4.2: All installed paints and coatings used on the interior of the building (defined as inside of the weatherproofing system) must meet low/no VOC limits as outlined in current LEED version. Contractor will post VOC limit information in job site office making it readily available for subcontractor reference.

10. Indoor Environmental Quality (EQ) Credit 4.4: All installed composite wood and agrifiber and laminating adhesives used on the interior of the building (defined as inside of the weatherproofing system) shall contain no added urea-formaldehyde resins.

Renumber the existing subparagraphs 1.5.D.9 and 1.5.D.10 as 1.5.D.11 and 1.5.D.12 to accommodate the subparagraphs added above.

Delete paragraph 1.5.F.8 and replace it with the following paragraph:

8. Indoor Environmental Quality (EQ) Credit 4.1: All installed adhesives and sealants used on the interior of the building (defined as inside of the weatherproofing system) must meet low/no VOC limits as outlined in current LEED version. Contractor will post VOC limit information in job site office making it readily available for subcontractor reference.

Add the following subparagraphs to 1.5.D

9. Indoor Environmental Quality (EQ) Credit 4.2: All installed paints and coatings used on the interior of the building (defined as inside of the weatherproofing system) must meet low/no VOC limits as outlined in current LEED version. Contractor will post VOC limit information in job site office making it readily available for subcontractor reference.

10. Indoor Environmental Quality (EQ) Credit 4.3: All installed carpet systems must meet the testing and product requirements of the Carpet and Rug Institute’s Green Label Plus program and low/no VOC limits as outlined in current LEED version. Contractor will post VOC limit information in job site office making it readily available for subcontractor reference.

11. Indoor Environmental Quality (EQ) Credit 4.4: All installed composite wood and agrifiber and laminating adhesives used on the interior of the building (defined as inside of the weatherproofing system) shall contain no added urea-formaldehyde resins.

Renumber the existing subparagraphs 1.5.D.9 and 1.5.D.10 as 1.5.D.12 and 1.5.D.13 to accommodate the subparagraphs added above.

SECTION 01732

Delete line 3.8 A. 1. a. (2) two Emergency Generators

Renumber the existing subparagraphs 3.8 A. 1. b. and 3.8 A. 1. c. as 3.8 A. 1. a. and 3.8 A. 1. b. to accommodate the deletion above.

Add the following Subparagraphs to Paragraph 3.8 A.:

2. Building A

a. (2) two electric Condensate Pumps/Receivers shown to be removed on Sheet M1.3

RML Building 7 Renovation P.3

Section 04810

Renumber and Shift paragraphs as follows: “Subparagraphs 1.5.D.1 through D.7 should be numbered 1.5.A.1 through A.7”.

Section 08411

Add the following Subparagraphs to Paragraph 1.5:

1.5.G. LEED Submittals

1. Product Data for Credit MR 4.1: For products having recycled content, documentation indicating percentages by weight of postconsumer and pre-consumer recycled content.

a. Include statement indicating costs for each product having recycled content.

b. Include source of information for recycled content.

Section 08911

Add the following Subparagraphs to Paragraph 1.4 :

1.4.H. LEED Submittals

2. Product Data for Credit MR 4.1: For products having recycled content, documentation indicating percentages by weight of postconsumer and pre-consumer recycled content.

a. Include statement indicating costs for each product having recycled content.

b. Include source of information for recycled content.

Section 09651

Delete Paragraph 2.1.

Add the following Subparagraphs to Paragraph 1.3.B:

2. Product Data for Credit MR 4.1: For products having recycled content, documentation indicating percentages by weight of postconsumer and pre-consumer recycled content.

a. Include statement indicating costs for each product having recycled content.

b. Include source of information for recycled content.

Section 15000

Add the following paragraph:

1.22 This project is a LEED registered project and shall be submitted for LEED Certification under

LEED v2.2. Refer to specification section 01352 for more detailed requirements. As such, the contractors shall be required to provide necessary documentation for certification and commissioning. The contractor may also have to follow some construction methods and utilize specific kinds of material. Mechanical contractor shall coordinate with the General

RML Building 7 Renovation P.4 contactor and provide all information and materials required, and follow construction methods necessary to meet the requirements for LEED Certification.

Section 15060

Add the following to 2.2:

C. Seismic flex connectors not required for PVC or high purity DI piping.

Section 16000

Add the following paragraph:

1.22 This project is a LEED registered project and shall be submitted for LEED Certification under

LEED v2.2. Refer to specification section 01352 for more detailed requirements. As such, the contractors shall be required to provide necessary documentation for certification and commissioning. The contractor may also have to follow some construction methods and utilize specific kinds of material. Electrical contractor shall coordinate with the General contactor and provide all information and materials required, and follow construction methods necessary to meet the requirements for LEED Certification.

Section 16740

Delete existing Paragraph 1.2.B and replace with the following:

B. This project includes installing new receptacles, cabling, raceways, cable tray, 19” racks, rack hardware and all termination equipment as shown on plans. All equipment shall be Cat 6 rated. System shall be complete. At new IT equipment rack location, provide cables for both Cat 6 cabling and fiber optic jumpers from new equipment to existing switch in adjacent room 6107.

Add the following paragraphs:

C. Racks to be configured to match existing RML standards utilizing similar cable management systems, color coding and terminations. Contractor shall coordinate all requirements with Contracting Officer prior to installation.

D. Under this contract, General contractor shall include in proposal an allowance for providing and installing additional network, telephone and IT equipment at the end of the project.

Refer to Section 01210 for allowance requirements to provide additional network, telephone, and teleconferencing equipment. Installation of all equipment to conform to this section.

DRAWINGS:

ARCHITECTURAL

Sheet A0.3:

FIRST LEVEL EXITING PLAN - Clarify location of EXIT CORRIDOR. See CD1.

Sheet A0.4:

RML Building 7 Renovation P.5

SECOND LEVEL EXITING PLAN - Clarify location of EXIT CORRIDOR. See CD2.

Sheet A1.1:

Detail 1 - Add note “NOTE: SEAL AROUND ALL PENETRATIONS AT GRATE TO

PREVENT PASSAGE OF SMOKE. SUSPEND FROM GRATING”.

Sheet A1.4:

CABINET NOTES - Add Cabinet Note #9 “PROVIDE (3)TYPE F CABINETS”.

Sheet A8.1:

Detail 1A - Add note “PROVIDE UL LISTED DESIGN TO MATCH WALL FIRE RATING”.

Sheet A8.2:

Detail 6, 7, and 10 - Add 1 ½”Ø standard pipe guard at 42” above finished floor. Install handrail at 2’-

10” as indicated and install 1 ½” clear from face of handrail to face of guard rail.

Support handrail with metal bracket at each post. See typical detail CD3.

Sheet A9.0:

WINDOW TYPES - Window Type W5 – Add vertical mullion at midpoint of glazing.

STRUCTURAL

NO ITEMS

MECHANICAL

Sheet M0.1 - Miscellaneous Equipment Schedule:

Change Heat Exchanger HX-1 to Heat Exchanger HX-7.1. Change connections to use both ends and shown on sheet M2.2.

Delete Louver L-1 Heat Plates and Pex Tubing. Plates and pex will not be installed on the main intake louver.

Add pressure motive condensate pump traps as shown on attached revised sheet.

Sheet M0.2 – Louver & Damper Schedule:

Delete fire dampers FD-7105A and FD-7105B.

Sheet M0.2 – Air Valve Schedule:

Change the min/max design airflow volumes for GEX-71701 to 1100/3000 cfm, HEV-7101 to 100/500, GEX-7209 to 90/730, HEV-7209 to 160/800 cfm, and SAV-7209 to 150/790 cfm. Flow rates remain subject to change with the final fume hood selection.

Sheet M0.2 - Pump Schedule:

Change pumps HWP-7.1 & HWP-7.2 to Taco model 1935 for use with variable frequency drives.

Sheet M0.3 – Laboratory Equipment Connection Schedule:

Change exhaust airflow volume for FH1 to 500 cfm and FH2 to 800 cfm. Flow rates remain subject to change with the final fume hood selection.

Sheet M0.3 – Heating Water Convertor Schedule:

Change fouling factor for heat water convertors HWC-A.1 and HWC-A.2 to 0.0007.

RML Building 7 Renovation P.6

Sheet M1.3 – Building A Mechanical Demolition Plan:

Remove existing electric condensate pump/receiver units including connecting piping as shown on attached revised sheet.

Sheet M2.1 – First Floor Plumbing & Piping Plan:

Change note bubble 14 to refer to section 15060.

Sheet M2.2 – Second Floor Plumbing & Piping Plan:

Change note bubble 17 to refer to section 15060.

Sheet M2.3 – Building A Mechanical Plan:

Add pressure motive condensate pumping traps PT-A.1 and PT-A.2 and connected piping as shown on attached revised sheet.

Sheet M3.1 – First Floor HVAC Plan:

Delete fire dampers FD-7105A and FD-7105B.

Sheet M4.4 – Mechanical Details:

Delete Vertical Fire Damper Detail, detail 2.

Sheet M4.4 – Mechanical Details:

Add details for condensate pump-trap assemblies PT-A.1 and PT-A.2 as shown on the attached revised sheet.

Sheet M5.1 – Airflow Systems Diagrams:

Delete fire dampers FD-7105A and FD-7105B from Supply Airflow Diagram, detail 2.

ELECTRICAL

Sheet E2.1 – Tel/Comm Plans:

Replace existing sheet E2.1 with revised sheet E2.1 attached this addendum. New sheet modifies the telephone and data cable termination requirements and routing of cables from Building 5 tel/data closets to Building 6 IT room.

Sheet E2.2 – Fire Alarm and Security Plan:

Add the following general note:

A. Existing fire sprinkler entrance riser is to be revised. Refer to sheets F1.0 and F2.0 for scope of changes. There are currently a flow switch and tamper switches being monitored from the building fire alarm panel. Reconnect existing monitoring modules to new tamper switches and one flow switch. Provide additional monitoring module for second flow switch. Post Indicator Valve (PIV) on exterior of building not required to be monitored from fire alarm system.

Sheet E2.3 – Building A and & Electrical Plan:

Add Demolition of existing Condensate tank power connections. Three existing condensate tanks have power connections from MCC-CT. Remove power connections back to MCC and reliable breakers as spare. Refer to Mechanical Sheet M-1.3 reissued this addendum.

END OF BID AMENDMENT NO. 1