OFFICE
VESTIBULE
COMPUTER
LAB
ELECT
STAIR
EQUIPMENT
CORRIDOR
BUILDING A : MECHANICAL DEMOLITION PLAN
SCALE: 1/4"=1’−0"
SPECIFIC NOTES:
EXISTING CABINET STYLE FAN COIL UNIT TO BE
RELOCATED AND RAISED ABOVE HEIGHT OF
NEW PIPING. MODIFY PIPING AND SUPPORTS AS
REQUIRED.
EXISTING HEATING WATER PUMP TO BE
RELOCATED. SEE PLANS FOR NEW LOCATION.
REMOVE EXISTING CONCRETE EQUIPMENT
CURB. GRIND FLOOR FLUSH AND PAINT TO
MATCH EXISTING.
FOLLOWING PLACEMENT OF NEW HEATING
WATER CONVERTORS AND RELOCATION OF
EXISTING HEATING WATER PUMP, REMOVE
SYSTEM AIR SEPARATOR AND MAKEUP WATER
FEED ASSEMBLY (NOT SHOWN) AND RELOCATE
AS INDICATED ON PLANS FOR NEW WORK.
RELOCATE EXISTING EXPANSION TANK. SEE
PLANS FOR NEW WORK.
REMOVE BRANCH RETURN LINES TO EXISTING
HEATING WATER CONVERTORS AND CAP AT
OVERHEAD MAIN. VALVES AND PIPE FITTINGS
MAY BE RELOCATED TO SERVE NEW HEATING
WATER CONVERTORS.
REMOVE, MODIFY AND RELOCATE THE STEAM
CONTROL VALVE DROP TO EACH HEATING
WATER CONVERTOR. PROVIDE NEW VALVES
AND COMPONENTS AS REQUIRED TO SUIT NEW
ARRANGEMENT SHOWN ON PLANS.
REMOVE EXISTING HEATING WATER
CONVERTORS.
EXISTING TRAP ASSEMBLIES AND TRAP LEAK
DETECTOR ASSEMBLIES TO BE REARRANGED
AND RELOCATED TO SERVE NEW HEATING
WATER CONVERTORS. PRESERVE THE EXISTING
FUNCTIONAL ARRANGEMENT OF COMPONENTS
BUT REASSEMBLE THEM AS DEPICTED IN NEW
LOCATION.
REMOVE THE STRUCTURAL STEEL CONVERTOR
BASE ASSEMBLIES AND THE CONCRETE
EQUIPMENT PAD. GRIND CONCRETE FLUSH AND
PAINT FLOOR TO MATCH EXISTING.
REMOVE PORTIONS OF HEATING WATER
SUPPLY AND RETURN HEADERS AS INDICATED.
PORTIONS AND COMPONENTS MAY BE REUSED
WHERE FEASIBLE.
RELOCATE EXISTING POT FEEDER. REUSE
EXISTING PIPING AND VALVING OR REPLACE
WTIH NEW. SEE PLANS FOR NEW LOCATION.
REMOVE ABONDONED VENT LINE COMPLETELY
FROM PREVIOUSLY REMOVED CONDENSATE
RECEIVER.
REMOVE ABONDONED PUMPED CONDENSATE
RETURN LINE FROM PREVIOUSLY REMOVED
CONDENSATE PUMP AND RECEIVER.
REMOVE CONDENSATE PUMPS AND RECEIVER.
REV
DATE
CIVIL:
REVIEWED BY:
STRUCTURAL:
ELECTRICAL:
MECHANICAL:
ARCHITECTURAL:
HAMILTON, MONTANA
SHEET OF 90
DATE
06/19/09
31 30
A
5 3
13B23
M1.3
DEMOLITION PLAN
BUILDING A: MECHANICAL
GENERAL NOTES:
HEAVY LINES REPRESENT NEW WORK WHILE
LIGHTER LINES REPRESENT EXISTING PIPING AND
EQUIPMENT.
THE CONTRACTOR SHALL PROVIDE MECHANICAL
INSULATION AS NOTED ON THIS SHEET FOR EXISTING
PIPING SYSTEMS AND EQUIPMENT. ALL INSULATION
SHALL COMPLY WITH SPECIFICATION SECTION 15250.
REMOVABLE PADS SHALL BE USED FOR ALL STEAM
TRAPS, VALVES AND STRAINER ASSEMBLIES UNLESS
SPECIFICALLY NOTED OTHERWISE. USE SPECIFIED
INSULATION THICKNESS FOR EACH SYSTEM UNLESS
OTHERWISE SPECIFICALLY NOTED. FIELD VERIFY ALL
PIPING AND EQUIPMENT SIZES.
FABRICATE AND PAINT ANY AND ALL NEW PIPE
SUPPORTS TO MATCH THE EXISTING SUPPORTS
USED IN THIS BUILDING.
OUTAGES AND PHASING:
ALL OUTAGES MUST BE SCHEDULED IN ADVANCE IN ACCORDANCE WITH
DIVISION 1 AND THE GENERAL CONDITIONS. TO LIMIT THE DURATION OF
OUTAGES, THE FOLLOWING PHASING HAS BEEN PROVIDED:
INSTALL NEW 8" HPS AND 4" PUMPED CONDENSATE IN BUILDING−7 TO THE
GREATEST EXTENT POSSIBLE PRIOR TO DEMOLITION AND
RECONNECTION OF EXISTING SYSTEMS.
INSTALL NEW AIR COMPRESSOR IN BUILDING−A PRIOR TO COMPRESSED
AIR LINE AND EXISTING AIR COMPRESSOR DEMOLITION IN BUILDING 7.
INDIVIDUALLY REINSTALL EACH VACUUM PUMP IN BUILDING−A PRIOR TO
VACUUM LINE DEMOLITION IN BUILDING−7. ONE VACUUM PUMP SHALL BE
OPERATIONAL AT ALL TIMES.
PERFORM CONNECTIONS TO EXISTING LABORATORY UTILITIES LOCATED
IN THE 2ND FLOOR CORRIDOR CEILING OF BUILDING−6 AT ONE TIME.