M1.3

View the file

Other files

File Type Posted
B7 Bid Amendment 2.pdf PDF
sf30 Amendment 02 to NIHOF2009130.pdf PDF
CD3.pdf PDF
M2.3.pdf PDF
E2.1.pdf PDF
Amendment 1 080309.pdf PDF
sf30 Amendment 01 to NIHOF2009130.pdf PDF
M4.4.pdf PDF
CD2.pdf PDF
M0.1.pdf PDF
CD1.pdf PDF
2 2 scorecard preliminary review 6.25.09.pdf PDF
!BLDG 7 DRAWINGS 63-70 of 90.pdf PDF
!BLDG 7 DRAWINGS 71-80 of 90.pdf PDF
!BLDG 7 DRAWINGS 31-40 of 90.pdf PDF
!BLDG 7 DRAWINGS 01-10 of 90.pdf PDF
!BLDG 7 DRAWINGS 41-50 of 90.pdf PDF
!BLDG 7 DRAWINGS 61-62 of 90.pdf PDF
Standard Form 25.pdf PDF
Standard Form 24.pdf PDF
!BLDG 7 DRAWINGS 11-20 of 90.pdf PDF
BLDG 7 SPECIFICATIONS.pdf PDF
!BLDG 7 DRAWINGS 83-90 of 90.pdf PDF
Davis Bacon Wage Determination_dvb.mht MHT file
!BLDG 7 DRAWINGS 51-60 of 90.pdf PDF
SF 1442 Solicitation.pdf PDF
Standard Form 25a.pdf PDF
RFP NIHOF2009130.pdf PDF
!BLDG 7 DRAWINGS 21-30 of 90.pdf PDF
!BLDG 7 DRAWINGS 81-82 of 90.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFICE

VESTIBULE

COMPUTER

LAB

ELECT

STAIR

EQUIPMENT

CORRIDOR

BUILDING A : MECHANICAL DEMOLITION PLAN

SCALE: 1/4"=1’−0"

SPECIFIC NOTES:

EXISTING CABINET STYLE FAN COIL UNIT TO BE

RELOCATED AND RAISED ABOVE HEIGHT OF

NEW PIPING. MODIFY PIPING AND SUPPORTS AS

REQUIRED.

EXISTING HEATING WATER PUMP TO BE

RELOCATED. SEE PLANS FOR NEW LOCATION.

REMOVE EXISTING CONCRETE EQUIPMENT

CURB. GRIND FLOOR FLUSH AND PAINT TO

MATCH EXISTING.

FOLLOWING PLACEMENT OF NEW HEATING

WATER CONVERTORS AND RELOCATION OF

EXISTING HEATING WATER PUMP, REMOVE

SYSTEM AIR SEPARATOR AND MAKEUP WATER

FEED ASSEMBLY (NOT SHOWN) AND RELOCATE

AS INDICATED ON PLANS FOR NEW WORK.

RELOCATE EXISTING EXPANSION TANK. SEE

PLANS FOR NEW WORK.

REMOVE BRANCH RETURN LINES TO EXISTING

HEATING WATER CONVERTORS AND CAP AT

OVERHEAD MAIN. VALVES AND PIPE FITTINGS

MAY BE RELOCATED TO SERVE NEW HEATING

WATER CONVERTORS.

REMOVE, MODIFY AND RELOCATE THE STEAM

CONTROL VALVE DROP TO EACH HEATING

WATER CONVERTOR. PROVIDE NEW VALVES

AND COMPONENTS AS REQUIRED TO SUIT NEW

ARRANGEMENT SHOWN ON PLANS.

REMOVE EXISTING HEATING WATER

CONVERTORS.

EXISTING TRAP ASSEMBLIES AND TRAP LEAK

DETECTOR ASSEMBLIES TO BE REARRANGED

AND RELOCATED TO SERVE NEW HEATING

WATER CONVERTORS. PRESERVE THE EXISTING

FUNCTIONAL ARRANGEMENT OF COMPONENTS

BUT REASSEMBLE THEM AS DEPICTED IN NEW

LOCATION.

REMOVE THE STRUCTURAL STEEL CONVERTOR

BASE ASSEMBLIES AND THE CONCRETE

EQUIPMENT PAD. GRIND CONCRETE FLUSH AND

PAINT FLOOR TO MATCH EXISTING.

REMOVE PORTIONS OF HEATING WATER

SUPPLY AND RETURN HEADERS AS INDICATED.

PORTIONS AND COMPONENTS MAY BE REUSED

WHERE FEASIBLE.

RELOCATE EXISTING POT FEEDER. REUSE

EXISTING PIPING AND VALVING OR REPLACE

WTIH NEW. SEE PLANS FOR NEW LOCATION.

REMOVE ABONDONED VENT LINE COMPLETELY

FROM PREVIOUSLY REMOVED CONDENSATE

RECEIVER.

REMOVE ABONDONED PUMPED CONDENSATE

RETURN LINE FROM PREVIOUSLY REMOVED

CONDENSATE PUMP AND RECEIVER.

REMOVE CONDENSATE PUMPS AND RECEIVER.

REV

DATE

CIVIL:

REVIEWED BY:

STRUCTURAL:

ELECTRICAL:

MECHANICAL:

ARCHITECTURAL:

HAMILTON, MONTANA

SHEET OF 90

DATE

06/19/09

31 30

A

5 3

13B23

M1.3

DEMOLITION PLAN

BUILDING A: MECHANICAL

GENERAL NOTES:

HEAVY LINES REPRESENT NEW WORK WHILE

LIGHTER LINES REPRESENT EXISTING PIPING AND

EQUIPMENT.

THE CONTRACTOR SHALL PROVIDE MECHANICAL

INSULATION AS NOTED ON THIS SHEET FOR EXISTING

PIPING SYSTEMS AND EQUIPMENT. ALL INSULATION

SHALL COMPLY WITH SPECIFICATION SECTION 15250.

REMOVABLE PADS SHALL BE USED FOR ALL STEAM

TRAPS, VALVES AND STRAINER ASSEMBLIES UNLESS

SPECIFICALLY NOTED OTHERWISE. USE SPECIFIED

INSULATION THICKNESS FOR EACH SYSTEM UNLESS

OTHERWISE SPECIFICALLY NOTED. FIELD VERIFY ALL

PIPING AND EQUIPMENT SIZES.

FABRICATE AND PAINT ANY AND ALL NEW PIPE

SUPPORTS TO MATCH THE EXISTING SUPPORTS

USED IN THIS BUILDING.

OUTAGES AND PHASING:

ALL OUTAGES MUST BE SCHEDULED IN ADVANCE IN ACCORDANCE WITH

DIVISION 1 AND THE GENERAL CONDITIONS. TO LIMIT THE DURATION OF

OUTAGES, THE FOLLOWING PHASING HAS BEEN PROVIDED:

INSTALL NEW 8" HPS AND 4" PUMPED CONDENSATE IN BUILDING−7 TO THE

GREATEST EXTENT POSSIBLE PRIOR TO DEMOLITION AND

RECONNECTION OF EXISTING SYSTEMS.

INSTALL NEW AIR COMPRESSOR IN BUILDING−A PRIOR TO COMPRESSED

AIR LINE AND EXISTING AIR COMPRESSOR DEMOLITION IN BUILDING 7.

INDIVIDUALLY REINSTALL EACH VACUUM PUMP IN BUILDING−A PRIOR TO

VACUUM LINE DEMOLITION IN BUILDING−7. ONE VACUUM PUMP SHALL BE

OPERATIONAL AT ALL TIMES.

PERFORM CONNECTIONS TO EXISTING LABORATORY UTILITIES LOCATED

IN THE 2ND FLOOR CORRIDOR CEILING OF BUILDING−6 AT ONE TIME.

206M13C5.dwg