RECOVERY - Groundhog and Morrison Trail Bridge Replacements - San Juan NF

Award Notice Posted

Solicitation number
AG-82B1-S-10-0085
Agency
Awarded
to Mcstone Aggregates, LLC
Set-aside
No set-aside

Opportunity facts

Contract number
AG-82B1-C-10-0090 Federal IDV award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Groundhog Trail Bridge No. 634-11.0 located on the Dolores RD of the San Juan NF in Section 22, T4N, R11W. N.M.P.M., approximately 7 miles northeast of Rico, CO via Forest Service Road (FSR) 535. Morrison Trail Bridge No. 610-0.2 located on the Dolores RD of the San Juan NF in Section 9, T38N, R11W, N.M.P.M., approximately 12 miles southwest of Rico, CO via Highway 145. Durango, Colorado 81301, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

AMENDMENT No. 3 - RECOVERY - GROUNDHOG AND MORRISON TRAIL BRIDGE REPLACEMENTS - RESPONSE Date is February 05, 2010 - 2:00PM Mountain Time.



All else remains the same.

Update #3 ·

RECOVERY- GROUNDHOG AND MORRISON TRAIL BRIDGE REPLACEMENTS - This presolicitation notice was INADVERTENTLY ADVERTISED with a Small Business set-aside. The solicitation package will be advertised on a FULL AND OPEN basis.



AMENDMENT NO. 2 - RECOVERY- GROUNDHOG AND MORRISON TRAIL BRIDGE REPLACEMENTS - This solicitation will be a Request For Proposals (RFP) and the following are changes to the presolicitation notice:



The project cost estimate is between $100,000 and $250,000. Performance and Payment Bonds will be required per the Miller Act and Davis-Bacon wage rates will apply.

Update #2 ·

RECOVERY- GROUNDHOG AND MORRISON TRAIL BRIDGE REPLACEMENTS - This presolicitation notice was INADVERTENTLY ADVERTISED with a Small Business set-aside. The solicitation package will be advertised on a FULL AND OPEN basis.

Update #1 ·

RECOVERY - Groundhog and Morrison Trail Bridge Replacement on the San Juan NF. Work includes, but not limited to, furnishing all material, equipment, transportation, labor and supervision necessary to construct two simple span, open web truss trail bridges. The Groundhog Trail Bridge crosses the Dolores River at Milepost 11.0 on Forest Trail 634. This project will replace the existing nail laminated bridge. The existing bridge is approximately 30 feel long and was constructed in 1959. The Morrison Trail Bridge crosses Bear Creek at Milepost 0.2 on Forest Trail 610. This project will replace the existing nail laminated bridge. The existing bridge is approximately 30 feet long and was constructed in 1959. Work for these projects shall include the following: Removal, transportation from site, and disposal off Government lands of the existing Groundhog trail bridge and Morrison trail bridge. Construction of the replacement bridges, approaches and trail work and all items identified in the solicitation.



The project cost estimate is between $25,000 and $100,000. A Payment Bond will be required per the Miller Act and Davis-Bacon wage rates will apply.





All responsible sources may submit a proposal which will be considered by the Government. In accordance with FAR 4.1102(a), prospective contractores must be registered in the Central Contractor Registration (CCR) database prior to award of a contract. Lack of registration in the CCR on the part of the offeror will render an offeror ineligible for award. Offerors may obtain information on registration and annual confirmation requirements by calling 888-227-2423, or via the Internet at http://www.ccr.gov//.



Files

File Type Posted
SF AMEND 2.PDF PDF
SF 30 AMEND 4.PDF PDF
Solicitation_Questions.xlsx XLSX spreadsheet
Morrison Trail 1.jpg JPG image
Groundhog Trail 2.jpg JPG image
Morrison Trail 3.jpg JPG image
Groundhog Trail.jpg JPG image
Morrison Trail 2.jpg JPG image
SF 30 AMEND 3.pdf PDF
Groundhog Trail 3.jpg JPG image
Wage determination.txt TXT text file
SF 30 AMEND 1.COM.pdf PDF
OF 336.pdf PDF
AG-82B1-S-10-0085.pdf PDF
Groundhog.SPECS.pdf PDF
Groundhog.trails_bridge_dm.pdf PDF
Groundhog.MAPS.pdf PDF
Show all 17

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors