Recovery - grandview campground, long draw campground and chambers lake well access - arapaho roosevelt national forest
Award Notice Posted
- Solicitation number
- AG-82B1-S-10-0142
- Agency
-
Operations Center Intermountain
Economic Recovery Operations, Department of Agriculture
- Awarded
- to Wayne's Pump Service, LLP
- Set-aside
- Emerging Small Business
Opportunity facts
- Contract number
- AG-82B1-P-10-0036 Federal contract award
- NAICS code
- 238110 Poured Concrete Foundation and Structure Contractors
- PSC
- Not on record
- Place of performance
- see locations listed above, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
THIS EFFORT HAS BEEN SET ASIDE FOR EMERGING SMALL BUSINESSES.
Update #1 ·
RECOVERY - This project consists of the removal of the existing hand pump and concrete slab and installation and construction of new concrete slag and new handpump at the Grandview Campground and Long Draw Campground. Minor excavation and construction of a new concrete wellhead slab for the Chambers Lake Campground.
The projects are at the following locations: Long Draw Campground and Grandview Campground - From Fort Collins, Colorado travel north on State Highway 287 to intersection with State Highway 14 then travel west approximately 53 miles to intersection with NFSR 156 (Long Draw Road). Then travel south along NFSR 156 for approximately 14 miles to the Long Draw Campground. Then travel west along NFSR 156 approximately 3 miles to the Grandview Campground.
Chambers Lake Well Access is located from Fort Collins, Colorado travel north on State Highway 287 to intersection with State Highway 14 then travel west approximately 53 miles to intersection with NFSR 156 (Long Draw Road). On the south side of State Highway 14 there is a CDOT pulloff. Directly across from this pulloff, on the north side of State Highway 14 is the Chambers Lake access road. This access road is currently closed off with barrier rocks.
The project cost estimate is between $25,000 and $100,000.. Performance and payment bonds will be required per the Miller Act and Davis Bacon wage rates will apply.
All responsible sources may submit a bid which will be considered by the Government. In accordance with FAR 4.1102(a), prospective contractors must be registered in the Central Contractor Registration (CCR) database prior to award of a contract. Lack of registration in the CCR on part of the offeror will render an offeror ineligible for award. Offerors may obtain information on registration and annual confirmation requirements by calling 888-227-2423 or via the Internet at http://www.ccr.gov//.
Files
| File | Type | Posted |
|---|---|---|
| drawing02.pdf | ||
| signeddrawing01.pdf | ||
| drawing03.pdf | ||
| drawing04.pdf | ||
| SF 18.PDF | ||
| Specifications Document.doc | DOC document | |
| AG-82B1-S-10-0142.pdf | ||
| Wage Determination.txt | TXT text file | |
| ExperienceQuestions_012910.docm | DOCM document |