RECOVERY - Foreste Wide Deferred Trail Maintenance and Re-construction, Salmon-Challis National Forest

Award Notice Posted

Solicitation number
AG-82B1-S-10-0041
Agency
Awarded
to Big Pine Construction LLC
Set-aside
No set-aside

Opportunity facts

Contract number
AG-82B1-C-10-0123 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Salmon-Challis National Forest, Lemhi and Custer Counties Salmon, Idaho 83467, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Split awards were made against this solicitation as follows:



Contract Number: AG-82B1-C-10-0128

Award Date: Mar 22 2010

Award Amount: $96,792.00

Contract Line Item: 1.3(a) & 1.3(b)

Contractor: Korell Outfitters

2445 West Highway 52

Emmett, ID 83617



Contract Number: AG-82B1-C-10-0130

Award Date: Mar 22 2010

Award Amount: $78,671.00

Contract Line Item: 1.2

Contractor: Douglas Peschong Construction LLP

2080 Seid Creek Road

Cambridge, ID 83610

Update #2 ·

Proposals are being solicited by the USDA, Forest Service for the Forest Wide Deferred Trail Maintenance and Re-construction project located on the Salmon-Challis National Forest, Lemhi and Custer Counties, Idaho. The Government intends to award multiple contracts to perform deferred maintenance and reconstruction on trails located throughout the Salmon-Challis National Forest and Frank Church River of No Return Wilderness Area. Work will be performed in wilderness and non-wilderness areas, and fire affected areas on different types of trails including hiker, pack and saddle, and motorized trails. The nature of the work varies for each trail and trail type. Work will include, but is not limited to: logging out of heavy downfall through past burned areas; removal of large rocks and slide material; blasting of rock ledge material; relocation of trail that have migrated downhill over time; re-establishment of trails through avalanche paths; normal maintenance on trail sections to tread width and clearing standards; construction of drainage structures and dry wall stacking on damaged trail sections; and trail surfacing on sections causing resource damage. This requirement is being solicited as a Firm-Fixed Price Request for Proposal using negotiated procedures. The approximate start work date will be spring of 2010 as trails become accessible. Proposals are due at 3:00 p.m. MST, January 20 2010. The estimated price range is between $250,000 and $500,000. The solicitation will be available on approximately November 30, 2009 and may be downloaded from this site at that time. All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. Vendors are required to be registered in the Central Contractor Registration (CCR) http:www.ccr.gov and shall complete the On-Line Registration and Certifications Application (ORCA) http://orca.bpn.gov. . All responsible sources may submit a response to this announcement which will be considered by this agency.

Update #1 ·

Proposals are being solicited by the USDA, Forest Service for the Forest Wide Deferred Trail Maintenance and Re-construction project located on the Salmon-Challis National Forest, Lemhi and Custer Counties, Idaho. The Government intends to award multiple contracts to perform deferred maintenance and reconstruction on trails located throughout the Salmon-Challis National Forest and Frank Church River of No Return Wilderness Area. Work will be performed in wilderness and non-wilderness areas, and fire affected areas on different types of trails including hiker, pack and saddle, and motorized trails. The nature of the work varies for each trail and trail type. Work will include, but is not limited to: logging out of heavy downfall through past burned areas; removal of large rocks and slide material; blasting of rock ledge material; relocation of trail that have migrated downhill over time; re-establishment of trails through avalanche paths; normal maintenance on trail sections to tread width and clearing standards; construction of drainage structures and dry wall stacking on damaged trail sections; and trail surfacing on sections causing resource damage. This requirement is being solicited as a Firm-Fixed Price Request for Proposal using negotiated procedures. The approximate start work date will be spring of 2010 as trails become accessible. Proposals are due at 3:00 p.m. MST, December 30, 2009. The estimated price range is between $250,000 and $500,000. The solicitation will be available on approximately November 30, 2009 and may be downloaded from this site at that time. All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. Vendors are required to be registered in the Central Contractor Registration (CCR) http:www.ccr.gov and shall complete the On-Line Registration and Certifications Application (ORCA) http://orca.bpn.gov. . All responsible sources may submit a response to this announcement which will be considered by this agency.

Files

File Type Posted
Amendment 01.doc DOC document
FBO Upload.zip ZIP file

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors