RECOVERY-DesignBuild Services Cesar E. Chavez Memorial Office Building Denver, CO

Award Notice Posted

Solicitation number
GS-08P-10-JB-C-0005
Agency
Awarded
to G.e. Johnson Construction Co, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
GS-08P-10-JB-C-0005 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Cesar E. Chavez Memorial Office Bldg 1244 Speer Blvd Denver, Colorado 80204, United States

Notice details come from SAM.gov. Updated .

Notice text

13 versions

Update #13 · Latest ·

MODIFICATION PS56 - 9TH FLOOR REZONE

 THIS NOTICE IS FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO THE CONTRACTOR UNDER CONTRACT GS-08P-10-JB-C-0005.  THIS IS NOT A REQUEST FOR PROPOSAL. GSA's Rocky Mountain Region, Public Building Service, Design and Construction Division has issued modification PS56 to include the following work; include labor, supervision, materials and equipment to rezone the 9th floor mechanical system.  This work is valued at $45,474.00. This modification is funded through an agency reimbursable work authorization. THIS IS NOT A REQUEST FOR PRICE OR TECHNICAL PROPOSALS. Any questions regarding this notice must be submitted in writing via email to Rhonda Nelson at rhonda.nelson@gsa.gov.

MODIFICATION PS57 - BUILDOUT OF 4TH AND 5TH FLOORS

 THIS NOTICE IS FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO THE CONTRACTOR UNDER CONTRACT GS-08P-10-JB-C-0005.  THIS IS NOT A REQUEST FOR PROPOSAL. GSA's Rocky Mountain Region, Public Building Service, Design and Construction Division has issued modification PS57 to include the following work; Buildout of core shell and a portion of tenant improvements of the 4th and 5th floors.  This work isvalued at $1,034,000.00. This modification is funded through the Public Building Service. THIS IS NOT A REQUEST FOR PRICE OR TECHNICAL PROPOSALS. Any questions regarding this notice must be submitted in writing via email to Rhonda Nelson at rhonda.nelson@gsa.gov.

 MODIFICATION PS58 - FINALIZE 4TH AND 5TH FLOORS 

 THIS NOTICE IS FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO THE CONTRACTOR UNDER CONTRACT GS-08P-10-JB-C-0005.  THIS IS NOT A REQUEST FOR PROPOSAL. GSA's Rocky Mountain Region, Public Building Service, Design and Construction Division has issued modification PS58 to include the following work; Completion of the tenant improvements on the 4th and 5th floors.  This work isvalued at $925,702.34. This modification is funded through a reimbursable work authorization. THIS IS NOT A REQUEST FOR PRICE OR TECHNICAL PROPOSALS. Any questions regarding this notice must be submitted in writing via email to Rhonda Nelson at rhonda.nelson@gsa.gov.


Update #12 ·

MODIFICATION PS34 - FIRE LIFE SAFETY SYSTEM
THIS NOTICE IS PROVIDE FOR INFORMATION PURPOSES ONLY.  THIS OPPORTUNITY IS AVAILABLE ONLY TO THE CONTRACTOR UNDER CONTRACT GS-08P-10-JB-C-0005.  THIS IS NOT A REQUEST FOR PROPOSAL.  GSA's Rocky Mountain Region, Public Building Service, Design & Construction Division has exercised a modification for additional design-build services for the Cesar E. Chavez Memorial Modernization project located in Denver, CO.  This modification will provide for the design and construction of a fire life safety system.  This modification is valued at $1,005,000.00.  This contract is funded in part by the American Recovery and Reinvestment Act for 2009.  All reporting requirements from the Contractor are mandated per the Act.  THIS IS NOT A REQUEST FOR PRICE OR TECHNICAL PROPOSALS.  Any questions regarding this notice must be submitted in writing via email to Ms. Rhonda Nelson at Rhonda.Nelson@gsa.gov.

Update #11 ·

MODIFICATION PS31 - ELEVATOR MODERNIZATION AND PT CABLE INVESTIGATION 


THIS NOTICE IS TO PROVIDE FOR INFORMATION PURPOSES ONLY.  THIS OPPORTUNITY IS AVAILABLE ONLY TO THE CONTRACTOR UNDER CONTRACT GS-08P-10-JB-C-0005.  THIS IS NOT A REQUEST FOR PROPOSAL.  GSA's Rocky Mountain Region, Public Building Service, Design & Construction Division has exercised a modification for additional design-build services for the Cesar E. Chavez Memorial Modernization project located in Denver, CO.  This modification will provide for a modernization of the elevator and investigation services for the building's post tension cables.  This modification is valued at $835,571.00.  This contract is funded in part by the American Recovery and Reinvestment Act for 2009.  All reporting requirements from the Contractor are mandated per the Act.  THIS IS NOT A REQUEST FOR PRICE OR TECHNICAL PROPOSALS.  Any questions regarding this notice must be submitted in writing via email to Ms. Rhonda Nelson at Rhonda.Nelson@gsa.gov.

Update #10 ·

THIS NOTICE IS FOR INFORMATIONAL PURPOSES ONLY; NOTICE OF MODIFICATIONS:  PS16, PO17, PS18, PS19.
NOTICE TO CHANGE Point of Contact for Contract Specialist:  Changing from Deborah Godshall to Kip Sheppard.

PS16 - CLIN 0001D - Unforeseen Conditions and Request for Equitable Adjustment -Contaiminate Soils - $69,050.00; CLIN 0001E - Ceilling Replacement part of 2nd, all of 3rd & 6th Floors $633,665.00;  CLIN 0008A - NO COST - ARRA Waiver Granted for Minimum Performance Criteria #7, 16 and 19. 

P017 - Administrative MOD - NO COST - Correction to Government's contracting system.

PS18 - CLIN 0019 -  Upgrade to Elevator Enclosures - $49,425.00

PS19 - Scope Enhancements - CLIN 0001AA Tenant Relocation & New Space Equipment - $40,873.00; CLIN 0001DA - Unforeseen Conditions-Import Structural Fill - $38,663.00; CLIN 0009A - Additional Photovoltaics $133,630.00; CLIN 0018A-Waterline Relocation - $149,969.00;  CLIN 0020- HVAC Zoning $264,916.00; CLIN 0021 - Parking Garage Stall Signage $22,398.00; CLIN 0022 Evaporative Cooling $899,975.00. 

Total Contract Value with all awarded MODs to date is $40,881,861.00.

---End of Notice---

Update #9 ·

THIS NOTICE IS FOR INFORMATIONAL PURPOSES ONLY; NOTICE OF MODIFICATIONS:  PS11, PS12, PS13, PS14, PS15.

 


PS11 - CLIN 0017 - Security Desk Ballistic/Blast Design Build ARRA Funded $26,852.00

PS12 - CLIN 0018 - Waterline Relocation Design ARRA Funded $16,292.00

PS13 - CLIN 0019 - Blast Mitigation Study ARRA Funded $23,521.00

PS14 - CLIN 0001C - Unforeseen Conditions Equitable Adjustment Foundation ARRA Funded $9,212.00

PS15 - CLIN 0015A - DOJ Tenant Improvement- Add Hot Water Heater- RWA Funded $4,284.00


Total Contract Value with all awarded MODS to date is $38,579,297.00.

---End of Notice---

Update #8 ·

THIS NOTICE IS FOR INFORMATIONAL PURPOSES ONLY.  NOTICE OF MODIFICATIONS PA06, PSO7, PS08, PS09, PS10:


PA06 - Admin Mod to Change Contracting Authority from Tracy Troncosa-Maes to Kip Sheppard.  No Cost Modification.

PS07 - Supplemental Agreement to add Davis Bacon Wage Determination for Heavy Construction CO12 for clarification of wages during Garage Demolition Phase.  No Cost Modification.

PS08 - CLIN 0014-SSA Tenant Improvement-$245,928.00-AWARD RWA Funds.
PS09 - CLIN 0015-DOJ Tenant Improvement-$15,826.00-AWARD RWA Funds.
PS10 - CLIN 0016-FNS Tenant Improvement-$23,760.00-AWARD RWA Funds.

Total Contract Value with all awarded MODS to date is $38,499,136.00.

---End of Notice---

Update #7 ·

THIS NOTICE IS FOR INFORMATIONAL PURPOSES ONLY. 
NOTICE OF MODIFICATIONS PS05:

The GSA Region 8, Denver Federal Center, Colorado Service Center has negotiated a Supplement Agreement with GE Johnson Construction Company, Inc. for the Design Build Service contract.  The following SUB-CLINS have been accepted and awarded:

CLIN 0001B - Shades to Building Skin- $97,405.00 - AWARDED ARRA Funded.

CLIN 0013A - Land Vacation- $57,993.00 -AWARDED ARRA Funded.

Total Contract Value with all awarded MODS to date is $38,213,622.00.

---End of Notice---

Update #6 ·

THIS NOTICE IS FOR INFORMATIONAL PURPOSES ONLY. 
NOTICE OF MODIFICATIONS PS02 and PS04:

The GSA Region 8, Denver Federal Center, Colorado Service Center has negotiated a Supplement Agreement with GE Johnson Construction Company, Inc. for the Design Build Service contract.  All of the following CLINS have been accepted
The following CLINS have been added:


CLIN 0001A- MOVE Cost - Add Reconfiguration of Furniture and IT Services; $178,000.00 ARRA Funded.

CLIN 0011-Day Care Renovation-Base; $515,151.00-AWARDED Non-ARRA Fund
CLIN 0011A-Day Care Option I-Exterior Playground Surfaces; $36,853.00 Option
CLIN 0011B-Day Care Option II-Millwork; $66,953.00 Option
CLIN 0011C-Day Care Option III-Flooring; $28,877.00 Option

CLIN 0012-O&M&J Services; $60,000.00-AWARDED ARRA Funded.

CLIN 0013-Design Build Site Work; $509,000.00-AWARDED ARRA Funded.

Total Contract Value with all awarded MODS and Options Exercised to date is $38,058,224.00.

---End of Notice---

Update #5 ·

Request for Qualifications (RFQ) No. GS-08P-10-JB-C-0005 Design Build Services For the Modernization of the Cesar E. Chavez Memorial Office Building Denver, Colorado Phase I Technical Submittal Prepared by: U.S. General Services Administration Public Buildings Service Denver, Colorado Rocky Mountain Region October 7, 2009 TABLE OF CONTENTS PART I: Project Requirements 1.0 Project Overview 1.1 Organization of RFQ 1.2 Services to be Provided 1.3 Project Summary 1.4 Summary of Acquisition Strategy 1.5 Source Selection Evaluation Criteria PART II: Qualifications Submittal Requirements 2.0 Estimated Award Date 2.1 Estimated Completion Date 2.2 RFQ/RFP Evaluation Criteria and Basis of Award 2.3 Questions, Clarifications and Interpretations 2.4 Required Technical Data for Qualifications Submittal 2.5 Qualifications Submittal Preparation 2.6 Qualifications Submittal Delivery Date and Location 2.7 Qualifications Submittal Sealing 2.8 Phase One Submission PART III: Past Performance Questionnaire PART IV: Projects PART V: FAR Clauses APPENDIX: Standard Form 330 Architect-Engineer Qualifications This Procurement has been determined by the SBA as a FULL AND OPEN COMPETITION. Please see attached RFQ Phase I Technical Submittal and SF 330.

The GS-08-JB-12972 - PRESOLICITATION/SYNOPSIS for RECOVERY Design Build for the Modernization of the Cesar E. Chavez Memorial Office Building, Denver, CO will correlate with the following: SOLICITATION # GS-08P-10-JB-C-0005 - RECOVERY- RFQ-Request for Qualifications - Phase I - Design Build Services for the Modernization of the Cesar E. Chavez Memorial Office Building, Denver, CO. This is an ARRA, American Reinvestment Recovery Act Funded project. This is a Design Build Project with Classification Code Y - Construction of Structures and Facilities with NAICS Code 236220 and FSC code of Z111-Maintenance Alteration and Repair of Real Property-Office Buildings.

December 1, 2009 RE: SOLICITATION # GS-08P-10-JB-C-0005 - RECOVERY- RFQ-Request for Qualifications - Phase I - Design Build Services for the Modernization of the Cesar E. Chavez Memorial Office Building, Denver, CO. The following five Design Build Firms were Short Listed and will continue in the RFP Phase II Source Selection process: • Adolfson & Peterson / Page Southerland Page Architecture • GE Johnson / Tryba Architects • Kiewit Building Group / Leo A Daly • PCL Construction / Perkins & Will Architects / CH Guernsey & CO • Swinerton Builders / RNL Architects Anticipated Award Date is March 24, 2010. --end of notice.

NOTICE OF AWARD:

The GSA Region 8, Denver Federal Center, Colorado Service Center has 
conducted a Two Phase Source Selection Process based upon Best Value for the American Reinvestment Recovery Act Funded project:

RECOVERY - Design Build Services Contract for the Cesar E. Chavez Memorial Office Building located at 1244 Speer Blvd in Denver, CO 80204-3518.

GE Johnson Construction Company / Tryba Architects were selected as the Design Build Team.

All nine options were accepted by the Government:
The following Bid Options have been deemed acceptable to award with ARRA funds by the GSA:  3, 5, 6, 7, and 8.  GSA still retains the right to exercise the remaining Bid Options #1, 2, 4 and 9 not awarded here, through the life of the contract.

CLIN 0001:  Base Bid - $28,245,870.00-ARRA Funded
The Base Scope - Design / Build Services work consists of: 001-Parking Garage Removal and Replacement, 002-1st & 2nd Floor Renovation, 003-Elevator & Lobby Upgrade, 004-Swing Space, 005-Bldg Skin Replacement, 006-Ceiling Replacement, 007-Roof & Penthouse Improvements, 008-Condenser and Chilled Water, 009-Mechanical Upgrades, 010-Plumbing Upgrades, 011-Electrical Upgrades.


CLIN 0001A:  Move Costs - $100,000.00-ARRA Funded


CLIN 0002:  Bid Option 1 - Pedestrian Bridge - $656,636.00


CLIN 0003:  Bid Option 2 - Additional Parking - $1,976,302.00


CLIN 0004:  Bid Option 3 - First and Second Floor Renovation and Elevator and Elevator Lobbies.    $1,259,781.00-ARRA Funded


CLIN 0005:  Bid Option 4 - Blast Mitigation.   MOD $3,791,555.00


CLIN 0006:  Bid Option 5 - Ceiling replacement for Floors 7, 8, 9 and part of 2.  $1,071,426.00-ARRA Funded


CLIN 0007:  Bid Option 6 - LEED Silver upgrades.  $344,831.00-ARRA Funded


CLIN 0008:  Bid Option 7 - ARRA minimum performance checklist upgrades.  $99,630.00-ARRA Funded


CLIN 0009:  Bid Option 8 - Photovoltaic on the roof of new parking garage. $1,098,541.00-ARRA Funded


CLIN 0010:  Bid Option 9 - Demo and replace fire alarm system MOD.  $783,931.00


Anticipated Contract Completion Date is November 1, 2012. 

Update #4 ·

NOTICE OF AWARD:

The GSA Region 8, Denver Federal Center, Colorado Service Center has 
conducted a Two Phase Source Selection Process based upon Best Value for the American Reinvestment Recovery Act Funded project:

RECOVERY - Design Build Services Contract for the Cesar E. Chavez Memorial Office Building located at 1244 Speer Blvd in Denver, CO 80204-3518.


GE Johnson Construction Company / Tryba Architects were selected as the Design Build Team.


Anticipated Contract Completion Date is November 1, 2012. 

Update #3 ·

December 1, 2009

RE: SOLICITATION # GS-08P-10-JB-C-0005 - RECOVERY- RFQ-Request for Qualifications - Phase I - Design Build Services for the Modernization of the Cesar E. Chavez Memorial Office Building, Denver, CO.



The following five Design Build Firms were Short Listed and will continue in the RFP Phase II Source Selection process:



Adolfson & Peterson / Page Southerland Page Architecture

GE Johnson / Tryba Architects

Kiewit Building Group / Leo A Daly

PCL Construction / Perkins & Will Architects / CH Guernsey & CO

Swinerton Builders / RNL Architects



Anticipated Award Date is March 24, 2010.

--end of notice.

Update #2 ·

The GS-08-JB-12972 - PRESOLICITATION/SYNOPSIS for RECOVERY Design Build for the Modernization of the Cesar E. Chavez Memorial Office Building, Denver, CO will correlate with the following:



SOLICITATION # GS-08P-10-JB-C-0005 - RECOVERY- RFQ-Request for Qualifications - Phase I - Design Build Services for the Modernization of the Cesar E. Chavez Memorial Office Building, Denver, CO.



This is an ARRA, American Reinvestment Recovery Act Funded project.



This is a Design Build Project with Classification Code Y - Construction of Structures and Facilities with NAICS Code 236220 and FSC code of Z111-Maintenance Alteration and Repair of Real Property-Office Buildings.

Update #1 ·

Request for Qualifications (RFQ)

No. GS-08P-10-JB-C-0005



Design Build Services

For the Modernization of the

Cesar E. Chavez Memorial Office Building

Denver, Colorado



Phase I

Technical Submittal



Prepared by:

U.S. General Services Administration

Public Buildings Service Denver, Colorado

Rocky Mountain Region October 7, 2009





TABLE OF CONTENTS





PART I: Project Requirements



1.0 Project Overview

1.1 Organization of RFQ

1.2 Services to be Provided

1.3 Project Summary

1.4 Summary of Acquisition Strategy

1.5 Source Selection Evaluation Criteria



PART II: Qualifications Submittal Requirements



2.0 Estimated Award Date

2.1 Estimated Completion Date

2.2 RFQ/RFP Evaluation Criteria and Basis of Award

2.3 Questions, Clarifications and Interpretations

2.4 Required Technical Data for Qualifications Submittal

2.5 Qualifications Submittal Preparation

2.6 Qualifications Submittal Delivery Date and Location

2.7 Qualifications Submittal Sealing

2.8 Phase One Submission





PART III: Past Performance Questionnaire



PART IV: Projects



PART V: FAR Clauses



APPENDIX:



Standard Form 330 Architect-Engineer Qualifications





This Procurement has been determined by the SBA as a FULL AND OPEN COMPETITION.



Please see attached RFQ Phase I Technical Submittal and SF 330.

Files

File Type Posted
RFI4.doc DOC document
CHAVEZ DB RFI 3 AMENDMENT 4.pdf PDF
RFQ CHAVEZ DB RFI 2 AMENDMENT 3_0001.pdf PDF
ARRA CHAVEZ DB RFI 1 .pdf PDF
RFQ CHAVEZ PART IV PROJECTS DB TEAM.pdf PDF
RECOVERY CHAVEZ DESIGN BUILD RFQ PHASE I.pdf PDF
sf330_e 1 .pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors