RECOVERY--C--TMA-N7, Structural Repairs to Water Retention Pond Dam

Award Notice Posted

Solicitation number
N4008009R4466
Agency
Awarded
to GDI / Allen & Shariff Joint Venture
Set-aside
Competitive 8(a)

Opportunity facts

Contract number
N40080-06-D-0500-0042 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

RECOVERY--PROJECT NUMBER TMA-N7, TITLE PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: 8(a) competitive procurement to Grunley/ Goel JV LCC (N62477-06-D-0004), FEMCO, Inc. (N62477-06-D-0499), Donley-Kirlin JV (N62477-06-D-0498), and GDI/ Allen & Shariff JV (N62477-06-D-0500).

This action has been awarded under the American Recovery and Reinvestment Act of 2009. In compliance with this Act, the Government posts this notice that award was made under Contract N40080-06-D-0500-0042 in the amount of $617,869.00 to GDI/ Allen& Shariff JV of Bladensburg, Maryland.

Summary of Project Scope: The work to be performed for TMA-N7, Structural Repairs to Water Retention Pond Dam at National Naval Medical Center, Bethesda, Maryland. This award associates with Presolicitation Notice posted on August 12, 2009.

Update #1 ·

"THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY". THIS OPPORTUNITY IS AVAILBLE ONLY TO CONTRACTORS UNDER 8(A) MULTIPLE AWARD CONSTRUCTION CONTRACT, VARIOUS LOCATION,NAVFAC WASHINGTON

This is an 8(a) competitive procurement to Grunley/ Goel JV LCC (N62477-06-D-0004), FEMCO, Inc. (N62477-06-D-0499), Donley-Kirlin JV (N62477-06-D-0498), and GDI/ Allen & Shariff JV (N62477-06-D-0500)

Title: STRUCTURAL REPAIRS TO WATER RETENTION POND DAM

This project involves repairing the degraded dam and dredging the in-stream pond located on Stoney Creek on the National Naval Medical Center facility in Bethesda, MD. The work includes two bio-retention areas located adjacent to the pond. A temporary stone access road will be constructed, allowing dump trucks to receive and haul the dredged material to a temporary drying area above the second bio-retention area. Once the area around the dam is dredged and inspected by the government-designated Engineer, both sides of the dam will be faced with shot-crete. The upstream wing walls and bottom of the damn will be filled with grout and sealed with compacted clay and grouted rip rap to correct existing seepage problems and replace lost soil. The culvert between the bio-retention areas will be replaced and the existing path reconstructed. The rest of the site will be restored to existing conditions and stabilized with natural vegetation. Performance period is estimated at 500 calendar days from date of award. The North American Classification System Code for this project is 236220. The RFP will be sent to NAVFAC Washington's 8(a) MACC Contractors Grunley/ Goel JW LCC, FEMCO, Inc., Donley-Kirlin JV, and GDI/ Allen & Shariff JV. The estimated date for release of the RFP is 12 August 2009. The time for receipt of proposals will be provided in the solicitation notice.