RECOVERY - Alpine Tunnel Historic Masonry Stabilization - Grand Mesa, Uncompahgre and Gunnison National Forests

Award Notice Posted

Solicitation number
AG-82B1-S-09-0112
Agency
Awarded
to Back Again Restorations
Set-aside
No set-aside

Opportunity facts

Contract number
AG82B1C100021 Federal IDV award
NAICS code
238140 Masonry Contractors
PSC
Not on record
Place of performance
The project is located in eastern Gunnison County, northeast of the town of Pitkin. It is accessible by narrow graded dirt road. It is located at 11,600 feet in elevation. Offerors should not expect to access this site after October 15 or before June 15 most years. To reach the site, drive east on US Highway 50 from Gunnison to Parlin. Turn northeast onto County Road and go to Pitkin. Continue three miles past Pitkin on FR765 to the tunnel turn-off, FR Road 839, and turn right (east). Drive approximately 10 miles on this narrow dirt road to the site. The site is accessible by regular two-wheel drive. Upon reaching the Tunnel parking area, walk past the gate to the wood frame Telegraph Office. Both masonry ruins are located directly across the grade/road from the Telegraph building. Pitkin, Colorado 81241, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

THIS AMENDMENT IS TO PROVIDE INFORMATION ON A PREBID TOUR AS FOLLOWS:



Interested Offerors show meet on September 23, 2009 at 11:00AM in the town of Pitkin Town Hall parking lot, beside the Pitkin Hotel. We will proceed to the historic district from there. Drive east on US Highway 50 from Gunnison to Parlin. Turn northest onto County Road 3101 and go about 18 miles to Pitkin. Go several blocks into town on the main road, to a two-story hotel on the left with a large three story town hall building behind it. The meeting will be held in the parking lot or the hotel lobby, followed by the trip to the stabliziation site.

Update #2 ·

Work consists of furnishing labor, equipment and materials to stabilize and preserve the standing random stone masonry walls of structures in the Alpine Tunnel Historic District for improved visitor safety and historical experience.



This contract will have a Base Item and two Optional Items. The Base item will repair and stabilize on collapsed building (the Engine House), along with vegetation removal and applying preservative to certain embedded wood members. Optional item 1 will treat the masonry at a second stone ruin, the Section House. Optional item 2 will construct two short (25 feet long each) compacted aggregate gravel pathways at the Engine House, by clearing large stone rubble, grading and applying trail material to provide a smooth walking surface.



The project estimate is between $25,000 and $100,000. Payment protection will be required per the Miller Act and Davis-Bacon wage rates will apply.



All responsible sources may submit a quotation which will be considered by the Government. In accordance with FAR 4.1102(a), prospective contractors must be registered in the Central Contractor Registration (CCR) database prior to award of a contract. Lack of registration in the CCR on the part of the offeror will render an offeror ineligible for award. Offerors may obtain information on registration and annual confirmation requirements by calling 888-227-2423, or via the Internet at http://www.ccr.gov//.



THIS AMENDMENT IS TO ALLOW FOR FULL AND OPEN COMPETITION - there is no set-asides on this project.

Update #1 ·

Work consists of furnishing labor, equipment and materials to stabilize and preserve the standing random stone masonry walls of structures in the Alpine Tunnel Historic District for improved visitor safety and historical experience.



This contract will have a Base Item and two Optional Items. The Base item will repair and stabilize on collapsed building (the Engine House), along with vegetation removal and applying preservative to certain embedded wood members. Optional item 1 will treat the masonry at a second stone ruin, the Section House. Optional item 2 will construct two short (25 feet long each) compacted aggregate gravel pathways at the Engine House, by clearing large stone rubble, grading and applying trail material to provide a smooth walking surface.



The project estimate is between $25,000 and $100,000. Payment protection will be required per the Miller Act and Davis-Bacon wage rates will apply.



All responsible sources may submit a quotation which will be considered by the Government. In accordance with FAR 4.1102(a), prospective contractors must be registered in the Central Contractor Registration (CCR) database prior to award of a contract. Lack of registration in the CCR on the part of the offeror will render an offeror ineligible for award. Offerors may obtain information on registration and annual confirmation requirements by calling 888-227-2423, or via the Internet at http://www.ccr.gov//.



Files

File Type Posted
Revised Schedule of Items.rtf RTF text file
DSCN8456 AMEND 1.JPG JPG image
DSCN8465 AMEND 1.JPG JPG image
DSCN8461 AMEND 1.JPG JPG image
DSCN8463 AMEND 1.JPG JPG image
SF 30 AMEND 1.pdf PDF
Alpine.Tunnel.Stabilization_contract_specs.pdf PDF
2_SECTION_HOUSE.pdf PDF
Exp. Qstnr.doc DOC document
SF 18.pdf PDF
Engine House 1.pdf PDF
Specifications.pdf PDF
AG-82B1-S-09-0112.pdf PDF
Alpine_Tunnel_Topo.pdf PDF
wage determination.txt TXT text file
Alpine Tunnel 1.pdf PDF
3_Walkway_Dwg.pdf PDF
Show all 17

Notice history

Notice Type Posted
Recovery - alpine tunnel stabilization - grand mesa, uncompahgre and gunnison national forest Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors