RECOVERY - Albany Fire and Life Safety System Improvements, Main Building and West Annex Building, Albany, CA
Award Notice Posted
- Solicitation number
- AG-95CV-S-09-0019
- Agency
-
Central Program Planning Coordination and Support
Agricultural Research Service, Department of Agriculture
- Awarded
- to Sergents Mechanical Systems Inc.
- Set-aside
- HUBZone
Opportunity facts
- Contract number
- AG-95CV-C-10-0002 Federal contract award
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Unable to create uploadable Amendment 01, however, here is text of it:
Section 15300-2, para. 1.4 Quality Assurance "...California licensed contractor in possession of a valid C-16 license" should be replaced with "...licensed Fire Protection contractor". And "...whose business is located within a 75-mile radius of the project site" should be replaced with "with the ability to respond within 48-hours for non-emergencies and within 24-hours for emergency situations." Amendment 01 will be posted soon.
Update #2 ·
The work consists of the provision of all material, labor, and equipment for a new fire standpipe system to serve existing stairways of the Main Building and West Annex Building as shown on the Drawings and in the Specifications. Provide core drilling for pipe penetrations through existing construction with the necessary care and caution. Replace existing fire department connection with new. Connect new piping systems to the existing fire protection systems and the existing fire pump discharge mains. Connect new tamper switches to the existing Simplex-Grinnell addressable fire alarm control panel signal initiation circuits for all new alarm devices. The estimated price range is $250,000 to $500,000. There will be a site visit Sept 16 at 9:00 a.m. Contact Tom Moreno (510)559-5622 or email: thomas.moreno@ars.usda.gov for directions.
Update #1 ·
The work consists of the provision of all material, labor, and equipment for a new fire standpipe system to serve existing stairways of the Main Building and West Annex Building as shown on the Drawings and in the Specifications. Provide core drilling for pipe penetrations through existing construction with the necessary care and caution. Replace existing fire department connection with new. Connect new piping systems to the existing fire protection systems and the existing fire pump discharge mains. Connect new tamper switches to the existing Simplex-Grinnell addressable fire alarm control panel signal initiation circuits for all new alarm devices. The estimated price range is $250,000 to $500,000.
Files
| File | Type | Posted |
|---|---|---|
| 0914 Addendum 01 092209.pdf | ||
| 15300-1(MissingPg).JPG | JPG image | |
| S090019A1.pdf | ||
| GD9-4-09.doc | DOC document | |
| JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION.docx | DOCX document | |
| GD8-21-09.doc | DOC document | |
| S090019a.doc | DOC document | |
| S090019.pdf | ||
| 0914 Albany Fire Life_final dwgs 072309.pdf | ||
| 0914 Albany Fire Life_final specs bound 072309.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity