RECOVERY--, AJXF 09-1508, Repair/Upgrade All Restrooms in Comm HQ Bldg 1558

Award Notice Posted

Solicitation number
RecoveryAJXF-09-1508
Agency
Awarded
to 1Ci, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
FA4416-09-D-0005-0012 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Building 1558 Andrews AFB, Maryland 20762, United States

Notice details come from SAM.gov. Updated .

Notice text

RECOVERY - THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER THE SABER INDEFINITE DELIVERY CONTRACT, FA4416-09-D-0005.

Furnish all supervision, plant labor, transportation, equipment, materials, and perform all operations necessary to upgrade the male and female restrooms in the main front hallway of building 1558 and to meet ADA compliance mandates. The dimensions of the restrooms and the location of new applicable fixtures in the restrooms must be designed and installed in accordance with all applicable ADA requirements. The floors and walls of the restroom must be tiled according to patterns and color schemes established by base standards. The fixtures and sanitary accessories, such as toilets, urinals, and sinks shall be installed in compliance with ADA requirements where applicable. New toilet partitions (and urinal dividers for the men's room) must be installed for each restroom. New mirrors shall be installed over the new countertops and sinks. Install new GFI duplex receptacles above and below the sinks for the restrooms. Perform all operations necessary to completely tile the floor and walls. New personnel doors with louvers and associated hardware shall be installed for the entrances to the 2 restrooms. Restroom tile colors and patterns shall be in accordance with established base standards. Provide and install one water heater in a designated area to accommodate the new power plant restroom configuration as necessary. Provide and upgrade the 2 existing restroom exhaust ventilation systems. Refer to design concept on attached partial prints provided by 316 CES/CECS. These prints can be used as required to layout and plan for the new restroom configurations as necessary. Any possible asbestos containing material shall be tested prior to any demolition work. If the asbestos testing yields positive results, the proper abatement measures shall be addressed.


Files

File Type Posted
MOD SOW B1558 06-03-09.doc DOC document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors